Dododawa1's Posts
Nairaland Forum › Dododawa1's Profile › Dododawa1's Posts
1 2 3 4 5 6 7 8 ... 121 122 123 124 125 126 127 128 129 (of 588 pages)
AustineE1:compared to professor DAVID umahi in braggadocious |
NO Love In This Country |
But People can buy your/ download your music on FRIDAY. Not different from Nigeria politicans, always looking for excuse. |
I know say 100% Na THEM AJEH |
Aunty Ramota Na Nigeria celebrity ( yoruba film Nollywood) Incase you don't know her. |
APC government |
😂😂⭕️📢😂😂😂 Nigeria leaders and talk talk talk talk talk talk |
You are just lucky for Nigeria corrupted system Criminal man |
Southeast Don't want to be left out in APC national cake |
Natural beauty Not Yellow fever in town now |
Calculator everywhere |
She pour angry of peanut payment on Pupil I blamed APC government |
Government Of Thieves Pardon |
Only God will Deal with Yayaha bello and co. |
Nawooo Fuel Gas Diesel needed attenuation |
Believeintruth:Dont paraded. Stop calling Lagos state = Stop dragging southwest state (lagos) and respect Yoruba culture |
RAPSTARBENHOPE:KWARA FALLEN INSIDE NORTH CENTRAL |
bewla:PROPHET BEWLA |
Believeintruth:Guy calm down. Every tribes should respect their HOST. ONE NIGERIA. |
WE NEEDED LOVE LOVE LOVE LOVE above religious and tribes |
RUBBISH POST BY ENEMIES OF YORUBA THEIR ARE BOTH OMOLUABI BOT YORUBA GREAT. |
Oyo State Governor, Seyi Makinde, has weighed in on the cost of the controversial Lagos-Calabar Coastal Highway project that was approved by President Bola Tinubu. Makinde, who spoke at an event in a viral video on Friday, said there was no need for the Minister of Works, David Umahi, to be “dancing around the cost” of the project. The governor was reacting to a heated exchange that unfolded live on television between Umahi and Arise TV presenter Rufai Oseni on Tuesday. Oseni had requested the minister to analyse the cost of the project, kilometre by kilometre. The request didn’t sit well with Umahi, who declared himself “professor” of practice in engineering while elaborating that the costs of the road in kilometres are not the same and would be too complicated for the journalist to understand. He said, “These are elementary questions. And it makes no sense (sic). A process is ongoing, payment has been made, and you are saying, ‘how has this money been utilised?. The money is meant for the project, and it will be paid according to the work done. “When a certificate is generated, and it is approved through a process in the Ministry of Works, it will then be given to the funders, who will, in turn, check if the works were done. How can you be asking for cost of kilometre? The prices are different. The next kilometre is different from the next kilometre. Keep quiet and stop saying what you don’t know. I’m a professor in this field. You don’t understand anything. I understand engineering very well. You have no knowledge of what you ask. You have no knowledge of what you’re asking. Oseni, who also refused to back down, responded, “Minister, it’s alright, keep dignifying yourself, and let the world know who you truly are.” However, justifying the journalist’s question to the minister, Makinde said, “They asked a minister how much is the coastal road is, and then you (Umahi) are dancing around and going to say that no, the next kilometre is different from the next kilometres. Then what is the average cost? “When we did the Oyo to Iseyin road then, it was about N9.99 billion, almost N10 billion. About 34 or 35 kilometres, average cost is about N238 million per kilometre. “But when we did Iseyin to Ogbomoso, that was 76 kilometres, it was about N43 billion, average cost is about N500 million per kilometre. And we had two bridges, one over the Ogun river and then one at Ogbomoso end.” The PUNCH reports that last year, the Federal Government announced the commencement of construction work on the 700km Lagos-Calabar Coastal Highway, which spans nine states and includes two spurs leading to the northern states. Umahi made the announcement during the official handover of the first phase of the project, made up of 47.47 kilometers of dual carriageway, to Hitech Construction Company Limited, and which is to be constructed in concrete pavement. This was contained in a statement issued by his Special Adviser (Media), Uchenna Orji. According to him, the Minister who was in company with the Federal Ministry of Works’ Controller in charge of Lagos State, Mrs O. I. Kesha, emphasised the need for all contractors handling Federal Government’s road projects to deliver within a record time, noting that the government would not allow variation arising from delays or slow pace of work once mobilisation had been done.
|
I blamed HAUSA (Nigerians citizen) giving FULANI chance to dominated them |
Bayo Ononuga for Tinubu Adeyinka lere for wike Feminist Adeshina for Buhari Are all called SHIT clearing, SHIT clearing. |
Nigeria Problems is too much. Let divided |
100% True AJEH APC From dullard to drug Lord regime |
Their limit is well know Unlike One tribe |
Dangote And Nigeria Is like landlord to Tenant |
Mrfixitt:show us your region. |
This tribe just wanted to TAKE OVER LAGOS STATE By force. |
hope4nigeria:👌 |
Eniitankorede:😂😂😂😂 |
1 2 3 4 5 6 7 8 ... 121 122 123 124 125 126 127 128 129 (of 588 pages)