Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 3:48pm On Dec 16, 2020 |
Dear All, I welcome you on board as we unfold the process of this new project. Structure Type : A contemporary Duplex Client : A Nairalander in Diaspora Foundation type : Raft-pile foundation Budget: N/A (project to be executed in phases) |
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 3:57pm On Dec 16, 2020 |
3Ds
|
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 4:02pm On Dec 16, 2020 |
Floor plans
|
Re: Construction Process Of Contemporary Mansion At Makogi by twinskenny(m): 4:25pm On Dec 16, 2020 |
Good luck Engr |
Re: Construction Process Of Contemporary Mansion At Makogi by mufutau55(m): 5:26pm On Dec 16, 2020 |
Following Boss. Hajji M. |
Re: Construction Process Of Contemporary Mansion At Makogi by kopell: 6:26pm On Dec 16, 2020 |
Aventures:Congratulation my able Engineer, nice to see you here again. I hope you’re still available to take our kobokobo project. |
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 6:27pm On Dec 16, 2020 |
kopell:Thanks Sir, well available sir |
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 6:52pm On Dec 16, 2020 |
Foundation Details: The site is a bit prone to flood due to lack of drainage network and oyan dam. Also the soil nature is greyish soft clay. This kind of clay behave harphazadly when it is soaked with water when the water table is high and when it dries. We considered several options but we decided to take a well informed decision and we did soil test. The report came out and we found out that the after the top soil it is clay all the way to about 6m before the layer of coarse sand . Also the report informed us that the clay is very soft and it has a high compressibility, there fore 7 meter pile was recommended. The safe bearing capacity is very high and also the clay also has it's own strength. The consequences of high compressibility of the soft clay is that there is possibility of uneven settlement of perennial cracks as a result of anomalous behavior of the clay (expand during raining season and shrinks during dry season). Now, the birth of Raft-pile foundation is to combine the strength of the clay at about 300mm below the ground level and safe bearing capacity of the pile. This will bring about less number of piles and moreso the piles will act as nominal pile and it is major purpose is to prevent uneven settlement and possibly structural cracks. The foundation height is 1.7m so as to mitigate against flooding as much as possible. A pics showing section of the foundation will be posted shortly 4 Likes 1 Share |
Re: Construction Process Of Contemporary Mansion At Makogi by folmus: 7:50pm On Dec 16, 2020 |
following! |
Re: Construction Process Of Contemporary Mansion At Makogi by jiday4(m): 8:07pm On Dec 16, 2020 |
Wow makogi is my area o, following with rapt attention sir . Kudos boss |
Re: Construction Process Of Contemporary Mansion At Makogi by ayodele17893: 8:51pm On Dec 16, 2020 |
:Congratulation my able Engineer, nice to see you here again. I hope you’re still available to take our kobokobo project. Thanks Sir, well available sir |
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 9:19pm On Dec 16, 2020 |
ayodele17893:Thanks sir |
Re: Construction Process Of Contemporary Mansion At Makogi by Chekitaut: 9:56pm On Dec 16, 2020 |
Nice one, am glad to be part of this project, congratulations Eng. Aventure. Nice one. Thumps up 1 Like |
Re: Construction Process Of Contemporary Mansion At Makogi by SurveyorGeo: 10:52pm On Dec 16, 2020 |
Following |
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 2:09pm On Dec 18, 2020 |
Foundation section
|
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 2:13pm On Dec 18, 2020 |
Soil test pictures.
|
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 2:16pm On Dec 18, 2020 |
Pile work pics. The piling was done using Hydra rotary machine
|
Re: Construction Process Of Contemporary Mansion At Makogi by kopell: 3:14am On Dec 20, 2020 |
Aventures:Engineer I beg where is this place called Makogi? You don't have to expose the exact location because of privacy. I never heard of this place before, I just want to have an idea if it's in Lagos. |
Re: Construction Process Of Contemporary Mansion At Makogi by jiday4(m): 9:07am On Dec 20, 2020 |
kopell: Makogi is inside Magboro ,Ogun State but very close to Lagos |
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 6:42am On Dec 21, 2020 |
jiday4:Thanks. Very correct � |
Re: Construction Process Of Contemporary Mansion At Makogi by ArcToyin(m): 5:19pm On Dec 25, 2020 |
Let me follow for the first time. |
Re: Construction Process Of Contemporary Mansion At Makogi by mendii(m): 6:29pm On Dec 27, 2020 |
mufutau55:wow You seem to follow every construction related thread |
Re: Construction Process Of Contemporary Mansion At Makogi by mufutau55(m): 7:01pm On Dec 27, 2020 |
mendii: Yes Sir. That is how we learn. Thank you. Hajji M. 1 Like 1 Share |
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 9:32pm On Dec 24, 2021 |
Season Greetings to all, We are happy to close the years with the construction of this project decking.
|
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 9:34pm On Dec 24, 2021 |
More pictures. This is a frame structure construction.
|
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 9:35pm On Dec 24, 2021 |
Perforated canopy 1.5m x 6.5m
|
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 9:58pm On Dec 24, 2021 |
More views
|
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 10:08pm On Dec 24, 2021 |
Some updated 3Ds
|
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 11:22am On Jan 19, 2022 |
Pics update. Steel shuttered erected for columns
|
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 11:25am On Jan 19, 2022 |
More pics
|
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 1:23pm On Jan 19, 2022 |
Steel columns shutters for rent 3m high |
Re: Construction Process Of Contemporary Mansion At Makogi by Aventures(m): 8:10pm On Sep 24, 2022 |
Our mansion progressing with work on roof gutter, concrete sun breakers, pragolas 1 Like
|
(1) (Reply)
Three Bedroom Flats Available In Ladipo, Papa Ajao, Mushin / Mr Donald The Roof And Doors Importer From Batlan Concept Limited (07062764235) / 42” Class LCD HDTV With 1080p Resolution For N50k Cash!!!
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 20 |