PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 8:51pm On Mar 16, 2019
Forming was done today.
And we were being careful because of the ground type which had several step down because of the slope.
So we were able to finish the forming today.
Before the forming was done, stones were poured around the foundation.
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 9:16pm On Mar 15, 2019
Foundation digging images

PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 9:11pm On Mar 15, 2019
Takoro13:
How many blocks you made from 7trip and 50 cements
Close to 2000 blocks
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 9:10pm On Mar 15, 2019
Takoro13:
This is for foundation I supposed. Close to my four bedroom foundation work.
Yea for the foundation
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 9:10pm On Mar 15, 2019
Takoro13:
Show us the level of the work so people can talk about the expenses you post below.

Good luck
Okay
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 8:01am On Mar 14, 2019
Molding expenses

Cement 50 bags = 117000
Sand 7 trips. = 87500
Water = 5000
Payment of molders =40000

Money for design and plan approval =100000
Survey was done some years ago so it wasn't that expensive as it is now.
So I spent 50k
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 7:42am On Mar 14, 2019
Rods 12mm 20 pieces. = 42000
Gravel 2 trips. = 48000
Sharp sand 2 trips = 25000
Flat Board 40 pieces. = 34000
Quarter rod 20 pieces = 8750
Bounding wire = 1000
Peg. = 1600
3inches nail half bag. = 4000
2 by 2 wood 20 pieces = 6000
Cement 20 bags. = 47000
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 7:30am On Mar 14, 2019
Good morning everyone
Let me give a total and breakdown of the money I have spent so far for buying of materials needed for the foundation and block molding.
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op):
Takoro13:
Like how many bags of cement do you think will finish four bedroom floor? 48-50 right? That is around 120k. Am afraid and pray to God
Bro in building you can't give a direct cost, because anything can come up on the way and there is loss sometimes. So I will advice you to work gradually not putting your self under pressure. You will finish your project by god's grace.
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 1:40pm On Mar 12, 2019
Takoro13:
That is not professional I think. The last experience I hard was laying concrete on the blocks all around the the foundation blocks
Yea,
It's not but it's a way to save but if the money is available you can cast all it shouldn't cost you more than 1 trip of stone.
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 1:39pm On Mar 12, 2019
Takoro13:
My 6" is going for 40 per bag. Hope is OK
It's okay at 40 per bag.
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 6:05am On Mar 12, 2019
musachara:
can you also include costing in your thread for those of us planning to build in the mere future
Okay,
I will do a proper calculation of what I have spent so far.
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 9:46pm On Mar 11, 2019
Takoro13:
Maintain 35 per cement bag, please. Though, I introduced pillars at strategic places of the house..
I pray to do dpc/German floor but money money money

Thanks
You can do DPC to some point then leave the others
For example; your dpc should be half around the high part of your foundation by that you have saved money
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 9:38pm On Mar 11, 2019
Takoro13:
Maintain 35 per cement bag, please. Though, I introduced pillars at strategic places of the house..
I pray to do dpc/German floor but money money money

Thanks
Yea, I will maintain that range though I am molding 6inches not 9inches so the mixture might give you two or three more blocks
PropertiesRe: Building A Low Cost Four Bedrooms Bungalow In Ilesa by joshuachuks: 9:29pm On Mar 11, 2019
Takoro13:
Foundation


700 blocks of 9" were moulded for the foundation work at the rate of 35 blocks per cement. One and half load of gravel, 30 bags of cement and half load of sharp sand.
I see your work bro
God help us finish it
God strengthen you. Amen.
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 6:44pm On Mar 11, 2019
Takoro13:
How many blocks per bag of cement?
Make sure you wet the blocks very well to achieve more reliable outcome.

I moulded 37-38 per bag but want to reduce it to not more than 35 with two times wetting.

Congrat bro
I molded 35-38 but sometimes the mixture might give you up to 40, so it's not definite
But I will also do a DPC casting when I get to my desired foundation height.
Congrats to you too
I wish you success in your building process.
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 7:10am On Mar 11, 2019
minasota:
How much where you charged to mould a bag of cement
I used two different molders and one charged 800 per bag
Then I met another guy that collected 700 per bag
So the two molded together but after the first day, I paid the both 700 respectively.
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 8:44am On Mar 09, 2019
Memejem:
You said the pillars will be filled AFTER the dpc. I’m asking “are there no pillars included in your dpc” . Most structural meaningful pillars begin from foundation to whatever level is necessary to provide support for the structure.

I’m asking if your pillars are structural or for aesthetics?
Definitely, the pillars will start from the foundation to the DPC then some will be discontinued then the necessary ones will get to the lintel
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 10:14pm On Mar 08, 2019
Memejem:
The pillars don’t start from within the foundation?
I don't understand your question please explain better
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 8:09pm On Mar 08, 2019
Today was a success.
I was able to make it up to the 2000 blocks which we will use to start up the foundation
Thanks to everyone following this page, thank you for your encouragement and prayers I hope to start up the foundation by next week, because the block needs to become strong by watering them.
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 6:18am On Mar 08, 2019
Memejem:
Block making in Nigeria is not standardized. But more power to you. As long as you have a trusted engineer helping and guiding you I’m sure your build will go well.

Will there be pillars included in the foundation of your build.

Also, I am a female. Thanks
There will be pillars and it will be filled in and out after casting the DPC
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op):
joycluv:
. I keep wondering what's so special about dis 9" blocks. I have seen someone build a duplex with 5" blocks from foundation to level and dat house is still solidly standing while the ones built with the "almighty" 9" keep collapsing here and there. I am not condemning the use of 9" but we shouldn't make it look like if someone doesn't use 9", then his house is inferior. It should be a matter of choice. My submission though! Op congrats and more grace to finish!
It's all about choice and the amount of pillars you want to use.
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 8:46pm On Mar 07, 2019
Memejem:
Are you not going to use 9 inch blocks for the foundation?

Congrats on your build!!
No
I feel 6 inches will be okay because I intend filling in and out of the building.
Thanks for your concern brother, I am always open to suggestions.
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 8:41pm On Mar 07, 2019
Memejem:
Are you not going to use 9 inch blocks for the foundation?

Congrats on your build!!
Thank you boss
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 12:58pm On Mar 07, 2019
More photo

PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 12:56pm On Mar 07, 2019
Molding began today and they have molded more than 200 6 inches blocks and more counting

PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 10:31am On Mar 06, 2019
Building plan
It has an attachment of two units of room and parlor

PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 1:57pm On Mar 05, 2019
PYSHomesUK3:
nice one C my
Thanks boss
PropertiesRe: Building A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 12:23pm On Mar 05, 2019
Clearing of land was done today in anticipation of blocks molding which will begin tomorrow morning

PropertiesBuilding A 3 Bedroom Bungalow In Delta State by joshuachuks(op): 8:52am On Mar 05, 2019
By the grace of God I have been able to learn from many guys here in nairaland, going through the comment section and the proper explanation of spyder880, century106 I decided to take the risk of supervising my project my self although I am an engineer by profession but with little experience.
After I followed mr century's topic then eventually met mr spyder880 works I learnt a lot because he takes his time to explain every bit of process to us.
So I will start by uploading the floor plan followed by the picture of the land which is being cleared now.
I am opened to advise, criticism and corrections.
AgricultureRe: Pepper And Tomatoes Business, Come In And Share Your Experiences by joshuachuks:
...
AgricultureRe: Pepper And Tomatoes Business, Come In And Share Your Experiences by joshuachuks:
sessytony:
hmmm, so it's necessary I source for the pepper/tomatoes myself. I then follow the trailer to the delivery location or someone will take the delivery for me?? I will like to have your contact for more clarification. This is my contact 08108636582
Call me so I can give you the number of someone that you will meet in mile 2 market when you get there he will tell you how it works

1 2 3 4 5 (of 5 pages)