Properties › Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 11:03pm On Apr 11, 2016 |
Professionals are free to contact me with 08068449031. All ur suggestions really save me the heck. |
Properties › Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 3:36pm On Apr 11, 2016 |
mirrael6: Quotation is OK. But I suggest you change that bedroom beside the dining to be the Kitchen. And the present kitchen to a bedroom. Good luck 1.) The second room was converted to a kitchen 2.) The corridor was added to the master bedroom 3.) Another exit door was created in the new kitchen. 4.) The BQ was converted to a study/gym |
Properties › Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 3:22pm On Apr 11, 2016 |
Thanks y'all. Your suggestions have bn of much help. |
Properties › Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 11:16am On Apr 11, 2016 |
rasco2000me: br base on my experience,u donot need up to 110 bags of cements for the floos and plaster, u need only 75 _80 bags,his labour should not be more than#180,00for both plaster and floors, u pipe should not be more than 55_ 60,000ur soakaaw can not take more than 60 bags of cement, all these estimates is even high incsae u can not monitor them for more s explanation,call 08037879281 I can not come to u ,but incase u hv issues call Thanks a lot |
Properties › Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 9:57am On Apr 11, 2016 |
100Cents: 1. Does the N180,000 for electrical pipe work cover the wiring and accessories ? ie cables, sockets, ceiling roses. If not, it is high.
2. Does plumbing and pipe work include your toilet seater, sinks and wash hand basins ? If No, then N110,000 is high for ordinary plastic pipes.
3. Does the protectors include metal doors for external entrances or just burglary proof for windows ? How many protectors and iron doors are involved. If not N250,000 is high.
4. Window casement. How many aluminium windows are involved. N450,000 is high if you dont have up to 30 windows.
9. How many bathrooms and kitchens you have will determine the number of chambers you need. Once you provided blocks, cement, sand and stone dust, constructing one chamber should not cost more than N5,000. Your bungalow should not have more than 4 chambers unless all the rooms are en-suite with toilet facilities then in that case, you have 5 chambers.
The list should be detailed otherwise he will give you another list soon.
Your number 8 is funny. Labour for plastering N350,000. Dont pay more than N150,000 plastering that house.
Btw, no other Engr has responded to your thread. I agree with you tho nobody has posted a counter quotation which I actually need. |
Properties › Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 7:24am On Apr 11, 2016 |
AdelokikiMr: Brov please can I get a copy of your plan and I like to know the total cost that got it to that level Thank you . A copy of the plan was attached with the post. Spent abt 5m to this stage. |
Properties › Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 7:20am On Apr 11, 2016 |
mekybabe1: Pls how much did it cost you to do the roofing? That price for cement sha. Cement should be cheaper than that nah. About 1.3m |
Properties › Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 7:18am On Apr 11, 2016 |
mastasam: Na to pack to ur new house b4 all d NXT stage Abi o? |
Properties › Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 7:17am On Apr 11, 2016 |
M4gunners: Op what was the cost of your roofing? Woodwork = 550k Roofing sheets @450sqm = 715k Price covers transportation, labour n supervision. |
Properties › Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 7:14am On Apr 11, 2016 |
ROCKJ1: I did not see supervision fee in your engineers estimate for that stage. How will he get paid? This system may encourage him to dip his hand in the materials money to settle himself. That's the worrisome part. I believe his supervision cost is embedded in the estimate on code. |
Properties › Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 7:11am On Apr 11, 2016 |
hemucology: Call for the latest P.O.P
And latest cement work
See my signature for more Send in ur designs and quotation. |
Properties › Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 7:04am On Apr 11, 2016 |
oseiwe: Chairman, abeg na who design ur house? why is dere no rear exit? hw can a 4 bedroom flat hv just one entrance? First of all, look for a way to put an exit door at d end of dat lobby and at d kitchen, before u come back for more advise. Due regards. Thanks for your observation, the said modification has been made. eghosajohnny: Here's a quote to guide prroper Electrical can be reduced to 130,000 Plumbing:90,000 Protector:180,000 Casement with tower material:420,000 Plastering sand7load 49,000 A load of stone dust:50,000 80 bags of cement:132,000 Labour:250,000 External pipe work:40,000 Chamber:80,000 All this are perfect and of good material if u need any advice just call 007031886484 Thanks. |
Properties › Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 7:11pm On Apr 10, 2016 |
agarawu23: Start with electrical and plumbing so that you won't be breaking and patching walls to fix things after plastering . princejones: Start with electrical and plumbing pipings Yes but is the quotation fare enof? |
Properties › Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 4:33pm On Apr 10, 2016 |
ricki: i can only count 3 bedrooms ...... although i could be wrong cause i have beans and bread waiting for me. So recount The BQ makes it four... |
Properties › Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 4:07pm On Apr 10, 2016 |
But the prices, are they realistic? I want a breakdown to completion please. |
Properties › Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 4:07pm On Apr 10, 2016 |
But the prices, are they realistic? |
Properties › Re: What Is The Estimated Cost Of Building A 3 Bedroom Flat In Lugbe? Please Help by pmxpo(op): 3:57pm On Apr 10, 2016 |
I just concluded the roofing stage of the 4 bedroom bungalow in Lugbe. The site engineer has given me the bill below as the next phase. Please can you advise accordingly?
Analysis of the estimate work. (1) electrical pipe work @ # 180,000 (2) plumbing internal pipe work @ # 110,000. (3) protectors @ #250,000. (4) window casement @ #450,000. (5) ten (10) load of plastering sand @ #70,000. (6) one (1) load of stonedust @ #50,000. (7). One hundred and ten (110) bags of cement @ #1,650, = #181,500. (cool labour # 350,000. (9) all the chambers @ #100,000. (10) external pipe to the sockerway and outside water pipe @ #68,000.
Grand total = 1,809,500.00
|
Properties › After Roofing A House, What's The Next Thing To Do? by pmxpo(op): 3:48pm On Apr 10, 2016 |
I just concluded the roofing stage of a 4 bedroom bungalow in Lugbe. The site engineer has given me the bill below as the next phase. Please can you advise accordingly? Analysis of the estimate work. (1) electrical pipe work @ # 180,000 (2) plumbing internal pipe work @ # 110,000. (3) protectors @ #250,000. (4) window casement @ #450,000. (5) ten (10) load of plastering sand @ #70,000. (6) one (1) load of stonedust @ #50,000. (7). One hundred and ten (110) bags of cement @ #1,650, = #181,500. (  labour # 350,000. (9) all the chambers @ #100,000. (10) external pipe to the sockerway and outside water pipe @ #68,000. Grand total = 1,809,500.00
|
Education › Re: Which Institution Has The Highest Number Of Runz Babes? by pmxpo(m): 4:59pm On Mar 28, 2016 |
Nowadays, most girls hustle till they are ready to settle dwn. I won't judge anyone. |
|
Sports › Re: Pre Olympic Friendly Nigeria Dream Team Vs Brazil Mar.24 11pm by pmxpo(m): 12:14am On Mar 25, 2016 |
Link has stopped working. Any update please? |
Romance › Re: See The Difference Between Dating A Boy And Dating A Man by pmxpo(m): 7:28am On Mar 02, 2016 |
What about the difference btw dating a girl n a woman? smh! |
Nairaland General › Re: Fire Outbreak Opposite Nnpc Towers by pmxpo(op): 9:23pm On Feb 26, 2016 |
Zenith Bank building (with other offices) along Herbert Macaulay Way, Abuja, Nigeria. Besides Total, Oando and opposite NNPC Towers. |
Nairaland General › Fire Outbreak Opposite Nnpc Towers by pmxpo(op): 3:12pm On Feb 26, 2016 |
Fire!!!
|
Family › A Baby Baths With Butter In Yenagoa by pmxpo(op): 9:13pm On Feb 21, 2016 |
What do you have to say about this?
|
Dating And Meet-up Zone › Re: Nairalanders In Uyo by pmxpo(m): 9:34am On Feb 01, 2016 |
Where can someone find olosho? |
Properties › Re: What Is The Estimated Cost Of Building A 3 Bedroom Flat In Lugbe? Please Help by pmxpo(op): 1:19pm On Jan 31, 2016 |
mujeebmuhsin: I completed my building not so long ago (different state though) and I can tell you that most of the quotations above are reasonable. If he will be honest, I expect a very solid house with a modest finishing. It can still be built for less thougb, but never compromise the integrity of the building. One mistake I made was to give a nonprofessional with no experience handled my building. Hope you won't make that mistake. Good luck. Would you like to share ur B.O.Q? |
Properties › Re: What Is The Estimated Cost Of Building A 3 Bedroom Flat In Lugbe? Please Help by pmxpo(op): 1:17pm On Jan 31, 2016 |
How so? saniby: Reasonable or not, your project costing is mostly influenced by the quality of materials and workmanship to be used. Your given qoute doesn't define details of the serious cost elements which may lead u into conflict over what you expect and what is delivered. For example window type - casement or regular sliding. Tile and fixtures, door type etc. Even the carcass is not well defined.
We can build your house for u if u wish and get u significant savings based on our two work models. 1. You buy ur materials and pay us agreed labour cost at each stage. 2. We give u completed quote based on ur chosen materials and finish. This is e work we are currently doing at Mararaba, Abuja for a client. |
Politics › Re: Supreme Court Upholds Wike’s Election As Rivers Governor by pmxpo(m): 6:57pm On Jan 27, 2016 |
|
Properties › Re: What Is The Estimated Cost Of Building A 3 Bedroom Flat In Lugbe? Please Help by pmxpo(op): 1:41am On Jan 26, 2016 |
Do u knw anyone? |
Properties › What Is The Estimated Cost Of Building A 3 Bedroom Flat In Lugbe? Please Help by pmxpo(op): 12:15am On Jan 26, 2016 |
I have been given an estimate of about 8m to build a 3 bedroom flat in Lugbe as follows:
ITEM DESCRIPTION QTY RATE AMOUNT A ESTIMATE FOR THE FOUNDATION PROJECT 1 Loads of sand 5 23,000.00 115,000.00 2 Loads os chippings 1 60,000.00 60,000.00 3 Blocks 1300 140.00 182,000.00 4 Bags of cement 60 1,700.00 102,000.00 5 Water supply 1 30,000.00 30,000.00 6 Binding and laying of blocks 1 130,000.00 130,000.00 7 Block hoarse cost 1 15,000.00 15,000.00 SUBTOTAL 634,000.00 B ESTIMATE FOR THE DPC 1 Loads of Ratrat 14 15,000.00 210,000.00 2 Loads os hardcore 10 8,500.00 85,000.00 3 Loads os chippings 2 60,000.00 120,000.00 4 Loads of sand 3 23,000.00 69,000.00 5 Bags of cement 60 1,700.00 102,000.00 6 Water supply 1 20,000.00 20,000.00 7 Plumber work cost 1 20,000.00 20,000.00 8 Leather for water proof 1 10,000.00 10,000.00 9 Planks 21 1,000.00 21,000.00 10 Casting of DPC 1 95,000.00 95,000.00 11 Carpenter 1 10,000.00 10,000.00 SUBTOTAL 762,000.00 C ESTIMATE FOR THE BLOCK WORK TO THE PARAPET LEVEL 1 Blocks 3000 140.00 420,000.00 2 Loads of sand 8 23,000.00 184,000.00 3 Bags of cement 110 1,500.00 165,000.00 4 Water supply 2 20,000.00 40,000.00 5 Planks (2 x 3) 30 300.00 9,000.00 6 Planks (1 x 12) 100 1,000.00 100,000.00 7 Carpenter 1 30,000.00 30,000.00 8 Bag of Nails 1 6,000.00 6,000.00 9 12mm rod 30 1,200.00 36,000.00 10 8mm rod 10 1,000.00 10,000.00 11 Rope still cost 1 20,000.00 20,000.00 12 Meason 1 320,000.00 320,000.00 13 Front pillars cost 1 100,000.00 100,000.00 14 Parapet cost 1 450,000.00 450,000.00 15 Iron bender 1 25,000.00 25,000.00 16 Rolling of wire cost 1 10,000.00 10,000.00 17 Loads of chipping 1 60,000.00 60,000.00 SUBTOTAL 1,985,000.00 TOTAL 3,381,000.00 D ROOF AND ROOF COVERING 1,250,000.00 E WINDOWS AND DOORS 449,000.00 F PLUMBING AND MECHANICAL 473,200.00 G ELECTRICAL INSTALLATION 315,000.00 H FLOOR FINISHES 814,800.00 I CEILING FINISHES 169,600.00 J BURGLARY AND FIXTURES 150,000.00 K WALL RENDERING & PAINTING 739,920.00 4,361,520.00 TOTAL 7,742,520.00
Please, what's ur advice.
|
Science/Technology › Spectranet Redefines Port Harcourt Lifestyle With Affordable High-speed Internet by pmxpo(op): 1:02pm On Jan 20, 2016 |
Port Harcourt 17th January 2015: Residents of Port Harcourt, the capital of Nigeria’s treasure Base, Rivers State, can now browse the internet at the fastest speed available, as Nigeria’s foremost Internet Service Provider, Spectranet, launched and activated the 4G Long-Term Evolution (4G LTE), a service that promises to redefine the life style of residents and business owners in the state.
|