Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,152,813 members, 7,817,359 topics. Date: Saturday, 04 May 2024 at 10:53 AM

After Roofing A House, What's The Next Thing To Do? - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / After Roofing A House, What's The Next Thing To Do? (51449 Views)

Roofing sheets: Prices of all types of Aluminium Roofing sheets in Nigeria / Roofing A 3 Bedroom Bungalow(aluminium) In Abeokuta, Ogun State / Cost Of Roofing A 4 Bedroom Bungalow (2) (3) (4)

(1) (2) (3) (4) (5) (Reply) (Go Down)

After Roofing A House, What's The Next Thing To Do? by pmxpo(m): 3:48pm On Apr 10, 2016
I just concluded the roofing stage of a 4 bedroom bungalow in Lugbe. The site engineer has given me the bill below as the next phase. Please can you advise accordingly?

Analysis of the estimate work.
(1) electrical pipe work @ # 180,000
(2) plumbing internal pipe work @ # 110,000.
(3) protectors @ #250,000.
(4) window casement @ #450,000.
(5) ten (10) load of plastering sand @ #70,000.
(6) one (1) load of stonedust @ #50,000.
(7). One hundred and ten (110) bags of cement @ #1,650, = #181,500.
(cool labour # 350,000.
(9) all the chambers @ #100,000.
(10) external pipe to the sockerway and outside water pipe @ #68,000.

Grand total = 1,809,500.00

7 Likes 5 Shares

Re: After Roofing A House, What's The Next Thing To Do? by Abudu2000(m): 4:02pm On Apr 10, 2016
depends on which you wanna embark on first, many start the electrical and plumbing ,some might wanna fix the windows/ door frames first.

4 Likes

Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(m): 4:07pm On Apr 10, 2016
But the prices, are they realistic?

1 Like

Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(m): 4:07pm On Apr 10, 2016
But the prices, are they realistic? I want a breakdown to completion please.
Re: After Roofing A House, What's The Next Thing To Do? by Abudu2000(m): 4:14pm On Apr 10, 2016
pmxpo:
But the prices, are they realistic? I want a breakdown to completion please.
well I hope there engineers to help you with that here but I don't critisize people's estimate.

2 Likes

Re: After Roofing A House, What's The Next Thing To Do? by ricki: 4:30pm On Apr 10, 2016
i can only count 3 bedrooms ...... although i could be wrong cause i have beans and bread waiting for me. So recount

8 Likes 1 Share

Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(m): 4:33pm On Apr 10, 2016
ricki:
i can only count 3 bedrooms ...... although i could be wrong cause i have beans and bread waiting for me. So recount

The BQ makes it four...
Re: After Roofing A House, What's The Next Thing To Do? by ricki: 4:34pm On Apr 10, 2016
kai see guyman
Re: After Roofing A House, What's The Next Thing To Do? by princejones(m): 5:43pm On Apr 10, 2016
Start with electrical and plumbing pipings

2 Likes

Re: After Roofing A House, What's The Next Thing To Do? by agarawu23(m): 6:48pm On Apr 10, 2016
Start with electrical and plumbing so that you won't be breaking and patching walls to fix things after plastering .

12 Likes 1 Share

Re: After Roofing A House, What's The Next Thing To Do? by pmxpo(m): 7:11pm On Apr 10, 2016
agarawu23:
Start with electrical and plumbing so that you won't be breaking and patching walls to fix things after plastering .

princejones:
Start with electrical and plumbing pipings

Yes but is the quotation fare enof?
Re: After Roofing A House, What's The Next Thing To Do? by phonesNgadgets: 7:13pm On Apr 10, 2016
The cost quote for some of the materials and work is relatively close the a project I'm overseeing here. It's a 4 bedroom and a study room flat.

You can start with Window, electrification and plumbing simultaneously.
All the best.

1 Like 1 Share

Re: After Roofing A House, What's The Next Thing To Do? by metrecube(m): 10:43pm On Apr 10, 2016
pmxpo:




Yes but is the quotation fare enof?
The quote is fair but it seem electrical pipe work, protector and window are on high side. Confirm from him the type of material hes using for your windows. Pipe work of 180k is really on a high side.

1 Like

Re: After Roofing A House, What's The Next Thing To Do? by hemucology(m): 5:27am On Apr 11, 2016
Call for the latest P.O.P


And latest cement work

See my signature for more

1 Like

Re: After Roofing A House, What's The Next Thing To Do? by wilcox(m): 5:30am On Apr 11, 2016
The prices are far better so long as the quality of work is guaranteed, but do ask for some discount.

1 Like 1 Share

Re: After Roofing A House, What's The Next Thing To Do? by drtwist(m): 5:31am On Apr 11, 2016
The price are not on the low side, but it all depends on the quality and concept needed to put in place. Sorry you didn't state how you settle him, if His contractor fee is based on lump sum.
Re: After Roofing A House, What's The Next Thing To Do? by trux(m): 5:32am On Apr 11, 2016
pmxpo:
I just concluded the roofing stage of a 4 bedroom bungalow in Lugbe. The site engineer has given me the bill below as the next phase. Please can you advise accordingly?

Analysis of the estimate work.
(1) electrical pipe work @ # 180,000
(2) plumbing internal pipe work @ # 110,000.
(3) protectors @ #250,000.
(4) window casement @ #450,000.
(5) ten (10) load of plastering sand @ #70,000.
(6) one (1) load of stonedust @ #50,000.
(7). One hundred and ten (110) bags of cement @ #1,650, = #181,500.
(cool labour # 350,000.
(9) all the chambers @ #100,000.
(10) external pipe to the sockerway and outside water pipe @ #68,000.

Grand total = 1,809,500.00
bro what type of roofing sheet u used and how much per sheet sqm see the bill given to me by my engr
[8:52 AM, 4/10/2016] Yakson: This is the quotation for stucco. (aluminum colour).
Total sqm for the roofing sheet is 410.8m @ 1362=559,309.6 clouding sheet 110m @1623=178530
40m of bottom ceiling @1623 =64920
Flash beam and nails 20000, transportation 25000, installation 40000. Total 887,959.6
[8:53 AM, 4/10/2016] Yakson: With the same measurement for coloured, the sum total is 995,148.4: THANKS

1 Like 1 Share

Re: After Roofing A House, What's The Next Thing To Do? by lonelydora: 5:33am On Apr 11, 2016
Congratulations. You are almost done. If tiu are confused on what to do next, just throw a coin.

1 Like 1 Share

Re: After Roofing A House, What's The Next Thing To Do? by lonelydora: 5:34am On Apr 11, 2016
Congratulations. You are almost done. If you are confused on what to do next, just throw a coin.

1 Like

Re: After Roofing A House, What's The Next Thing To Do? by KayB: 5:35am On Apr 11, 2016
Taste, quality and location always determine the quotation.
Re: After Roofing A House, What's The Next Thing To Do? by TenPassfour(m): 5:42am On Apr 11, 2016
Good project, after roofing its adviceable to start M and E. That is the electrical work,plumbing,doing all the fitting before plastering.
The Engineer will guide you.
#TeamThinkForMe
Re: After Roofing A House, What's The Next Thing To Do? by drtwist(m): 5:44am On Apr 11, 2016
trux:

bro what type of roofing sheet u used and how much per sheet sqm see the bill given to me by my engr
[8:52 AM, 4/10/2016] Yakson: This is the quotation for stucco. (aluminum colour).
Total sqm for the roofing sheet is 410.8m @ 1362=559,309.6 clouding sheet 110m @1623=178530
40m of bottom ceiling @1623 =64920
Flash beam and nails 20000, transportation 25000, installation 40000. Total 887,959.6
[8:53 AM, 4/10/2016] Yakson: With the same measurement for coloured, the sum total is 995,148.4
[5:54 PM, 4/10/2016] +234 703 588 2523: THANKS
not you didn't state the superficial/ linear quantity of the job so it will be difficult for him to compare.
Re: After Roofing A House, What's The Next Thing To Do? by moslanry(m): 5:46am On Apr 11, 2016
Am technician I can do electrical. Work For you. And u will like It,here's my contact 08027289418 ola by name
Re: After Roofing A House, What's The Next Thing To Do? by maputohq: 5:47am On Apr 11, 2016
no vex o. you can pack-in.

3 Likes

Re: After Roofing A House, What's The Next Thing To Do? by jordyspices: 5:48am On Apr 11, 2016
Nice one
Re: After Roofing A House, What's The Next Thing To Do? by mekybabe1: 5:52am On Apr 11, 2016
Pls how much did it cost you to do the roofing? That price for cement sha. Cement should be cheaper than that nah.
Re: After Roofing A House, What's The Next Thing To Do? by IdJack(m): 5:57am On Apr 11, 2016
Congrats so far....Just start with Electrical Pipe work and Plumbing, you can as well as him for discount.

Congrats once more

1 Like 1 Share

Re: After Roofing A House, What's The Next Thing To Do? by Henrick007: 5:58am On Apr 11, 2016
pmxpo:
I just concluded the roofing stage of a 4 bedroom bungalow in Lugbe. The site engineer has given me the bill below as the next phase. Please can you advise accordingly?

Analysis of the estimate work.
(1) electrical pipe work @ # 180,000
(2) plumbing internal pipe work @ # 110,000.
(3) protectors @ #250,000.
(4) window casement @ #450,000.
(5) ten (10) load of plastering sand @ #70,000.
(6) one (1) load of stonedust @ #50,000.
(7). One hundred and ten (110) bags of cement @ #1,650, = #181,500.
(cool labour # 350,000.
(9) all the chambers @ #100,000.
(10) external pipe to the sockerway and outside water pipe @ #68,000.

Grand total = 1,809,500.00
do aluminium sub frame first, electrical and plumbing, then you plaster.... The aluminium window can be fixed last even after pop screding, that's if you use sub frame .... I fabricate aluminium window and door, just anything aluminium. Here is my contact 08025125667
Re: After Roofing A House, What's The Next Thing To Do? by KINGwax007(m): 5:59am On Apr 11, 2016
I dnt knw wot next o. But maybe- bring it down and reconstruct again- if u like!

angry angry

2 Likes

Re: After Roofing A House, What's The Next Thing To Do? by eghosajohnny: 6:07am On Apr 11, 2016
pmxpo:
I just concluded the roofing stage of a 4 bedroom bungalow in Lugbe. The site engineer has given me the bill below as the next phase. Please can you advise accordingly?

Analysis of the estimate work.
(1) electrical pipe work @ # 180,000
(2) plumbing internal pipe work @ # 110,000.
(3) protectors @ #250,000.
(4) window casement @ #450,000.
(5) ten (10) load of plastering sand @ #70,000.
(6) one (1) load of stonedust @ #50,000.
(7). One hundred and ten (110) bags of cement @ #1,650, = #181,500.
(cool labour # 350,000.
(9) all the chambers @ #100,000.
(10) external pipe to the sockerway and outside water pipe @ #68,000.

Grand total = 1,809,500.00

Here's a quote to guide prroper

Electrical can be reduced to 130,000
Plumbing:90,000
Protector:180,000
Casement with tower material:420,000
Plastering sand7load 49,000
A load of stone dust:50,000
80 bags of cement:132,000
Labour:250,000
External pipe work:40,000
Chamber:80,000

All this are perfect and of good material if u need any advice just call

007031886484

1 Like

Re: After Roofing A House, What's The Next Thing To Do? by Henrick007: 6:10am On Apr 11, 2016
eghosajohnny:


Here's a quote to guide prroper

Electrical can be reduced to 130,000
Plumbing:90,000
Protector:180,000
Casement with tower material:420,000
Plastering sand7load 49,000
A load of stone dust:50,000
80 bags of cement:132,000
Labour:250,000
External pipe work:40,000
Chamber:80,000

All this are perfect and of good material if u need any advice just call

007031886484
giving price when you don't know the number and sizes of Windows on the building

15 Likes

Re: After Roofing A House, What's The Next Thing To Do? by AdelokikiMr(m): 6:11am On Apr 11, 2016
pmxpo:
I just concluded the roofing stage of a 4 bedroom bungalow in Lugbe. The site engineer has given me the bill below as the next phase. Please can you advise accordingly?

Analysis of the estimate work.
(1) electrical pipe work @ # 180,000
(2) plumbing internal pipe work @ # 110,000.
(3) protectors @ #250,000.
(4) window casement @ #450,000.
(5) ten (10) load of plastering sand @ #70,000.
(6) one (1) load of stonedust @ #50,000.
(7). One hundred and ten (110) bags of cement @ #1,650, = #181,500.
(cool labour # 350,000.
(9) all the chambers @ #100,000.
(10) external pipe to the sockerway and outside water pipe @ #68,000.

Grand total = 1,809,500.00


Brov please can I get a copy of your plan and I like to know the total cost that got it to that level Thank you .

(1) (2) (3) (4) (5) (Reply)

Mosquito Village: Inside Lagos Slum Where Land Is Allocated At N2000 / ABC Orjiakor Buys Eko Atlantic Afren Tower / Architectural design (interior, Exterior, Plans And Construction) 08096365063

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 38
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.