megastu: We have completed the entire plastering, dressing, and installing of metal doors in this house. Burglary protectors as well as window glass has been fully installed. The only works remaining here are the wooden door frames, dressing them, doing something about the floors, floor tiles, wall tiles, frontal tiles and plumbing fittings. Something should also be done about the kitchen, I have a guy who can make the kitchen so beautiful that people will shout, but he is not cheap. This will be followed by electrical fittings and then we shall be having our first house warming party in this forum .good@spyder, please after roofing comes 1st stage electricals and installation of plumbing pipes. What comes next? Roughly how much would be spent for rough electrical. If you can give me your number, it will be helpful too. |