₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,325,767 members, 8,423,653 topics. Date: Wednesday, 10 June 2026 at 05:29 AM

Toggle theme

Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today - Travel (2) - Nairaland

Nairaland ForumNairaland GeneralTravelAnxiety As FG Resumes Work On Lagos-Ibadan Expressway Today (18718 Views)

1 2 Reply (Go Down)

Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by WhisperedNoise: 1:53pm On Jul 03, 2023
happney65:
E gbe enu buruku yi soun. Anywhere there is road construction there will always be issues like this and delays. Even abroad. No way you try and divert traffic there will still be massive hold ups.

Even while controlling traffic it is still you human beings that will be jumping traffic and be causing more hold ups instead of being patient.

Road no good,we complain. Reconstruction starts to fix the bad road una still go complain.

What else exactly do you human beings want? Do you like the current state of the road?

Haba! undecided
Why are you so rude? You have Stockholm syndrome. You are used to suffering.

In Dubai, there is ALWAYS construction, yet you won't see gridlock or accidents. Lagos Ibadan expressway is becoming a shame. It's not an underwater road, neither is it a subway. Ordinary stretch of road is taking them years to build. What if we want to build a 10km subway or metro? It'll take them 50 years.

Many Nigerians don't know better. That's why we don't demand more accountability from the government. Very sad.
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by happney65: 2:04pm On Jul 03, 2023
WhisperedNoise:
Why are you so rude? You have Stockholm syndrome. You are used to suffering.

In Dubai, there is ALWAYS construction, yet you won't see gridlock or accidents. Lagos Ibadan expressway is becoming a shame. It's not an underwater road, neither is it a subway. Ordinary stretch of road is taking them years to build. What if we want to build a 10km subway or metro? It'll take them 50 years.

Many Nigerians don't know better. That's why we don't demand more accountability from the government. Very sad.
In road construction, na as money dey ground na so them dey release to contractors. Contractors won't do road for free or on credit. That is something I want you to know.

In as much as our government might be useless and the Buhari administration that started this is a very useless one too. But on that road I give it to them. First time since 1979 the road was constructed that there is a real effort to fix it once and for all..

Inflation and the likes are the major inpendiments to road construction. But at least there is an effort to fix this and a major part of it has been done,far better than it was before except if you don't want to be truthful.

So I see no reason for people not to be patient. The work isn't abandoned, construction is on going. It is the same road that is being done that people are still passing so tell me why there won't be delays

That is what I am saying. Why are you complaining when you are seeing heavy construction of road in front of you

Why?
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by Tinubuwins2023e: 2:08pm On Jul 03, 2023
yinkus6750:
Don't know why it's difficult to control traffic and ensure hitch free vehicular movement during road construction.
Spending three hours in grid lock is due to senseless planning and uncoordinated activities
Alternative routes,diversion during hectic periods , timing of construction works to exclude hectic traffic hours would definitely resolve this problematic scenario.
If you haven't been to the place, don't just seat down in your cubicle and talk as if those people onsite don't have sense. There is nothing they can do until that road is completed dude
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by porthouse7(f): 2:09pm On Jul 03, 2023
ZIKORAMAMACHI:
This work must favour me and my family.
bitterleaf and apku eating trib
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by obaidan: 2:10pm On Jul 03, 2023
mignone:
Yes o & delivered since April 29th, 2023, according to inspector Fashola
Loool
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by tishbite42: 2:23pm On Jul 03, 2023
Akinboboz:
Since obasanjo era and not Jonathan, work no dey finished for that road, well, nah busiest road in Africa, what do you expect.
Una don come again
Which kain record be this one?
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by Microwhy: 2:33pm On Jul 03, 2023
The most famous/popular road after second Niger Bridge
Lagos-Ibadan Express road, the baby girl of every government.
Even we wey no sabi the road physically, don sabi em from daily news and headlines.
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by Newton2024: 2:35pm On Jul 03, 2023
WhisperedNoise:
They're always working on this road. Smh
I don't know why. I've never seen any repair work on road connecting California to Las Vegas before.
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by Menclothing: 2:38pm On Jul 03, 2023
Most people on this comment section don’t pass that road the quality is superb but Nigerians maintenance culture is zero toll that road use money generated to construct more road within region road is toll
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by Chetas81(m): 2:41pm On Jul 03, 2023
Nigerian citizen never consider their self as bad citizen, the truth you know shall set you free or not to ✍️
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by nedu666: 2:46pm On Jul 03, 2023
wman:
They've been working on this Lagos-Ibadan Expressway since Jonathan's era. That's over 10 years ago.

Only God knows when they'll complete it.
Since obasanjo. Bi courtney was first contractor
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by hardbody: 2:46pm On Jul 03, 2023
yinkus6750:
Don't know why it's difficult to control traffic and ensure hitch free vehicular movement during road construction.
Spending three hours in grid lock is due to senseless planning and uncoordinated activities
Alternative routes,diversion during hectic periods , timing of construction works to exclude hectic traffic hours would definitely resolve this problematic scenario.
I agree with you, planning is key. I left Abeokuta by 9am on that Sunday and drove through that stretch like breeze. Persons that came later are the ones with tales. Plan your movement.
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by frog12: 2:47pm On Jul 03, 2023
na everytime dem dey work on this road.
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by Dchampion65: 3:11pm On Jul 03, 2023
2mercy:
https://www.vanguardngr.com/2023/07/anxiety-as-fg-resumes-work-on-lagos-ibadan-expressway-today/#google_vignette
Why is it taking so long.
Those born when the contract was awarded are planning to get married already.
Is there something not too clear to us.
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by Oxtertee(m): 3:23pm On Jul 03, 2023
ZIKORAMAMACHI:
This work must favour me and my family.
Oga, E no favor Kan Kan. You need to see the hrs I spent in traffic this morning just from iwo rd / Ile marun - sawmill area. It was really tiring.
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by adefitim(m): 3:25pm On Jul 03, 2023
FG has been constructing and rehabilitating this particular road since time immemorial.... SHAME
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by Allikola(m): 4:21pm On Jul 03, 2023
What is the situation on Lagos Ibadan Expressway today
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by kunyeo(m): 5:12pm On Jul 03, 2023
phr0nesis:
Work no de ever finish for this road
You are right.Work no dey finish.It is likely one of the busiest roads in the country and as they are finishing one portion,the other would have dilapidated so the circle continues.
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by phr0nesis(m): 5:32pm On Jul 03, 2023
kunyeo:
You are right.Work no dey finish.It is likely one of the busiest roads in the country and as they are finishing one portion,the other would have dilapidated so the circle continues.
I noticed it. I noticed that they worked twice on a particular area on that road
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by GreatrAnalyst: 5:48pm On Jul 03, 2023
WhisperedNoise:
They're always working on this road. Smh
This road has been in repair/re-work/re-construction before Buhari came to power.
But here we are still... Still not completed
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by Invitationn: 5:50pm On Jul 03, 2023
wman:
They've been working on this Lagos-Ibadan Expressway since Obasanjo's era. That's over 15 years ago.

Only God knows when they'll complete it.

Modified from Jonathan to OBJ.

Thanks for the correction guys.
OBJ and GEJ worked on it on paper.
Action never materialised.
That express was an eyesore prior Buhari’s intervention.
Real work started on the road during Buhari’s second term.
Honestly, I am surprised that the construction is yet to be completed because I used to live in Redemption camp and I saw the progress of the project and suffered all the gridlocks. Before I moved out of that area last year, they’ve completed most parts of the project.
Mowe to Berger both lanes.
Mowe to Ibadan tollgate, in fact, they’ve started one of the lanes in the populated areas.
They’ve started the Berger -Secretariat- Iyana oworo/3rd mainland axis too.
They’ve done one of the lanes past secretariat sef.

That’s like 85-90% of the construction then.
Of course, it takes more time constructing high traffic axis and I believe that’s why they left them for last. Still, the road supposed don finish.
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by seguno2: 7:43pm On Jul 03, 2023
2mercy:
https://www.vanguardngr.com/2023/07/anxiety-as-fg-resumes-work-on-lagos-ibadan-expressway-today/#google_vignette
The never ending project of the fraudulent APC people, who have borrowed us into eternal miseryhuh
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by Lekan239(m): 8:31pm On Jul 03, 2023
shiwex:
Only in Nigeria..... a dual carriage way that is less than 150 kms taking 8 years.. Well done APC... REAL DEVELOPMENT
obasanjo started, yaradua no fit complete, Jonathan no fit complete, mumu buhari no fit complete. But Awa Tinubu will complete it.
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by Akinboboz(m): 10:10pm On Jul 03, 2023
tishbite42:
Una don come again
Which kain record be this one?
Go and verify it and if you don't like it, go to court 👨‍⚖️
Re: Anxiety As FG Resumes Work On Lagos-Ibadan Expressway Today by Bebissa: 11:28am On Jul 04, 2023
phr0nesis:
Work no de ever finish for this road
Ah bin wan ask the same thing oo.. Always budgeting billions for this road, but work no dey ever finish
1 2 Reply

Anxiety As Images Of Depressed Nigerians In Canada Flood InternetFG Resumes Work On Abuja-Kaduna-Kano Road ProjectMajor Blow For Foreign Airlines As FG Shuts Abuja, Lagos Airport In A Few Days234

FG Announces Free Ride On Port Harcourt-Aba Railway From May 1-4491 Libyan Returnees Land In Port-harcourt (photos)See How Dead Bodies Is Transported In Abia State Because Of Bad Road