Osterly's Posts
Nairaland Forum › Osterly's Profile › Osterly's Posts
1 (of 1 pages)
Quantity Description Rate Amount Compacting Machine (Rental and Labour) Cost of Nylon Casting of blinding: Sharp Sand (White) 25 Bags of Cement 25 Bags of water Proof Cement Labour,Spreading Nylon,Casting (50mn thick) Labour from work Tornado nail German floor: Reinforcement 2 ½ tones of 12mn d rod 1/4 tones of 16mn d rod 1 Coil Binding wire 4 rolls of B.R.C Labour Casting: 230 bags of cement 60 tones of granite 80 tones of sharp sand (Berger) Labour for casting |
How much is 20 tonne of filling sand to beechwood estate, Lekki ? |
How much is the house ? |
[color=#006600]Sprumbaba: Apart from estate fees., there are estate rules that you must abide with. No twin duplex, no BQ for 450sqm , low fence. I think 500,000 naira for electricity connection fee, and so on. Notwithstanding. I have been considering Beechwood and This estate in Arepo. Will surely buy one. @Sprumbaba- Estate rules and regulations are set to foster the neighborhood harmony & tranquility that you admired in Beechwood Estate. Sure you wouldn't mind living in such a neighborhood. May I also broaden your view that the connection fees is a compound charge for many things detailed below. Pls review and revise your thoughts. Connection Fees (Serviced Plots Only) For the connection of water and electricity from the house to the nearest main point. The fee includes labor and materials and may be adjusted based on the actual measurements on the site. Materials will include the pressured pipes, aluminum conductors, electric meter, and N500,000 (Five Hundred and Thousand Naira) |
ojbboy (m) ESTATE SURVEYOR & VALUER, LAGOS,NIGERIA Posts: 262 Offline Re: To Let-4 Bedroom Flat (2toilet/2bath) in IKOTUN AREA,LAGOS- N200k X 1 Year « #21 on: September 07, 2011, 08:40 AM » -------------------------------------------------------------------------------- Mr Topanalyst, kindly mind your own business @OJBboy, your utterance demonstrate that you part of the roth of our society if you can condone the 2 yr RENT ILLEGALITY being perpetuated your partner in crime (OPISCOPY). May the arm of the law catch up with u and roth in jail as u make life difficult for ordinary people like us. |
Try (www.desopas.com) behind abi-dap hotel and ask for Engr. Sewo Sopade who manufactures these equipment range. |
Does anyone know of the recruitment line for ASSET MANAGEMENT COMPANY ( a CBN proposed authority ) |
Does anyone know of the recruitment line for ASSET MANAGEMENT COMPANY (a CBN proposed authority) |
I want to set up a bakery in Nigeria, can I ask where to buy the equipment locally ? |
What is the Salary rate for levels 13-16 in Lagos State Civil service, Alausa |
Beechwood Estate, Lekki: I bought a 450 sqm on this estate since 2006 and completion was shifted several times. Do u have some updates on the development |
@Tolu10, Many thanks 4 d info. I bought into that estate scheme since 2006 and was told that the road network and other promised infrastructure were been done up and because I live abroad I am keen to monitor the progress of development on the site i.e have people begun to build on allocated plots ?, |
I look forward 2 seeing those pix u r abt 2 upload. Meanwhile, could u estimate d cost to build a 2 bed guest chalet on a 620sqm in Lekki ( an abode for immediate occupation ) |
Quantity Description Rate Amount Compacting Machine (Rental and Labour) Cost of Nylon Casting of blinding Sharp Sand (White) 25 Bags of Cement 25 Bags of water Proof Cement Labour,Spreading Nylon,Casting (50mn thick) Labour from work Tornado nail German floor Reinforcement 2 ½ tones of 12mn d rod 1/4 tones of 16mn d rod 1 Coil Binding wire 4 rolls of B.R.C Labour Casting 230 bags of cement 60 tones of granite 80 tones of sharp sand (Berger) Labour for casting |
1 (of 1 pages)