The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" - Properties (2) - Nairaland

Nairaland ForumNairaland GeneralPropertiesThe Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" (29977 Views)

1 2 3 4 5 6 7 8 9 10 ... 16 Reply (Go Down)

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by michlins(m): 9:26am On Mar 11, 2021
16inchdick:
what side is that and how much
price is 6ml. Location is Asaba
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by 16inchdick: 9:30am On Mar 11, 2021
michlins:
price is 6ml. Location is Asaba
I know what area in Asaba
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by michlins(m): 10:50am On Mar 11, 2021
16inchdick:
I know what area in Asaba
off anwai road. Very close to the government house
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 5:47am On Mar 12, 2021
Our iron fitting team is getting the column bars ready for use..........

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 5:50am On Mar 12, 2021
Stocking up on other materials like cement and blocks............

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by val15: 7:18am On Mar 12, 2021
Following
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by Chibaba247(m): 5:29pm On Mar 12, 2021
spyder880:
Buying trips of sand..........
how much is a tipper load of sand in asaba?
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op):
Chibaba247:
how much is a tipper load of sand in asaba?
They sold to me for N19,000 with "vested interest" cheesy This is one of those times when you act like you dont know the real price.
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op):
Foundation blinding with concrete.........

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 9:52am On Mar 14, 2021
Standing our columns in the foundation......

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by fuludu: 2:23am On Mar 15, 2021
Let's do best to supply you with blocks for this project. We are block making company in Asaba

08185580170
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 5:05am On Mar 15, 2021
fuludu:
Let's do best to supply you with blocks for this project. We are block making company in Asaba

08185580170
We have already bought and started using a lot of blocks, where is your blocks making site located?
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by Homextras: 7:01am On Mar 15, 2021
n3xt:
N18million will give you the carcass of that building in Sangotedo area. (Foundation to Roofing)

It’ll also conveniently fit a 500sqm land.

Here’s something almost similar done around the area on 50 x 100 land.
And if it’s just four flats, rough estimate?

______

Thanks for the mention @spyder880

Well done and keep up the good job sir!
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by Homextras: 7:02am On Mar 15, 2021
n3xt:
N18million will give you the carcass of that building in Sangotedo area. (Foundation to Roofing)

It’ll also conveniently fit a 500sqm land.

Here’s something almost similar done around the area on 50 x 100 land.

______

Thanks for the mention @spyder880

Well done and keep up the good job sir!
And it’s just four flats? Rough estimate please?
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 6:27am On Mar 16, 2021
We've been very busy here, completing the foundation blinding and column concrete casting is ongoing, we have also stood most of the columns on their bases.

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 6:29am On Mar 16, 2021
We have also been laying blocks inside the foundation after the concrete blinding.........

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 6:33am On Mar 16, 2021
More pictures of ongoing work........

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 6:37am On Mar 16, 2021
More 9" blocks, sand and chippings arriving and being offloaded for our use here........

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by InvertedHammer: 12:45pm On Mar 16, 2021
spyder880:
Foundation blinding with concrete.........
/.
What is the minimum distance from a fence to a structure?


/
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 2:41pm On Mar 16, 2021
InvertedHammer:
/.
What is the minimum distance from a fence to a structure?


/
It depends on location Sir, in some places, they could allow up to 3 meters and in other places, much less than that.
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 8:51pm On Mar 18, 2021
Our water pumping mechanism here............

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 8:56pm On Mar 18, 2021
Foundation beams.........

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 9:03pm On Mar 18, 2021
More.......

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op):
Works on the foundation beams, sand filling, and preparations for the DPC cast is in progress............

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by n3xt(m): 4:07am On Mar 19, 2021
Homextras:
And it’s just four flats? Rough estimate please?
My sincere apologies. I’m just seeing this.

The build is 5 units of 2 bedroom flats with space for a BQ and ample space for parking on both sides of the building and the front.

8 cars can conveniently park within the compound.

Attached is the site plan with and without BQ also showing the number of car that can park within the compound.

The main building alone can fit into a 500sqm plot of land.
_____

A site survey will be required to determine how much will deliver this build in Sangotedo. If you have soil information (I mean soil test report), I can give you a ballpark figure for this project.

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by n3xt(m): 4:15am On Mar 19, 2021
spyder880:
Works on the foundation beams, sand filling, and preparations for the DPC cast is in progress............
Well done baba!

This foundation design is more thorough than raft foundations.
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 4:41am On Mar 19, 2021
n3xt:
Well done baba!

This foundation design is more thorough than raft foundations.
Thank you Sir.
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by Chriswazo(m): 5:19am On Mar 19, 2021
spyder880:
Thank you Sir.
Can you give a real quotation for this project in a place like ABA?
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 5:20am On Mar 19, 2021
Chriswazo:
Can you give a real quotation for this project in a place like ABA?
Have you prepared a building plan Sir?
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by Chriswazo(m): 6:16am On Mar 19, 2021
spyder880:
Have you prepared a building plan Sir?
Yes, send me your WhatsApp number.
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 7:27am On Mar 19, 2021
Chriswazo:
Yes, send me your WhatsApp number.
0803 335 0750

Thanks.
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 5:51pm On Mar 20, 2021
n3xt:
My sincere apologies. I’m just seeing this.

The build is 5 units of 2 bedroom flats with space for a BQ and ample space for parking on both sides of the building and the front.

8 cars can conveniently park within the compound.

Attached is the site plan with and without BQ also showing the number of car that can park within the compound.

The main building alone can fit into a 500sqm plot of land.
_____

A site survey will be required to determine how much will deliver this build in Sangotedo. If you have soil information (I mean soil test report), I can give you a ballpark figure for this project.
Very clear and concise explanation with images. Thank you bro.
1 2 3 4 5 6 7 8 9 10 ... 16 Reply

The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 BedroomsThe Making Of The "Emene Enugu Block Of 6 Flats Of 2 Bedrooms"New Construction Of A Block Of 6 Flats Of 2 Bedrooms In Enugu East.234

Nigerian Man Shares Shocking Experience At Hotel He Allegedly Booked Online (pixMan In Tears After Enugu Government Demolished His Store (Photos)Building On Swamp, How Do I Go, Raft Or Pile?