Mandy003's Posts
Nairaland Forum › Mandy003's Profile › Mandy003's Posts
1 2 (of 2 pages)
Druman:@ Druman Thanks for your inputs, I have now included the drawing (PDF) as attached. The columns and beam have been constructed and the next stage is to deck the area. Can you simplify what 1/2 ton of Y12 will be in peices (how many lenght makes 1/2" ton) |
I need Engineers/BQS in the house to help me with the quantity of the following materials that will be required to construct a decking slab for an area of approximitely 12.5M x 5.8M. Only the quantity of the materials; 1. Bag of cement 2. Sand 3. Granite 4. Rod - Y16 5. Rod - Y12 6. Rod - Y8 7. Wood - 1 X 12 8. Wood - 2 X 3 9. Ply wood - 4ft X 8ft NOTE: Attached is the design plan of the structure that will be built on the slab area
|
somez:How much is the cost per square meter for these laminated floor |
ncolumella:I need you send infomation on this biz and quotation for urgent set-up to my email: cossmart@gmail.com |
stigmond:@ Stigmond, thanks for your advice, however, the problem is not where you may be thinking, it's the wall with the beam running across and not the wall with bricks alone. It's the beamed wall with pillar that disengaged from the the bricks. |
I urgently need engineers in the house to come to my rescue on how best to stop the wall of this structure from falling due to the sloppy nature of the land. This situation happened after the foundation was filled with laterite and there was a heavy down pour. This morning we went to site and saw the wall like this; disengaged and almost falling off. Please advice on how best to remedy this situation. Thank you in advance.
|
snakebeat:@ Snakebeat The dining connects to the living room and ventilation from ante-room is also reaching it. All the bedrooms are cross-ventilated as well. |
There is a project to construct a 3-room bungalow with a 1-room penthouse in PH. I need builders/engineers in the house to provide the following information regarding this project; 1. The number of blocks that will be required to actualize this structure. 2. The duration required to build this house to completion. 3. The amount required to build this house to finishings. 4. Suggestions and ideas on how modifications can be done to the design as attached. NOTE: The plan is attached and 3D pic of what this plan will be like upon completion will be appriciated. |
@ LondonCool Welldone on your project. I just started a similar project in Calabar too, mine is close to the Ex-service Men Housing Estate just before the Tinapa junction. Though am using red bricks in this project. The land is steeper and sloopier than yours and my innitial plan was a 3 room bungalow for a start then leave space for duplex in future. My site engineer has suggested we re-design to a bungalow-penthouse as the house is too low compared to other building around. We are on the verge of introducing a penthouse of a master bed room and a study/office to be on a decking floor. we are redesigning the plan for now and will welcome suggestions and advice on how to go about this. |
What capacity can the hall take. How many seats can it occupy. Is the place in a residential area or industrial area? |
austin2023:Please send ur quotation for various sizes to my e-mail cossmart2005@yahoo.com. We have an urgent need for these tents. |
1 2 (of 2 pages)