₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,329,524 members, 8,441,067 topics. Date: Tuesday, 07 July 2026 at 11:54 PM

Toggle theme

Muyesky's Posts

Nairaland ForumMuyesky's ProfileMuyesky's Posts

1 2 3 4 5 6 7 8 ... 84 85 86 87 88 89 90 91 92 (of 92 pages)

PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 12:51pm On Apr 23, 2013
Muyesky: Duly noted, will make enquiries and get back to u soonest. It will be my joy to be of service to u. Thanks for the confidence
4x4 :10,500 x 23 = 241,500
2x2 :5,500 x 15 = 82,500
3x3 :7,000 x 2 = 14,000
4x2 :6,000 x5 = 30,000
5x4 :12,000 x 2 = 24,000
TOTAL = N392,000

Strictly TOWER nd nothing else.
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 11:15am On Apr 23, 2013
sucessful1: Muyesky,
Am really impressed by ur prices,am sure u r a good negotiator,pls can u help me in sourcing out prices for these items,if u can get better prices,maybe u can buy them for me for a fee,but all product must be what it says on the tin though.sliding windows tower wit net,supply and fitted in Lagos Ikotun area.if u can pls.
4x4=23
2x2=15
3x3=2
4x2=5
5x4=2

Cheers
w
Duly noted, will make enquiries and get back to u soonest. It will be my joy to be of service to u. Thanks for the confidence
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 9:41am On Apr 23, 2013
remcoface: Hello there,can you please fill out the cable prices for us?


(1)1.5mm red.
(2)1.5mm black.
(3)1.5mm green.
(4)2.5mm red.
(5)2.5mm black.
(6 )4.mm red.
(7)4.mm black.
(8 )6.mm red.
(9)6.mm black
(10)16.mm red.
(11)16.mm black.
(12)Antenna wire.
(13)35mm armoured cable
(14)25mm armoured cable

Thanks as you do.
1.5mm. - N4400
2.5mm. - N7000
4mm. - N9700
6mm. - N14000
16mm. - N37000
35mm armoured cable. - N4850
25mm armoured cable. - N4100.

Pls, feel free to contact me for any further assistance
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 9:08am On Apr 23, 2013
Chekitaut: Call 08055558500
I really don't know if I should say dis but is it proper, this Chekitaut guy crashing into my thread with all dis advert? Just saying...... Cos its always easy starting a new thread for advert so y crash into others?........Just wondering.
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 7:22am On Apr 23, 2013
mufutau55: OK. Got it. Not bad price for Sliding either.. I think I want a TOWER Casement.. about double the price of Sliding in all sizes.
Does the windows all comes with the installed frame charge together in your mentioned price?
I think I may just go with the "Chekitaut" guy, unless I find a better price and quality. Thanks.

Hajji Mufutau
Yes it does. I also do consulting services, so if u require my help for any thing pertaining building and construction, I can definitely give u a better price nd a better quality......08035757416 or muyiwaolakunde@rocketmail.com. Do contact me if u require my services at any level.
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 12:16am On Apr 23, 2013
mufutau55: Muyesky, can you please post the pictures of the windows.
And also is this Imported and TOWAL?
And Casement or Sliding windows?
Please I am looking to do windows for my project now and that price is reasonable if it is Casement window.
Thank you.

Mufutau
I only av the window frame installed. I specifically asked the installer to hold on a while so I'll fix the window immediately after painting. Its tower nd its sliding nd not casement. A typical casement wld generally cost more.
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 8:27pm On Apr 22, 2013
sucessful1: Hello my broda,
Nice thread,pls bros where did u buy yr Aluminium windows and is it imported or tower?
Pls, ignore the price i quoted for the aluminium window, that was an error, I actually paid 10k each for them (4x4)
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 8:25pm On Apr 22, 2013
mufutau55: Thank you. Please don't forget to give us costs for materials and labor.
I am about to start this on my project too.. Thanks.

Hajji Mufutau
Duly noted sir wink
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 4:43pm On Apr 22, 2013
mufutau55: Please keep us posted.. Thanks.

Mufutau
smiley
Only the best is good enough, that is why i have decided to go for Nigerchin. though expensive but the quality is in it

AutosRe: 1 by Muyesky(m): 9:54pm On Apr 21, 2013
Pls can u help me get a very neat a/c 4WD mitsubishi L300? Hw much will I get it and pls let me see d pix if u can get any. I need dis as soon as possible. My email is muyiwaolakunde@rocketmail.com
AutosRe: For Your Cotonou Cars/suvs/buses Visit Us @ Polaris Autos Today!!! by Muyesky(m): 3:10pm On Apr 21, 2013
pls how much can i get a very neat 4WD, a/c mitsubishi L300 from cotonu? pls send reply to muyiwaolakunde@rocketmail.com as soon as possible
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 2:59pm On Apr 21, 2013
preparing for tiling and wiring smiley
AutosRe: CLEAR YOUR CAR,SUV,VAN,BUS,TRUCK,TIPPER FROM COTONOU PORT @ AN AFFORDABLE PRICE by Muyesky(m): 9:29am On Apr 21, 2013
Pls, hw much can I get a very neat with a/c 4WD mitsubishi L300 to my house. I need ur reply urgently nd if possible, pictures. muyiwaolakunde@rocketmail.com
AutosNissan Vanette Bus Needed by Muyesky(op): 11:03pm On Apr 20, 2013
FULL A/C AND VERY NEAT PETROL NISSAN VANETTE NEEDED URGENTLY, PLS, CONTACT muyiwaolakunde@rocketmail.com OR 08035757416.

AutosMitsubishi L400 (4wd) Needed Urgently by Muyesky(op): 10:27pm On Apr 20, 2013
I WILL REALLY APPRECIATE IT IF ANYONE CAN GET ME THIS 4WD AND EXTRA CLEAN L400 LIKE THE ONE IN THIS PIX. URGENCY IS HIGHLY REQUIRED AND I NEED IT TO BE EXACTLY LIKE THIS OR EVEN NEATER. muyiwaolakunde@rocketmail.com IS MY EMAIL OR CALL 08035757416.

AutosRe: Buy Your Cheap Clean Tokunbo Cars With Low Millage From Cotonou by Muyesky(m): 5:25pm On Apr 20, 2013
please, i need a very clean mitsubishi L400 with a/c. send details to muyiwaolakunde@rocketmail.com
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 11:15pm On Apr 14, 2013
jerryben12: Muyesky, thank you for this thread. Please kindly provide the labor cost for doing the whole plastering work (inside and outside). Also, what was the cost of labor you paid to the guy that did the designs around the windows and the stripe boundaries on the stone tiles? Will the guys that did the plastering be interested in working in Owode Onirin before Ikorodu? I will provide them with accomodation and three square meals daily. I am not forgetting beer, gin and wine smiley.

Additionally;
1. How much did you pay for the installation of the PVC (labor cost)?
2. How much was each door frame?

Thank you!
Thanks a lot, i actually paid 40k for the installation of the PVC and 14k for each complete door with frame. The boys can work anywhere in Nigeria as long as the price is okay. All you need to let me know how soon you intend to start. The wine ofcourse ia an added incentive which they can never ignore grin
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 9:51pm On Apr 10, 2013
[quote author=Area-Fada]Mr Muyesky, no abandon your thread o! Abi you done go holiday for Miami after hard work on this house? grin

We still need your inspiration.

I have got a quotation of 4k for the same tiles you bought for 2k300. But mine is in South-South. I need about 60sqm of fascial tiles, so it will be much. I am considering sending someone to Lagos to buy both the fascial, wall and floor tiles. Maybe even PVC (if I don't use POP)at the same time when I am ready. The price difference is too big.

The floor & wall tiles you are using/going to use, how much per square metre?

Thanks.[/quote]Well, tanx a lot brother. i didnt abandon my thread o! av just been busy of late with work jare. Abi, i have to work to get more money to complete the building naa! grin. Well, as per your request, please do give me a call then we can discuss further on what form of help i can render, 08035757416 is my number.
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 12:47pm On Mar 28, 2013
tunde57: Once again thanks for your wonderful enlightenment, I have since copied your burglary proof but my welder is insisting that the material used and produced for N4,500.00 is 3/4 inch square pipe and not 1 inch pipe. He is claiming that the cost of the burglary proof made with 1 inch square pipe could only be produced at N5,000.00.
Please kindly confirm the size of the square pipe so that I will know that he is not trying to rip me off.
Best Regards
1 inch pipe was used for me, that I can tell u authoritatively but if he insists on 5k and u trust his hand work then give it to him. The essence of this forum is to give a price range and also guide against unnecessary rip off but you can always expect a slight or unnoticed price variation.....at the end of the day, we all require very quality work that is reasonably priced............all the best.
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 9:30am On Mar 24, 2013
payless: I have been saying this for so long that we over build in Nigeria with most of these pillars and German floors that are so common in even bungalows. We tend to waste money unnecessarily.
That is the essence of this forum, to enlighten and make us realize that simplicity is key. Fresh air even encourages it, so you really have a point my brother. I have saved a lot thus far............thanks
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 9:23am On Mar 24, 2013
[quote author=Area-Fada].

I certainly have lots of things to spend money on......it's good to seek advice from many sources. I have already saved quite a bit of money by taking my time to make enquiries so far.

I think we overbuild houses in Naija. From elaborate pillars that serve no real function to all kind of tacky additions.
That's what I like about the simple but functional design of your house.[/quote]Thanks a lot.........inspiration is everything. I gathered lots of them from this forum it enabled me fashioned out a design that will not cut deep into my pocket. I have many friends that paid heavily for very complex designs without considering the cost effect and as at today, I have gone way past them evn though they've spent more than I have just cos of flashy pointless designs. I simply learned to cut my coat according to my material.
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 2:05pm On Mar 23, 2013
[quote author=Area-Fada]@muyesky,

My builder is recommending metal doors throughout the house. This should start after Easter God willing. But is there any real advantage of metal doors inside the house? The internal doors should be about 16 or so, not sure until I have a look at the plan again.[/quote]Why would you need metal doors throughout the house? Never heard of or seen that........unless you are actually trying to build a vault or a strong room. Believe me, it has no advantage at all..........once again, never heard of it but you could be the first but please find other reasonable avenues to channel your hard earned cash........just a piece of advise.
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 12:23pm On Mar 23, 2013
euromilion: Windows 5k?.
Pls where did u buy ur windows?
My bad!!!!!! I actually meant 8.5k.......so sorry about the confusion for each window with net.
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 9:29am On Mar 23, 2013
tunde57: Thanks alot for sharing your experience and progress of your buitiful house. I am also constructing a two flats of one three & one two bedrooms at Abeokuta and I have just got to the roofing stage which I am yet to embark upon. However, I plan to use Asbestos Roofing Sheets due to some constraints and go for the Amoula PVC Ceiling Strips.
Could you please confirm if you sourced the PVC Ceiling Installer yourself or was he recommended by Amoula. And secondly, could you please let me know how much you paid for the 4ft Entrance Door and how much a complete Aluminium window is costing for one standard room window, also what type of doors are you intending to use internally and what is the cost per one complete door with frame.
Thanking you for your anticipated response, and please pardon me if I have asked so many questions at one time as I dont reside in Naija and I am thinking of comming home in June to choose and decide what internal fixtures that would be used and do whatever I can before returning to my base in the UK. Futhermore, could please link me with the PVC installer if he is willing to go and work in Abeokuta.
Kind Regards
Pvc guy was recommended by amoula and yes, he travels to even as far as the north to install so Abeokuta is a stone throw. The front entrance door cost 45k, a complete wondow aluminium with net(4ft x 4ft)will be 5k then u multiply by the numbers of windows you have. Internally, I have 10 doors nd the frame already installed for them is mahogany wood so that's what I will be using to complete them, each door at the rate of 12k, but there are cheaper ones depending on your taste and quality. When ever you are ready, the PVC guy will be on standby. Thanks
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 6:36pm On Mar 22, 2013
Schynam: Congrats. But what are some of the things you listed in your receipts?


Schnapps?
Ojagba?
Family?
In doing the proper estimate of a building, certain things aree always overlooked but when you sum them together, they tend to matter a lot financially.
Schnapps: I actually bought some for the land owners for prayers while working.

Ojagba: aka wood binder, that's what is used to bind the roofing wood to the building itself for tightness and firmness. Every house carries it.

Family: some unaccounted for money spent or given to the land owners, u really cannot escape things like this once in a while. Its all for the greater good.

I hope this answers your questions?
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 6:29pm On Mar 22, 2013
mufutau55: Thanks Muyesky. I know they will use planks all that too.. I just wasn't sure if they also use iron. My duplex has already past the foundation level,
they have laid few coaches of blocks past the foudation.. but they never did the German floor, I was told it could be done later. The german floor for
the Boy's Quarter was done and since I was not in Nigeria everything was done in my absence, so I never really get to see how some things are
done, that is why I am learning from here. One of the disadvantage of being in diaspora. I will see if I can get the photo of the level of
the duplex and post it here.. I am taking my time in doing this building as fund is not that available, too many projects.. Thank you.

Mufutau

The photos is posted below.. the Duplex is the inmcoplete one and the BQ iis the completed one at the back and will be roofed in two weeks.
I will be coming home to complete the Duplex to Lintel level soon, then comes the big money of Decking... (this is the only best picture I have)
Well done bro, the important thing is that u got it started and that will definitely put your mind towards its completion. Its a journey of many miles but just like you, I have taken the first step. Once again, congrats and hope to see the completion soon.............very soon.
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 9:36am On Mar 22, 2013
payoski: Pls my brother I have been tying to post my floor plant for every one to see, so how did u post yours by scanning or how?
You have to scan it first and the size of ur scan will definitely be very large so, you have to reduce the size and make sure it does not exceed 200kb, then u can paste.
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 9:30am On Mar 22, 2013
mufutau55: @Muyesky
What materials are needed for German Floor? Is iron needed at all.. or it's just sand and cement? Please explain in details.
Thanks.

Hajji Mufutau
Yes, iron is definitely needed. It serves to hold the foundation together. Infact, a lot is needed. You also need planks too but then I can't really tell u how much cos I don't even know what your plan looks like.
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 11:33pm On Mar 18, 2013
mufutau55: Thank you Muyesky, you have been of great help. For some of us buidling houses from abroad, the estimates
are very valuable to guard from scam or ripoffs. Thanks a lot.

Mufutau
I am really so happy and proud to have followers like you guys. All I really need right now is prayers.......there is still more work to be done: tiling, fencing, electrical fittings, painting etc. With God by my side, I hope to achieve these in no time, so u cld all come eat rice with me during the house warming.
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 11:24pm On Mar 18, 2013
euromilion: Thnx bro,
I tried googling Allahu for d roofing,but they seemed not to have website,.I wanted to call them first b/4 sending someone there because am not in 9ja to do it myself.,

Thnx again.
08023045351, 08082615955.
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 6:16pm On Mar 18, 2013
mufutau55: How many strips of the PVC was required for the whole house or per room of how many feet?
Thanks.

Mufutau
The house is 40ft x 40ft and I used a total of 110 strips of the PVC. Thanks
PropertiesRe: Building My 3 Bedroom Bungalow (the Apocalypse) by Muyesky(op): 6:15pm On Mar 18, 2013
mufutau55: Thanks. How much did you pay for this 2x2ft window guards?

Mufutau
N2000

1 2 3 4 5 6 7 8 ... 84 85 86 87 88 89 90 91 92 (of 92 pages)