Do you want to know building materials market price today just chat me and know the real price am here to serve you thanks
|
Work at Agukwu Nri Anambra state come let me know the kind of house u need let us discuss and put it in order
|
Let discuss about building construction what do you want to know about building construction |
Hostel at Imo State nekede what do you want to know about building construction
|
30 rooms hostel at nekede Imo State under construction what do u want know about the building
|
This land is located at umuchigbo Nike Enugu state come and buy your genuine land u can come for inspection If you need the video of the land I will send it to you on Whatsapp
|
Setting out duplex at oji Imo State what do you want to know about that ur building project
|
Name. Qty. Rate. Total Block. 4000. 500. 2,000,000 Cement. 120. 10,000. 1,200,000 Sand. 6trips. 60000. 360,000 Chipping. 20turns. 180000. 360000 16mm. 60. 16000. 960000 12mm. 80. 9500. 760000 8mm. 60. 4500. 270000 1×12. 150. 2500. 375000 1×9. 20. 2500. 50000 1×6. 10 1250. 12500 B wire. 20kg. 60000 Neil. 2. 60000 Transportation. 100000 Water. 100000 Total of both materials and labor 8,367,500
|
Eatery at Nenwe on progress what do you want to know about the building ask me
|
What do you want to know about building construction |
What kind of building do you want am at your door step to help you build your dream home just contact me, if you need land contact me any where in Nigeria I we give you what you desire with trust and truth
|
6 flat at umuchigbo Nike Enugu adoration side Peg 4 bundles ×2000=8000 Block 2000pic× 500=1,000,000 Sand 12trips× 60000=720,000 Local stone 6trips × 85,000=510,000 Gravel 3 trips ×80000= 240,000 chipping 50turns 900,000 (10turns 180,000×50=900,000) Cement 10,000 per bag 235bag× 10000= 2,350,000 Filling retract 10tires 15trips ×30000=450,000 16mm rod 50 length ×16000=800,000 12mm rod 65 length × 9500=617,500 8mm rod 50 length ×4500=225,000 Banding wire 20kg 30,000 1×12 wood 50× 2500=125,000 2×2 wood 50×700=35000 Neil one bag 30,000 Water 150,000 Total cost of materials used in 6 flat two bedrooms 8,182,500 Cost of labor work 1,852,000 Total cost of materials and labor for foundation 10,034,500 Let us build for you with trust and truth
|
Cost of materials as of today 16mm rod 16000 12mm rod 9500 8mm rod 4500 Banding wire 20kg 30000 Sand 6 tires 60000 10turns of chipping 18000 Local stone 6 tires 85000 Gravel 6 tires 80000 Cement 10000 1×12 wood 2500 2×2 700 |
Breakdown of 6 bedroom flat at umuchigbo Nike Enugu adoration side |