Construction Process Of Four Bedroom Bungalow @ Mowe - Properties (3) - Nairaland
Nairaland Forum › Nairaland General › Properties › Construction Process Of Four Bedroom Bungalow @ Mowe (5828 Views)
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by Beframia: 6:08am On Jun 27, 2021 |
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by Nobody: 7:02am On Jun 27, 2021 |
Beframia: The pictures are all with me but time has been a challenge. I will post the roofing pictures today or tomorrow. |
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by Nobody: 8:19am On Jun 27, 2021 |
Installation of Roofing sheet.
|
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by Nobody: 8:31pm On Jul 02, 2021 |
... |
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by Nobody: 7:51am On Jul 06, 2021 |
segzy14: |
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by Nobody: 7:36am On Jul 08, 2021 |
- |
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by kkonsults: 2:51pm On Jul 09, 2021 |
Nice job sir. Well done |
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by Nobody: 2:31pm On Jul 11, 2021 |
kkonsults: Thank you bro. |
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by Nobody: 8:50pm On Jul 12, 2021 |
segzy14: |
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by Nobody: 8:23pm On Sep 05, 2021 |
‘’’ |
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by patiymar(m): 1:20pm On Sep 17, 2021 |
segzy14:Please what is the total square meters for this roof work? |
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by Nobody: 6:49pm On Sep 17, 2021 |
patiymar: About 475sqm. |
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by patiymar(m): 9:52pm On Sep 17, 2021 |
segzy14:Thank you. |
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by Nobody: 1:59pm On Sep 21, 2021 |
1111 |
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by Jumyg: 9:12pm On Sep 28, 2021 |
Sam, I am still waiting for your reply. Let me know when 170 blocks owing will be delivered to site. |
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by Jumyg: 1:29pm On Oct 04, 2021 |
Sam still waiting for your reply; you are reading my messages on wats app and not replying. Go and deliver the blocks owing and complete the job. You have slowed this project for too long and I have been patient enough with you. Do not let me bring your case to the (general property) forum and expose you. |
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by Jumyg: 6:03pm On Oct 17, 2021 |
Beware of Segzy14, he has no integrity, he is a thief and a liar. One chance engineer. |
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by Jumyg: 9:58am On Dec 01, 2021 |
@Segzy14 (Sam) go and supply the blocks you stole and complete the (blockwork stage 2) job. I paid you 600k for workmanship and 100k for supervision you were never on-site to supervise. You have no integrity, you are a thief and a liar. Beware everyone and DO NOT let him handle your project. He is a one-chance engineer. |
| Re: Construction Process Of Four Bedroom Bungalow @ Mowe by chemicool: 2:02pm On Apr 13, 2022 |
Ok, thanks |
The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process • Construction Process Of Contemporary Mansion At Makogi • CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE • 2 • 3 • 4
Is It Financially Wise To Have Your Own Home? • Urgent Distress Sale: 4units 3bdrms Flats @ Kings Avenue, Yakoyo #35m (wih pics) • 5 Bedroom Duplex Design - 2020 Design