₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,325,121 members, 8,420,472 topics. Date: Thursday, 04 June 2026 at 08:57 PM

Toggle theme

Pmxpo's Posts

Nairaland ForumPmxpo's ProfilePmxpo's Posts

1 2 3 4 (of 4 pages)

PropertiesRe: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 11:03pm On Apr 11, 2016
Professionals are free to contact me with 08068449031. All ur suggestions really save me the heck.
PropertiesRe: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 3:36pm On Apr 11, 2016
mirrael6:
Quotation is OK. But I suggest you change that bedroom beside the dining to be the Kitchen. And the present kitchen to a bedroom. Good luck
1.) The second room was converted to a kitchen
2.) The corridor was added to the master bedroom
3.) Another exit door was created in the new kitchen.
4.) The BQ was converted to a study/gym
PropertiesRe: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 3:22pm On Apr 11, 2016
Thanks y'all. Your suggestions have bn of much help.
PropertiesRe: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 11:16am On Apr 11, 2016
rasco2000me:
br base on my experience,u donot need up to 110 bags of cements for the floos and plaster, u need only 75 _80 bags,his labour should not be more than#180,00for both plaster and floors, u pipe should not be more than 55_ 60,000ur soakaaw can not take more than 60 bags of cement, all these estimates is even high incsae u can not monitor them for more s explanation,call 08037879281 I can not come to u ,but incase u hv issues call
Thanks a lot
PropertiesRe: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 9:57am On Apr 11, 2016
100Cents:
1. Does the N180,000 for electrical pipe work cover the wiring and accessories ? ie cables, sockets, ceiling roses. If not, it is high.

2. Does plumbing and pipe work include your toilet seater, sinks and wash hand basins ? If No, then N110,000 is high for ordinary plastic pipes.

3. Does the protectors include metal doors for external entrances or just burglary proof for windows ? How many protectors and iron doors are involved. If not N250,000 is high.

4. Window casement. How many aluminium windows are involved. N450,000 is high if you dont have up to 30 windows.

9. How many bathrooms and kitchens you have will determine the number of chambers you need. Once you provided blocks, cement, sand and stone dust, constructing one chamber should not cost more than N5,000. Your bungalow should not have more than 4 chambers unless all the rooms are en-suite with toilet facilities then in that case, you have 5 chambers.

The list should be detailed otherwise he will give you another list soon.

Your number 8 is funny. Labour for plastering N350,000. Dont pay more than N150,000 plastering that house.

Btw, no other Engr has responded to your thread.
I agree with you tho nobody has posted a counter quotation which I actually need.
PropertiesRe: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 7:24am On Apr 11, 2016
AdelokikiMr:
Brov please can I get a copy of your plan and I like to know the total cost that got it to that level Thank you .
A copy of the plan was attached with the post. Spent abt 5m to this stage.
PropertiesRe: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 7:20am On Apr 11, 2016
mekybabe1:
Pls how much did it cost you to do the roofing? That price for cement sha. Cement should be cheaper than that nah.
About 1.3m
PropertiesRe: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 7:18am On Apr 11, 2016
mastasam:
Na to pack to ur new house b4 all d NXT stage
Abi o?
PropertiesRe: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 7:17am On Apr 11, 2016
M4gunners:
Op what was the cost of your roofing?
Woodwork = 550k
Roofing sheets @450sqm = 715k

Price covers transportation, labour n supervision.
PropertiesRe: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 7:14am On Apr 11, 2016
ROCKJ1:
I did not see supervision fee in your engineers estimate for that stage. How will he get paid? This system may encourage him to dip his hand in the materials money to settle himself.
That's the worrisome part. I believe his supervision cost is embedded in the estimate on code.
PropertiesRe: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 7:11am On Apr 11, 2016
hemucology:
Call for the latest P.O.P


And latest cement work

See my signature for more
Send in ur designs and quotation.
PropertiesRe: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 7:04am On Apr 11, 2016
oseiwe:
Chairman, abeg na who design ur house? why is dere no rear exit? hw can a 4 bedroom flat hv just one entrance?
First of all, look for a way to put an exit door at d end of dat lobby and at d kitchen, before u come back for more advise. Due regards.
Thanks for your observation, the said modification has been made.
eghosajohnny:
Here's a quote to guide prroper
Electrical can be reduced to 130,000
Plumbing:90,000
Protector:180,000
Casement with tower material:420,000
Plastering sand7load 49,000
A load of stone dust:50,000
80 bags of cement:132,000
Labour:250,000
External pipe work:40,000
Chamber:80,000
All this are perfect and of good material if u need any advice just call
007031886484
Thanks.
PropertiesRe: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 7:11pm On Apr 10, 2016
agarawu23:
Start with electrical and plumbing so that you won't be breaking and patching walls to fix things after plastering .
princejones:
Start with electrical and plumbing pipings
Yes but is the quotation fare enof?
PropertiesRe: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 4:33pm On Apr 10, 2016
ricki:
i can only count 3 bedrooms ...... although i could be wrong cause i have beans and bread waiting for me. So recount
The BQ makes it four...
PropertiesRe: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 4:07pm On Apr 10, 2016
But the prices, are they realistic? I want a breakdown to completion please.
PropertiesRe: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 4:07pm On Apr 10, 2016
But the prices, are they realistic?
PropertiesRe: What Is The Estimated Cost Of Building A 3 Bedroom Flat In Lugbe? Please Help by pmxpo(op): 3:57pm On Apr 10, 2016
I just concluded the roofing stage of the 4 bedroom bungalow in Lugbe. The site engineer has given me the bill below as the next phase. Please can you advise accordingly?

Analysis of the estimate work.
(1) electrical pipe work @ # 180,000
(2) plumbing internal pipe work @ # 110,000.
(3) protectors @ #250,000.
(4) window casement @ #450,000.
(5) ten (10) load of plastering sand @ #70,000.
(6) one (1) load of stonedust @ #50,000.
(7). One hundred and ten (110) bags of cement @ #1,650, = #181,500.
(cool labour # 350,000.
(9) all the chambers @ #100,000.
(10) external pipe to the sockerway and outside water pipe @ #68,000.

Grand total = 1,809,500.00

PropertiesAfter Roofing A House, What's The Next Thing To Do? by pmxpo(op): 3:48pm On Apr 10, 2016
I just concluded the roofing stage of a 4 bedroom bungalow in Lugbe. The site engineer has given me the bill below as the next phase. Please can you advise accordingly?

Analysis of the estimate work.
(1) electrical pipe work @ # 180,000
(2) plumbing internal pipe work @ # 110,000.
(3) protectors @ #250,000.
(4) window casement @ #450,000.
(5) ten (10) load of plastering sand @ #70,000.
(6) one (1) load of stonedust @ #50,000.
(7). One hundred and ten (110) bags of cement @ #1,650, = #181,500.
(cool labour # 350,000.
(9) all the chambers @ #100,000.
(10) external pipe to the sockerway and outside water pipe @ #68,000.

Grand total = 1,809,500.00

EducationRe: Which Institution Has The Highest Number Of Runz Babes? by pmxpo(m): 4:59pm On Mar 28, 2016
Nowadays, most girls hustle till they are ready to settle dwn. I won't judge anyone.
SportsRe: Pre Olympic Friendly Nigeria Dream Team Vs Brazil Mar.24 11pm by pmxpo(m): 12:14am On Mar 25, 2016
Link has stopped working. Any update please?
RomanceRe: See The Difference Between Dating A Boy And Dating A Man by pmxpo(m): 7:28am On Mar 02, 2016
What about the difference btw dating a girl n a woman? smh!
Nairaland GeneralRe: Fire Outbreak Opposite Nnpc Towers by pmxpo(op): 9:23pm On Feb 26, 2016
Zenith Bank building (with other offices) along Herbert Macaulay Way, Abuja, Nigeria. Besides Total, Oando and opposite NNPC Towers.
Nairaland GeneralFire Outbreak Opposite Nnpc Towers by pmxpo(op): 3:12pm On Feb 26, 2016
Fire!!!

FamilyA Baby Baths With Butter In Yenagoa by pmxpo(op): 9:13pm On Feb 21, 2016
What do you have to say about this?

Dating And Meet-up ZoneRe: Nairalanders In Uyo by pmxpo(m): 9:34am On Feb 01, 2016
Where can someone find olosho?
PropertiesRe: What Is The Estimated Cost Of Building A 3 Bedroom Flat In Lugbe? Please Help by pmxpo(op): 1:19pm On Jan 31, 2016
mujeebmuhsin:
I completed my building not so long ago (different state though) and I can tell you that most of the quotations above are reasonable. If he will be honest, I expect a very solid house with a modest finishing. It can still be built for less thougb, but never compromise the integrity of the building. One mistake I made was to give a nonprofessional with no experience handled my building. Hope you won't make that mistake. Good luck.
Would you like to share ur B.O.Q?
PropertiesRe: What Is The Estimated Cost Of Building A 3 Bedroom Flat In Lugbe? Please Help by pmxpo(op): 1:17pm On Jan 31, 2016
How so?

saniby:
Reasonable or not, your project costing is mostly influenced by the quality of materials and workmanship to be used. Your given qoute doesn't define details of the serious cost elements which may lead u into conflict over what you expect and what is delivered.
For example window type - casement or regular sliding. Tile and fixtures, door type etc. Even the carcass is not well defined.

We can build your house for u if u wish and get u significant savings based on our two work models.
1. You buy ur materials and pay us agreed labour cost at each stage.
2. We give u completed quote based on ur chosen materials and finish.
This is e work we are currently doing at Mararaba, Abuja for a client.
PoliticsRe: Supreme Court Upholds Wike’s Election As Rivers Governor by pmxpo(m): 6:57pm On Jan 27, 2016
PropertiesRe: What Is The Estimated Cost Of Building A 3 Bedroom Flat In Lugbe? Please Help by pmxpo(op): 1:41am On Jan 26, 2016
Do u knw anyone?
PropertiesWhat Is The Estimated Cost Of Building A 3 Bedroom Flat In Lugbe? Please Help by pmxpo(op): 12:15am On Jan 26, 2016
I have been given an estimate of about 8m to build a 3 bedroom flat in Lugbe as follows:

ITEM DESCRIPTION QTY RATE AMOUNT
A ESTIMATE FOR THE FOUNDATION PROJECT
1 Loads of sand 5 23,000.00 115,000.00
2 Loads os chippings 1 60,000.00 60,000.00
3 Blocks 1300 140.00 182,000.00
4 Bags of cement 60 1,700.00 102,000.00
5 Water supply 1 30,000.00 30,000.00
6 Binding and laying of blocks 1 130,000.00 130,000.00
7 Block hoarse cost 1 15,000.00 15,000.00

SUBTOTAL 634,000.00
B ESTIMATE FOR THE DPC
1 Loads of Ratrat 14 15,000.00 210,000.00
2 Loads os hardcore 10 8,500.00 85,000.00
3 Loads os chippings 2 60,000.00 120,000.00
4 Loads of sand 3 23,000.00 69,000.00
5 Bags of cement 60 1,700.00 102,000.00
6 Water supply 1 20,000.00 20,000.00
7 Plumber work cost 1 20,000.00 20,000.00
8 Leather for water proof 1 10,000.00 10,000.00
9 Planks 21 1,000.00 21,000.00
10 Casting of DPC 1 95,000.00 95,000.00
11 Carpenter 1 10,000.00 10,000.00

SUBTOTAL 762,000.00

C ESTIMATE FOR THE BLOCK WORK TO THE PARAPET LEVEL
1 Blocks 3000 140.00 420,000.00
2 Loads of sand 8 23,000.00 184,000.00
3 Bags of cement 110 1,500.00 165,000.00
4 Water supply 2 20,000.00 40,000.00
5 Planks (2 x 3) 30 300.00 9,000.00
6 Planks (1 x 12) 100 1,000.00 100,000.00
7 Carpenter 1 30,000.00 30,000.00
8 Bag of Nails 1 6,000.00 6,000.00
9 12mm rod 30 1,200.00 36,000.00
10 8mm rod 10 1,000.00 10,000.00
11 Rope still cost 1 20,000.00 20,000.00
12 Meason 1 320,000.00 320,000.00
13 Front pillars cost 1 100,000.00 100,000.00
14 Parapet cost 1 450,000.00 450,000.00
15 Iron bender 1 25,000.00 25,000.00
16 Rolling of wire cost 1 10,000.00 10,000.00
17 Loads of chipping 1 60,000.00 60,000.00

SUBTOTAL 1,985,000.00


TOTAL 3,381,000.00
D ROOF AND ROOF COVERING 1,250,000.00

E WINDOWS AND DOORS 449,000.00

F PLUMBING AND MECHANICAL 473,200.00

G ELECTRICAL INSTALLATION 315,000.00

H FLOOR FINISHES 814,800.00

I CEILING FINISHES 169,600.00

J BURGLARY AND FIXTURES 150,000.00

K WALL RENDERING & PAINTING 739,920.00

4,361,520.00

TOTAL 7,742,520.00

Please, what's ur advice.

Science/TechnologySpectranet Redefines Port Harcourt Lifestyle With Affordable High-speed Internet by pmxpo(op): 1:02pm On Jan 20, 2016
Port Harcourt 17th January 2015: Residents of Port Harcourt, the capital of Nigeria’s treasure Base, Rivers State, can now browse the internet at the fastest speed available, as Nigeria’s foremost Internet Service Provider, Spectranet, launched and activated the 4G Long-Term Evolution (4G LTE), a service that promises to redefine the life style of residents and business owners in the state.