How We Designed & Built This 4-Flat Apartment in Lagos – Full Process - Properties - Nairaland
Nairaland Forum › Nairaland General › Properties › How We Designed & Built This 4-Flat Apartment in Lagos – Full Process (10263 Views)
| How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 11:22pm On Jan 23, 2023*. Modified: 2:27pm On Feb 12 |
Greetings and welcome to our thread We are glad to announce that we are starting yet another project for a nairalander Project Type: block of flats (2 units of 2bedrooms, 2 units of mini flats). Land size : 31m x 16m Packing space: 4 cars Budget : Undisclosed Client : Nairalander. |
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 11:27pm On Jan 23, 2023*. Modified: 10:24am On Dec 28, 2023 |
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 11:40pm On Jan 23, 2023*. Modified: 10:20am On Dec 28, 2023 |
Site Analysis The site we inherited is one that had an existing structure, (4 bedrooms bungalow) but since our client cannot ascertain the quality of materials used by the previous owner, the option of conversion was thrown out. And our first task is to bring down the old structure . It is also worthy of note that the land is really a sloppy one. https://youtube.com/shorts/hUlRxaSleHQ?si=QP2MKhN6e0d5F_np
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 11:45pm On Jan 23, 2023 |
Materials are been supplied
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by guzbit(m): 11:46pm On Jan 23, 2023 |
Charisdesigns:nice one sir I’m into roofing also sir You can kindly patronize me on any type of roofing and promise to do well 🙏 WhatsApp or call number sir 08091163061 |
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 11:55pm On Jan 23, 2023 |
guzbit:Okay sir |
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 11:57pm On Jan 23, 2023 |
Cement Sand Granite Reinforcement All received and we are set
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 12:06am On Jan 24, 2023 |
Borehole drilling Not armed with geotechnical test result, when we got to site, we already assumed by visualization based on the topology of the land, that we will be needing a boring machine for the borehole. Long story cut short, in few hours we had our borehole hand drilled with clean water gushing.
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 12:13am On Jan 24, 2023*. Modified: 12:31am On Jan 24, 2023 |
Before we go too far we had a lalasti.lala visitor ![]() But no, nodody ate it ![]()
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 5:44pm On Jan 25, 2023 |
Setting out is done We hit ground and running
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by folmus: 10:45am On Jan 26, 2023 |
following with rapt attention. |
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by josite: 11:15am On Jan 26, 2023 |
cvongrats |
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 11:14pm On Jan 27, 2023 |
folmus:Welcome Thanks for following |
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 11:14pm On Jan 27, 2023 |
josite:Thanks |
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 11:18pm On Jan 27, 2023 |
Before I proceed, I must say this, if you are purchasing a land, please try as much as possible not to get one that’s on a sloppy ground. That only can shot up your project (foundation cost) by 25% |
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 11:46pm On Jan 27, 2023*. Modified: 12:15am On Jan 28, 2023 |
Blinding / pad foundation casting
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by bfn1: 2:51am On Jan 28, 2023 |
Charisdesigns:Thanks for the reminder. |
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 8:09pm On Jan 28, 2023 |
Foundation block setting
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 6:12pm On Jan 29, 2023 |
More
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 6:15pm On Jan 29, 2023 |
More on foundation block wall
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 6:17pm On Jan 29, 2023 |
More
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 9:30pm On Feb 01, 2023 |
Foundation block keeps rising
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 9:36pm On Feb 01, 2023 |
More
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 9:38pm On Feb 01, 2023 |
Filling materials arrives
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by bumi10(m): 12:04am On Feb 02, 2023 |
This is perfect work. More grace |
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 8:13pm On Feb 03, 2023 |
bumi10:Thank you |
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 8:24pm On Feb 03, 2023*. Modified: 9:25pm On Feb 03, 2023 |
Tie Chain beam. For stability and column slenderness we introduced tie beam. The main function of the tie-beam is to act as a length breaker for the wall/column and reduce slenderness ratio.
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 8:27pm On Feb 03, 2023 |
We have about 9 course at some part of the foundation wall
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 8:33pm On Feb 03, 2023 |
Backfilling with laterite soil
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 8:36pm On Feb 03, 2023 |
More
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 9:59am On Feb 04, 2023 |
More filling received
|
| Re: How We Designed & Built This 4-Flat Apartment in Lagos – Full Process by Charisdesigns(op): 3:43pm On Feb 05, 2023 |
Another Day another snake Same specie. Abeg who knows the name ![]()
|
See This 4 Bedroom Bungalow Architectural Design • See This 4 Bedroom Bungalow Architectural Design • 31-Year-Old Landlady: 'I Built This House With My Money, Not With My Body' • 2 • 3 • 4
Duplexes For Sale : At Friend's Colony Estate,lekki-lagos Nigeria. • Building Plan Cost • Best Modern Pop Celings, Artworks, Cornices, Skirtings @ Affordable Rates

