Final Phase Of Maiduguri Gas Power Plant Completed by Flathead8(op): 4:28pm On Jul 10, 2023
Final phase of Maiduguri Gas Power Plant completed

Installation of a liquefied natural gas tank at the Maiduguri Emergency Gas Power Plant has been completed.

Greenville LNG, the company contracted for the project confirmed the development in a statement issued through its LinkedIn page on Friday.

'We are pleased to announce that Greenville LNG, in partnership with NNPC, has achieved a successful and on-schedule installation of the LNG tank and equipment at the Maiduguri Power Plant.

'This collaborative project holds great promise for driving positive economic growth and creating new business opportunities in Borno, Maiduguri.

'The successful completion of this endeavor further underscores Greenville's steadfast commitment to leadership in the oil and gas sector and its unwavering dedication to promoting the utilization of gas in Nigeria,' the statement read,’ part of the statement read.

The 50-megawatt power plant was initially designed with a diesel and gas competent.

President Muhammadu Buhari, March 2, 2023 officially commissioned the project with only the diesel component.

The completion of the gas component is considered another milestone achievement for the reliable and sustainable electricity generation.

The power project was necessitated by the extended power outages experienced in the state capital as a result of vandalism of transmission line along Maiduguri-Damaturu Road by the insurgents.

This installation LNG tank, by Greenville, means the gas power plant can begin full operation and supply of power to Borno state and environs.

Re: Final Phase Of Maiduguri Gas Power Plant Completed by Creamcrest(m): 4:33pm On Jul 10, 2023
Mumu Nigerians.

Why build this in a boko ravaged state?

Very soon shekau and his apostles will soon bomb the hell out of it.

I trust him on that.
Re: Final Phase Of Maiduguri Gas Power Plant Completed by Absuchat(m): 4:55pm On Jul 10, 2023
Impressive. All the eastern( north east and South East) zones in Nigeria are developing massively
Re: Final Phase Of Maiduguri Gas Power Plant Completed by Ihateheadslamer: 4:58pm On Jul 10, 2023
Boko haram is technically defeated according to chief Liar Mohamed tongue
Creamcrest:
Mumu Nigerians.

Why build this in a boko ravaged state?

Very soon shekau and his apostles will soon bomb the hell out of it.

I trust him on that.
Re: Final Phase Of Maiduguri Gas Power Plant Completed by citygarden(m): 5:02pm On Jul 10, 2023
Good. If is not audio completion like Dangote refinery.
Re: Final Phase Of Maiduguri Gas Power Plant Completed by dustmalik(m): 5:07pm On Jul 10, 2023
Creamcrest:
Mumu Nigerians.

Why build this in a boko ravaged state?

Very soon shekau and his apostles will soon bomb the hell out of it.

I trust him on that.
Just come out plain and say that you're not happy with this development because it pains you that it's located in the North.

Do you think the company that built this gas plant are so foolish that they would site it at a vulnerable location?
Re: Final Phase Of Maiduguri Gas Power Plant Completed by SSFeedsNigeria: 5:15pm On Jul 10, 2023
White elephant project!

Building gas power plant in the middle of desert doesn't make sense. Where will the gas feed come from?
Re: Final Phase Of Maiduguri Gas Power Plant Completed by Purvan(m): 5:16pm On Jul 10, 2023
Very soon Boko Haram wee use this one as their weapon of mass destruction
Re: Final Phase Of Maiduguri Gas Power Plant Completed by marlow1962(m): 5:27pm On Jul 10, 2023
dustmalik:
Just come out plain and say that you're not happy with this development because it pains you that it's located in the North.

Do you think the company that built this gas plant are so foolish that they would site it at a vulnerable location?
What do you mean by vulnerable location? And where are the vulnerable locations in other regions?
Re: Final Phase Of Maiduguri Gas Power Plant Completed by BeautifulMind2: 5:36pm On Jul 10, 2023
Flathead8:
Final phase of Maiduguri Gas Power Plant completed

Installation of a liquefied natural gas tank at the Maiduguri Emergency Gas Power Plant has been completed.

Greenville LNG, the company contracted for the project confirmed the development in a statement issued through its LinkedIn page on Friday.

'We are pleased to announce that Greenville LNG, in partnership with NNPC, has achieved a successful and on-schedule installation of the LNG tank and equipment at the Maiduguri Power Plant.

'This collaborative project holds great promise for driving positive economic growth and creating new business opportunities in Borno, Maiduguri.

'The successful completion of this endeavor further underscores Greenville's steadfast commitment to leadership in the oil and gas sector and its unwavering dedication to promoting the utilization of gas in Nigeria,' the statement read,’ part of the statement read.

The 50-megawatt power plant was initially designed with a diesel and gas competent.

President Muhammadu Buhari, March 2, 2023 officially commissioned the project with only the diesel component.

The completion of the gas component is considered another milestone achievement for the reliable and sustainable electricity generation.

The power project was necessitated by the extended power outages experienced in the state capital as a result of vandalism of transmission line along Maiduguri-Damaturu Road by the insurgents.

This installation LNG tank, by Greenville, means the gas power plant can begin full operation and supply of power to Borno state and environs.
Nigeria never learn building gas plant in area there's no gas deposit just like Kaduna refinary, always wasting resources, soon this one will collapse
Re: Final Phase Of Maiduguri Gas Power Plant Completed by flokii: 7:20pm On Jul 10, 2023
Nice one..
See how other regions are working hard to better lives of their people while our Eastern brothers are doing Mondays sit at home and week-llong sit at home. Later they'll turn to blame Yorubas and Hausas for their woes.
Re: Final Phase Of Maiduguri Gas Power Plant Completed by omenka(m): 7:24pm On Jul 10, 2023
Creamcrest:
Mumu Nigerians.

Why build this in a boko ravaged state?

Very soon shekau and his apostles will soon bomb the hell out of it.

I trust him on that.
I guess they should have built it in your backyard which hosts Angel Unknown Gunmen. That way you and your ancestors would be pleased.

Complain about every damn thing. I'm not sure some of you know how silly that makes you look.
Re: Final Phase Of Maiduguri Gas Power Plant Completed by XerXers: 7:27pm On Jul 10, 2023
omenka:
I guess they should have built it in your backyard which hosts Angel Unknown Gunmen. That way you and your ancestors would be pleased.

Complain about every damn thing. I'm not sure some of you know how silly that makes you look.
50MW? Glorified generator.

Re: Final Phase Of Maiduguri Gas Power Plant Completed by Afamed: 7:32pm On Jul 10, 2023
Creamcrest:
Mumu Nigerians.

Why build this in a boko ravaged state?

Very soon shekau and his apostles will soon bomb the hell out of it.

I trust him on that.
Borno is more peaceful than SE as we speak.

Presently in Bolori area in Maiduguri now

No sit at home on Monday. Every one is going around with his or her business
Re: Final Phase Of Maiduguri Gas Power Plant Completed by omenka(m): 7:32pm On Jul 10, 2023
XerXers:
50MW? Glorified generator.
Should they have built the glorified generator inside your backyard? Stop sulking over every darn thing. Makes you look silly.
Re: Final Phase Of Maiduguri Gas Power Plant Completed by XerXers: 8:16pm On Jul 10, 2023
omenka:
Should they have built the glorified generator inside your backyard? Stop sulking over every darn thing. Makes you look silly.
Let them built it in the Sahel, what's my business
Re: Final Phase Of Maiduguri Gas Power Plant Completed by XerXers: 8:16pm On Jul 10, 2023
Afamed:
Borno is more peaceful than SE as we speak.

Presently in Bolori area in Maiduguri now

No sit at home on Monday. Every one is going around with his or her business
Sit at home is not insecurity
Re: Final Phase Of Maiduguri Gas Power Plant Completed by helinues: 8:24pm On Jul 10, 2023
The so called troubled north is progressing while the acclaimed peaceful region are locking the themselves up every Mondays
Re: Final Phase Of Maiduguri Gas Power Plant Completed by Flathead8(op): 8:26pm On Jul 10, 2023
Your presently in Borno State, how is the security situation?
Afamed:
Borno is more peaceful than SE as we speak.

Presently in Bolori area in Maiduguri now

No sit at home on Monday. Every one is going around with his or her business
Re: Final Phase Of Maiduguri Gas Power Plant Completed by baralatie(m): 8:26pm On Jul 10, 2023
You are piping gas from how many kilometers to supply a 50mw power plant?🙆🙆🙆🙆
Re: Final Phase Of Maiduguri Gas Power Plant Completed by baralatie(m): 8:28pm On Jul 10, 2023
helinues:
The so called troubled north is progressing while the acclaimed peaceful region are locking the themselves up every Mondays
You cannot continues to behave like this all the time🤧🤧🤧
Re: Final Phase Of Maiduguri Gas Power Plant Completed by Flathead8(op): 8:28pm On Jul 10, 2023
Check my topics, na because of them i purposely and normally make threads. I love seeing their tears, it gives me orgasm seeing them hate grin
helinues:
The so called troubled north is progressing while the acclaimed peaceful region are locking the themselves up every Mondays
omenka:
I guess they should have built it in your backyard which hosts Angel Unknown Gunmen. That way you and your ancestors would be pleased.

Complain about every damn thing. I'm not sure some of you know how silly that makes you look.
Re: Final Phase Of Maiduguri Gas Power Plant Completed by Afamed: 8:31pm On Jul 10, 2023
Flathead8:
Your presently in Borno State, how is the security situation?
The Borno is coming back to its old glory.

My first visit in 2002, I got there around 10pm. The bike took me to the hotel , patiently waited for me to take me to ATM point where I withdrew money and took me back to the hotel

Like I said, Maiduguri is very peaceful as we speak.
Re: Final Phase Of Maiduguri Gas Power Plant Completed by Flathead8(op): 8:34pm On Jul 10, 2023
Glory to God. Their lucky to have good governors, kashim and Zulum

But what took you to borno?
Afamed:
The Borno is coming back to its old glory.

My first visit in 2002, I got there around 10pm. The bike took me to the hotel , patiently waited for me to take me to ATM point where I withdrew money and took me back to the hotel
Re: Final Phase Of Maiduguri Gas Power Plant Completed by baralatie(m): 8:34pm On Jul 10, 2023
helinues:
Yeh my head oo

Are you competing with Boko Haram in bomb throwing?
You should ask where is the gas coming from and how will the diesel be delivered to a 50mw power plant
Re: Final Phase Of Maiduguri Gas Power Plant Completed by adedayoa2(f): 9:18pm On Jul 10, 2023
Creamcrest:
Mumu Nigerians.

Why build this in a boko ravaged state?

Very soon shekau and his apostles will soon bomb the hell out of it.

I trust him on that.
You think it is every place in Maiduguri that is not safe?
Re: Final Phase Of Maiduguri Gas Power Plant Completed by omenka(m): 9:18pm On Jul 10, 2023
XerXers:
Let them built it in the Sahel, what's my business
The word applicable to your comment is "build" not built.

Y'all illiterates, that's why you never seem to make any sensible comments. Condemn, condemn, condemn, that's all your brains ever come up with. It's appalling.
Re: Final Phase Of Maiduguri Gas Power Plant Completed by obo389(m): 5:34am On Jul 11, 2023
Flathead8:
Final phase of Maiduguri Gas Power Plant completed

Installation of a liquefied natural gas tank at the Maiduguri Emergency Gas Power Plant has been completed.

Greenville LNG, the company contracted for the project confirmed the development in a statement issued through its LinkedIn page on Friday.

'We are pleased to announce that Greenville LNG, in partnership with NNPC, has achieved a successful and on-schedule installation of the LNG tank and equipment at the Maiduguri Power Plant.

'This collaborative project holds great promise for driving positive economic growth and creating new business opportunities in Borno, Maiduguri.

'The successful completion of this endeavor further underscores Greenville's steadfast commitment to leadership in the oil and gas sector and its unwavering dedication to promoting the utilization of gas in Nigeria,' the statement read,’ part of the statement read.

The 50-megawatt power plant was initially designed with a diesel and gas competent.

President Muhammadu Buhari, March 2, 2023 officially commissioned the project with only the diesel component.

The completion of the gas component is considered another milestone achievement for the reliable and sustainable electricity generation.

The power project was necessitated by the extended power outages experienced in the state capital as a result of vandalism of transmission line along Maiduguri-Damaturu Road by the insurgents.

This installation LNG tank, by Greenville, means the gas power plant can begin full operation and supply of power to Borno state and environs.
Source please
Re: Final Phase Of Maiduguri Gas Power Plant Completed by ican2020: 6:23am On Jul 11, 2023
Afamed:
Borno is more peaceful than SE as we speak.

Presently in Bolori area in Maiduguri now

No sit at home on Monday. Every one is going around with his or her business
That’s cool
So, move over to that area and enjoy the peace with them
Re: Final Phase Of Maiduguri Gas Power Plant Completed by Flathead8(op): 8:48am On Jul 11, 2023
Re: Final Phase Of Maiduguri Gas Power Plant Completed by Afamed: 10:13am On Jul 11, 2023
ican2020:
That’s cool
So, move over to that area and enjoy the peace with them
Why should I bother myself with inconsequential entity like you?