Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 11:45pm On Aug 19, 2020
Roof cover

Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 6:59am On Aug 11, 2020
Plastering the parapet before covering the roof carcass
Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 6:58am On Aug 11, 2020
We got here.

Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 7:58am On Aug 01, 2020
Here we go.... crowning our efforts

Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 9:24pm On Jul 27, 2020
Parapet formwork ready for concrete placement
Progress!

Properties / Re: Piling Operations In Portharcourt, And Surrounding Riverine Communities by malkomx(m): 8:16am On Jul 26, 2020
Piling operations
Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 7:17am On Jul 25, 2020
Parapet rebar works almost immediately

Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 10:44pm On Jul 23, 2020
Parapet

Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 10:42pm On Jul 23, 2020
Roofing wood

Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 3:00pm On Jul 20, 2020
Front beam works ongoing

Properties / Re: Piling Operations In Portharcourt, And Surrounding Riverine Communities by malkomx(m): 7:30am On Jul 20, 2020
Men at work
Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 7:29am On Jul 20, 2020
Progress
Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 9:16pm On Jul 19, 2020
loffers:


Nice work.
Parapet and roofing next
Sure. Thanks
Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 11:56am On Jul 19, 2020
Getting there already
Speed!

Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 11:36am On Jul 17, 2020
Soak away completed

Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 11:33am On Jul 17, 2020
Progress

Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 1:51pm On Jul 16, 2020
Works on the front columns going on simultaneously

Properties / Re: Piling Operations In Portharcourt, And Surrounding Riverine Communities by malkomx(m): 9:35am On Jul 16, 2020
Placing rebar cage in a 12m bored pile of Dia450mm

Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 11:02pm On Jul 15, 2020
chimexdnice1:
What's the advantage(s) of using a DPM on a decking if the carpenter did a good woodwork underneath it?

Water in the right quantity as an integral component of concrete is as important as the cement used.
No matter how tightly placed your wooden form work is, water will still leak through the joints. The wood itself has a high capacity to soak water.
These will reduce the amount of water available for the complete hydration of the cement in the concrete mix
The nylon we use as DPM serves two purposes namely:
1. Retains water in the concrete mix to ensure complete hydration of cement and proper non-brittle hardening
2. Helps preserve the wooden form work for future use since soaked wood will loose its strength as a result of water-induced fermentation.
Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 10:44pm On Jul 15, 2020
Lintel operations

Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 8:17am On Jul 15, 2020
Block work hitting lintel level already

Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 9:42pm On Jul 13, 2020
joycluv:
How can one estimate the Quantity of iron bars for decking?
The size of your deck will determine the quantity of rebars
While the load coming on the deck will determine the size and number of rebars for the beams.
All these have been predesigned and shown with the bending schedule on your structural drawings
Let a qualified engineer interprete your structural drawings for you and calculate the quantity of the various sizes of rebar and their correct positioning on your deck.
Except you are a civil/structural Engr decking reinforcements is not a DIY affair
Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 9:32pm On Jul 13, 2020
Milestone 3:
We are up and running
Let’s make up for lost time
Block work + rebar extension

Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 9:28pm On Jul 13, 2020
mexxy1:



Okay. I had thought that amount was from foundation.

Keep up the good work.
Thank you for your interest
Properties / Re: Piling Operations In Portharcourt, And Surrounding Riverine Communities by malkomx(m): 6:11pm On Jul 12, 2020
Considering building on reclaimed land?
Let’s handle your pile foundation for you
Quality job within a great budget
Men@work in Asari/Toru LGA in Rivers State

Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 5:57pm On Jul 12, 2020
ricki:


thankx boss.....
Welcome bro, we are all bosses together
Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 5:55pm On Jul 12, 2020
mexxy1:


=N=3.3m from foundation to decking completion? This is very impressive.

I know someone building a four bedroom duplex right now with same description as this, except he doesn't have an ante room but, has spent almost =N=5m according to him though, his building is longer.

Nice job.
This is a sizable building.
All the cost of construction of the suspended floor (decking) is 3.3M
This does not include monies spent from foundation through DPC, Lintel to Deck-level block work.
Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 11:46am On Jul 12, 2020
ricki:


Waitng bro.......
So far, a total of 3.3M was spent on the construction of this deck
Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 11:16am On Jul 12, 2020
With yesterday’s concrete placement, the deck work is complete and we will proceed to the next milestone Monday.

Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 10:04pm On Jul 05, 2020
Form work and rebar works complete,
Electricians and plumbers doing their thing
We are almost set to place concrete on our deck

Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 9:58pm On Jul 05, 2020
ricki:
Can u tell how much this decking cost??
Sure.
We are still on it.
When we complete this deck, we will provide you with how much was spent on manpower and materials every step of the way.
Thanks for your interest
Do stay tuned

1 Like

Properties / Re: Developing A Four Bedroom Duplex In The Outskirts Of Owerri by malkomx(m): 8:01pm On Jul 01, 2020
Rebar works

(1) (2) (3) (4) (5) (of 5 pages)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 29
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.