Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,161,208 members, 7,846,009 topics. Date: Friday, 31 May 2024 at 09:14 AM

Everythingcad's Posts

Nairaland Forum / Everythingcad's Profile / Everythingcad's Posts

(1) (of 1 pages)

Science/Technology / Things You Must Know About Piping And Instrumentation Diagrams (p&id) by everythingcad(f): 12:43pm On Feb 19, 2016
P&IDs stands for Piping and Instrumentation Diagrams.

Piping has to do with pipes inside a facility (Like refineries, Oil and gas fields, Power plants, Chemical plants etc).
NOTE: The term Piping is different from Pipeline. Piping are pipes inside a facility while pipelines are long distant lines outside the facility.

The Instruments measure four major variables namely:

Temperature
Pressure
Level and
Flow

For an instrument loop to be complete, there has be a

Sensor
Transmitter
Recorder/Comparer and
Control Valve carrying out the correcting function


To interpret P&ID symbols you need to be conversant with relevant
standard.

To learn more about Piping please follow the link below

http://everythingcad..com/2016/02/presents-normal-0-false-false-false-en.html

1 Share

(1) (of 1 pages)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 6
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.