Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 5:13am On Apr 15, 2021
More pictures later today........
Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 8:00am On Apr 15, 2021
Then concrete cast of the ground beams...........

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 8:03am On Apr 15, 2021
More concrete cast.........

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 8:11am On Apr 15, 2021
More......

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 4:15am On Apr 16, 2021
Some of the completed foundation beams..........

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 4:25am On Apr 16, 2021
More pictures as work continues........

Re: The Making Of The "Akure 63 Units Shopping Plaza" by ultron12345: 3:52pm On Apr 16, 2021
spyder880:
Edited.

There will be 63 shops in this plaza
There will be 21 shops on each floor
There will be 3 floors, two storey building
There will be 2 different staircases in this plaza
There will be 12 toilets for use of the traders and their customers alike in the plaza
There will be a fence and gate
There will be a borehole
There will be an overhead tank
Very good work you're doing here Sir.
Please, what is the estimate budget for this project?
Re: The Making Of The "Akure 63 Units Shopping Plaza" by FromZeroToHero(m): 9:25am On Apr 17, 2021
spyder880:
we now plan to remove the front columns on the ground floor, and hang the upper passage as a cantilevered projection, freeing more space for use of the plaza
Good morning sir, I thought the front columns will start from the foundation to the last floor. pls how will you achieve it if you remove the ones in the ground floor. thanks
Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 11:21am On Apr 17, 2021
FromZeroToHero:
Good morning sir, I thought the front columns will start from the foundation to the last floor. pls how will you achieve it if you remove the ones in the ground floor. thanks
I will explain with a picture of where it was recently done later.
Re: The Making Of The "Akure 63 Units Shopping Plaza" by afemgbosey(m): 1:38pm On Apr 17, 2021
spyder880:
Foundation excavation works begins in earnest...........
Well done bro. I noticed the Foundations of this building is not as deep as the ones of your former buildings esp storey building. It's usually about 2 feet +. Any explanation for this?
Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 3:17pm On Apr 17, 2021
afemgbosey:
Well done bro. I noticed the Foundations of this building is not as deep as the ones of your former buildings esp storey building. It's usually about 2 feet +. Any explanation for this?
Foundation design due to results of the soil test and the preferred depth where we can get a good bearing capacity of the land.
Re: The Making Of The "Akure 63 Units Shopping Plaza" by FromZeroToHero(m): 3:31pm On Apr 17, 2021
spyder880:
I will explain with a picture of where it was recently done later.
ok. please endeavor to quote me. thanks
Re: The Making Of The "Akure 63 Units Shopping Plaza" by afemgbosey(m): 9:29pm On Apr 17, 2021
spyder880:
Foundation design due to results of the soil test and the preferred depth where we can get a good bearing capacity of the land.
OK. I tut the land being waterlogged will require a deeper foundation
Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 10:06pm On Apr 17, 2021
afemgbosey:
OK. I tut the land being waterlogged will require a deeper foundation
Not in every situation.
Re: The Making Of The "Akure 63 Units Shopping Plaza" by mufutau55(m):
Nice project Sir. Is there a new 3D and Floor plan of the new drawings? Thanks.

Hajji M.
Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 5:00am On Apr 19, 2021
mufutau55:
Nice project Sir. Is there a new 3D and Floor plan of the new drawings? Thanks.

Hajji M.
Not yet Sir, I have been asking the architect for a redesign but he didn't have the time since then. Good morning Sir.
Re: The Making Of The "Akure 63 Units Shopping Plaza" by mufutau55(m): 11:20pm On Apr 19, 2021
spyder880:
Not yet Sir, I have been asking the architect for a redesign but he didn't have the time since then. Good morning Sir.
Thanks.
Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 7:51am On Apr 20, 2021
Foundation sand filling is ongoing here...........

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 8:00am On Apr 20, 2021
More.......

Re: The Making Of The "Akure 63 Units Shopping Plaza" by morgist(m): 3:13pm On Apr 20, 2021
spyder880:
Foundation sand filling is ongoing here...........
Well don Sir! Nice project and clean job.

How do you deal with the pit that looks like well in one of the shops?

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 8:18pm On Apr 20, 2021
morgist:
Well don Sir! Nice project and clean job.

How do you deal with the pit that looks like well in one of the shops?
Bros, that's our water supply o cheesy

But we will fill it and dig a borehole later. The well was existing on the land before this project.
Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op):
FromZeroToHero:
Good morning sir, I thought the front columns will start from the foundation to the last floor. pls how will you achieve it if you remove the ones in the ground floor. thanks
spyder880:
I will explain with a picture of where it was recently done later.
FromZeroToHero:
ok. please endeavor to quote me. thanks
Something like this from another site, it's usually done to create more space on the ground level, a space for parking cars, stacking some goods temporarily or for ease of movement of traders and their customers.

Re: The Making Of The "Akure 63 Units Shopping Plaza" by FromZeroToHero(m): 11:15am On Apr 21, 2021
spyder880:
Something like this from another site, it's usually done to create more space on the ground level, a space for parking cars, stacking some goods temporarily or for ease of movement of traders and their customers.
ok. the front columns on the ground floor was embedded to the wall while the front columns for the first floor started from the slab. thanks alot
Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 1:06pm On Apr 21, 2021
Foundation filling is ongoing here in this site.........

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 6:19pm On Apr 24, 2021
We've been busy here, the shop walls are already going up.

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 6:22pm On Apr 24, 2021
More pictures as more shops are formed.........

Re: The Making Of The "Akure 63 Units Shopping Plaza" by Arijude(m): 11:57am On Apr 25, 2021
spyder880:
The people that will be making blocks for us sent me these samples for tests, but I will not be testing these, I will go to the block site to test the strength of the blocks there.
grin grin grin grin
Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 8:02am On Apr 27, 2021
Work is continuing in this site as we have brought in our reinforcement rods and started work on the lintels of the ground floor. More pictures later.
Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 10:06am On May 01, 2021
Work on the reinforcement rods of the ground floor lintels has been going on. We are also bringing in our aggregates and other needed materials.............

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 10:07am On May 01, 2021
More pictures from this project.........

Re: The Making Of The "Akure 63 Units Shopping Plaza" by spyder880(op): 11:06am On May 02, 2021
Bringing in more materials into this site. A load of well made blocks to be offloaded..........

Re: The Making Of The "Akure 63 Units Shopping Plaza" by michlins(m): 1:05pm On May 02, 2021
Doing this project,did you move your trusted hand s to site or you employed the from the local pool