Properties › Re: Construction Dairy Of A Five (5) Bedroom Duplex & Security house, Ibadan by MRFIXER001(op): 6:37pm On May 16, 2025 |
It is truly delightful to be here once more. We experienced a minor delay due to estate obligations that escalated the cost implications beyond the client's budget.
Owing to the estate's proximity to the Asejire Dam, we were instructed to elevate the foundation to 2.25 meters, which we are presently undertaking. A total of 10 courses |
Properties › Re: Construction Dairy Of A Five (5) Bedroom Duplex & Security house, Ibadan by MRFIXER001(op): 6:51pm On Mar 22, 2025 |
We are done with the foundation block setting today, commence the foundation column form work immediately. The total foundation height is 1.675m. 1m in the soil, 0.675m above the ground level.
We will do the column casting tomorrow.
|
Properties › Re: Construction Dairy Of A Five (5) Bedroom Duplex & Security house, Ibadan by MRFIXER001(op): 6:42pm On Mar 18, 2025 |
As stated we used 100mm as the pad footing for the foundation. And we maintain 1:2:4 mixing ratio for our concrete work.
We stated the foundation block laying yesterday and we are moving gradually.
|
Properties › Re: Construction Dairy Of A Five (5) Bedroom Duplex & Security house, Ibadan by MRFIXER001(op): 4:32am On Mar 13, 2025 |
We have commence the installation of foundation column reinforcement
|
Properties › Re: Construction Dairy Of A Five (5) Bedroom Duplex & Security house, Ibadan by MRFIXER001(op): 4:31am On Mar 13, 2025 |
We will be glad to. Learner247: Good job MrFixer001
Keep it up. You may just come to do something similar for us on the Island soon. |
Properties › Re: Construction Dairy Of A Five (5) Bedroom Duplex & Security house, Ibadan by MRFIXER001(op): 11:25am On Mar 11, 2025 |
Good morning
|
Properties › Re: Construction Dairy Of A Five (5) Bedroom Duplex & Security house, Ibadan by MRFIXER001(op): 10:49pm On Mar 10, 2025 |
Still on trench digging + the night view of the site
|
Properties › Re: Construction Dairy Of A Five (5) Bedroom Duplex & Security house, Ibadan by MRFIXER001(op): 12:40am On Mar 09, 2025 |
Still on foundation digging and bar bending
|
Properties › Re: Construction Dairy Of A Five (5) Bedroom Duplex & Security house, Ibadan by MRFIXER001(op): 3:23pm On Mar 08, 2025 |
As per Mr. Fixer's standard practice, we install a solar-powered CCTV system on-site. This is because 90% of our clients are in the diaspora, allowing them to see, hear, and stay updated on all project developments from anywhere in the world.
Total cost incur #250k
|
Properties › Re: Construction Dairy Of A Five (5) Bedroom Duplex & Security house, Ibadan by MRFIXER001(op): 11:09pm On Mar 07, 2025*. Modified: 8:44pm On May 27, 2025 |
We did the setting out today and supplied materials like: Dangote 3x Cement 100 bags @#9500 = #950000 Sand 30 tons @#9000 =#270000 Granite 30 tons @#15500 =#465000 Imported TNT rod at #1 065 000 per ton 10mm diameter bar in foundation column stirrup 0.18ton #191700 12mm diameter bar in foundation pad footing 0.52ton #553800 16mm diameter main bar in foundation column 0.38ton #404700 Bar bending workmanship #90000
Binding wire #35000
Wood for setting out #85000
#250000 for the temporary store Transportation cost of #45000
Trench digging #187800 A total of #3 528 000 was used today
|
Properties › Re: Construction Dairy Of A Five (5) Bedroom Duplex & Security house, Ibadan by MRFIXER001(op): 10:43pm On Mar 06, 2025 |
The project final goal
|
Properties › Re: Construction Dairy Of A Five (5) Bedroom Duplex & Security house, Ibadan by MRFIXER001(op): 10:41pm On Mar 06, 2025 |
It's a sandy land and the foundation depth designed by the estate engineer was 1.4m, but considering the slope of the land and the heavy flow of drainage facing the land, we will raise it above that.
According to the BOQ prepared and agreed on the substructure (which consist of foundation, filling and DPC) #14.2m |
Properties › Construction Dairy Of A Five (5) Bedroom Duplex & Security house, Ibadan by MRFIXER001(op): 9:25pm On Mar 06, 2025*. Modified: 12:38am On Mar 09, 2025 |
We're thrilled to kick off the construction of a stunning 5-bedroom duplex in Ibadan!
Project Details:
Contractor: Mr. Fixer Engineering and Construction Limited (over 10 years of experience, with completed projects in 20+ states) Location: Ibadan
Duration: Completed in stages (first stage: foundation, 2 weeks)
Stay tuned for regular updates on this project!
Want to learn more or collaborate with us? Reach out on +2347046517600 or mrfixerengineeringconstruction@gmail.com |
Properties › Re: Do You Need A Land In Simawa (redemption Camp)? by MRFIXER001(op): 1:40am On Dec 08, 2024 |
Happy Sunday 😁 |
Properties › Re: Do You Need A Bill Of Quantity (BOQ) For Your Building Project? by MRFIXER001(op): 1:40am On Dec 08, 2024 |
Happy Sunday |
Properties › Re: Do You Need A Bill Of Quantity (BOQ) For Your Building Project? by MRFIXER001(op): 11:24pm On Dec 03, 2024 |
07046517600 |
Properties › Re: Get A Standard BOQ Within 24- 48hrs At An Affordable Price by MRFIXER001(op): 10:56pm On Nov 28, 2024 |
07046517600 |
Properties › Re: DO YOU NEED A CONSTRUCTION COMPANY TO HANDLE YOUR BUILDING PROJECT? by MRFIXER001(op): 10:56pm On Nov 28, 2024 |
07046517600 |
Properties › Re: DO YOU NEED A CONSTRUCTION COMPANY TO HANDLE YOUR BUILDING PROJECT? by MRFIXER001(op): 10:08pm On Nov 24, 2024 |
We wish you the best |
Properties › Re: Do You Need A Land In Simawa (redemption Camp)? by MRFIXER001(op): 10:08pm On Nov 24, 2024 |
Happy Sunday |
Properties › Re: Get A Standard BOQ Within 24- 48hrs At An Affordable Price by MRFIXER001(op): 10:08pm On Nov 24, 2024 |
Happy Sunday |
Properties › Re: Get A Standard BOQ Within 24- 48hrs At An Affordable Price by MRFIXER001(op): 12:07am On Nov 20, 2024 |
Very reliable |
Properties › Re: Do You Need A Land In Simawa (redemption Camp)? by MRFIXER001(op): 12:07am On Nov 20, 2024 |
Still available |
Properties › Re: DO YOU NEED A CONSTRUCTION COMPANY TO HANDLE YOUR BUILDING PROJECT? by MRFIXER001(op): 12:06am On Nov 20, 2024 |
Always reliable |
Properties › Re: 1700m²of Land Beside FCMB Bank Challenge, Ring Road Ibadan For Sale by MRFIXER001(op): 12:06am On Nov 20, 2024 |
Still available |
Properties › Re: Do You Need A Bill Of Quantity (BOQ) For Your Building Project? by MRFIXER001(op): 8:50pm On Nov 19, 2024 |
Good evening |
Properties › 1700m²of Land Beside FCMB Bank Challenge, Ring Road Ibadan For Sale by MRFIXER001(op): 2:27pm On Nov 14, 2024 |
Ready To Sell Now
Direct instruction
Commercial land facing Ring road 1700 square meter of land , just a building beside FCMB bank at Challenge road Ring road, Ibadan for sale Title: Conveyance
Asking price: 198m
Video available and ready for inspection
07046517600 mrfixerengineeringconstruction@gmail.com |
Properties › Re: DO YOU NEED A CONSTRUCTION COMPANY TO HANDLE YOUR BUILDING PROJECT? by MRFIXER001(op): 5:48am On Nov 12, 2024 |
Always available |
Properties › Re: Do You Need A Bill Of Quantity (BOQ) For Your Building Project? by MRFIXER001(op): 5:47am On Nov 12, 2024 |
Available |
Properties › Re: Do You Need A Land In Simawa (redemption Camp)? by MRFIXER001(op): 5:47am On Nov 12, 2024 |
The land is still available |
Properties › Re: Pop Design / Screeding At Better Price by MRFIXER001: 5:46am On Nov 12, 2024 |
Good morning |
Properties › Re: Wall SCREEDING Question Needs Answers Please. by MRFIXER001: 5:45am On Nov 12, 2024 |
In a situation like this I will suggest you screed the wall in other to get a smooth surface before applying satin paint Yampotatocarrot: Please, is it possible to change the paint on a wall from texcoat to satin? The paint used before is those paint that is grainy, as is sand was mixed with it, now I want to use a satin paint...
Is it possible to remove that previous grainy stuff on the wall? If yes, how will it be done? |