₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,344,705 members, 8,513,287 topics. Date: Wednesday, 04 November 2026 at 05:34 PM

Toggle theme

Heavy Iron Brackets & Drains Stripped From 2nd Niger Bridge -faces Closure-video - Politics - Nairaland

Nairaland Forum › Nairaland General › Politics › Heavy Iron Brackets & Drains Stripped From 2nd Niger Bridge -faces Closure-video (1564 Views)

1 Reply (Go Down)

Heavy Iron Brackets & Drains Stripped From 2nd Niger Bridge -faces Closure-video by worksmart(op): 3:56pm On Aug 01, 2023
More Tinubu magic:
First Lagos Airport lights disappears, now huge numbers of heavy metal braces and drains are stripped from Second Niger Bridge.

Permanent Secretary of Ministry of works threatens closure of Muhammadu Buhari Bridge a.k.a. Second Niger Bridge , if security cannot be assured.

Each metall brace must weigh at least a ton and each drain unit not much lighter scores of expensive and very heavy bridge braces and drains units have been stripped from the bridge whilst Julius Berger very slowly working on finishing off the approach road and interchange on the Asaba end of the bridge.

What a coincidence, first expensive airport lights is stripped in Lagos, now installed heavy metal units get stripped from 2nd Niger Bridge both within a few weeks of BAT being sworn in.

I smell another Tinubu looting strategy in collusion with useless Julius Berger!


https://www.youtube.com/watch?v=tM3UWor3-3c
Re: Heavy Iron Brackets & Drains Stripped From 2nd Niger Bridge -faces Closure-video by worksmart(op): 3:58pm On Aug 01, 2023
Tinubu Magic! grin
Re: Heavy Iron Brackets & Drains Stripped From 2nd Niger Bridge -faces Closure-video by MICHEALADEX(m): 4:06pm On Aug 01, 2023
This Tinubu ehn...why will MC oluomo boys go and steal those iron
Re: Heavy Iron Brackets & Drains Stripped From 2nd Niger Bridge -faces Closure-video by jonapeters: 4:07pm On Aug 01, 2023
Happening In less than 6 months
Re: Heavy Iron Brackets & Drains Stripped From 2nd Niger Bridge -faces Closure-video by DrGoodman: 4:10pm On Aug 01, 2023
Substandard Bridge built by the minister of darkness is already falling apart.

We said it before.
Re: Heavy Iron Brackets & Drains Stripped From 2nd Niger Bridge -faces Closure-video by BoldBrainz(m): 4:17pm On Aug 01, 2023
DrGoodman:
Substandard Bridge built by the minister of darkness is already falling apart.

We said it before.
The news did not say the bridge is falling apart due to natural causes or use of substandard materials. The news says components have been removed or stolen from the bridge.

Go school, you say no. Oponu!
Re: Heavy Iron Brackets & Drains Stripped From 2nd Niger Bridge -faces Closure-video by JOemmy(m): 4:26pm On Aug 01, 2023
Julius Berger knows what nigerians are capable of doing so why did they construct the bridge and make those materials easily movable for scavengers?
Re: Heavy Iron Brackets & Drains Stripped From 2nd Niger Bridge -faces Closure-video by ba7man(m): 4:54pm On Aug 01, 2023
The intelligent Igbo folks really need to show themselves because these ones representing them online are daft cretins.
Re: Heavy Iron Brackets & Drains Stripped From 2nd Niger Bridge -faces Closure-video by TheMensch(m): 9:00pm On Aug 01, 2023
You mean Tinubu sent people to come and steal the iron brackets? huh
Seriously?
These are the set of people I'm sharing the country with?
Dear God!
cry
Re: Heavy Iron Brackets & Drains Stripped From 2nd Niger Bridge -faces Closure-video by BabaRamota1980: 9:03pm On Aug 01, 2023
worksmart:
More Tinubu magic:
First Lagos Airport lights disappears, now huge numbers of heavy metal braces and drains are stripped from Second Niger Bridge.

Permanent Secretary of Ministry of works threatens closure of Muhammadu Buhari Bridge a.k.a. Second Niger Bridge , if security cannot be assured.

Each metall brace must weigh at least a ton and each drain unit not much lighter scores of expensive and very heavy bridge braces and drains units have been stripped from the bridge whilst Julius Berger very slowly working on finishing off the approach road and interchange on the Asaba end of the bridge.

What a coincidence, first expensive airport lights is stripped in Lagos, now installed heavy metal units get stripped from 2nd Niger Bridge both within a few weeks of BAT being sworn in.

I smell another Tinubu looting strategy in collusion with useless Julius Berger!


https://www.youtube.com/watch?v=tM3UWor3-3c
Una go agree now when we say na Ibo dey vandalize infrastructures in Lagos.

See brand new Muhammadu Buhari bridge as dem begin cannibalize am small small. Ehhn!
Re: Heavy Iron Brackets & Drains Stripped From 2nd Niger Bridge -faces Closure-video by worksmart(op): 10:19pm On Aug 01, 2023
Tinubu colluding with Julius Berger to remove the installed units so that they can request money from treasury to share between themselves.

Same thing happened to Lagos airport lights that disappeared; Tinubu got people to hide them so he can get more money out of the treasury that he can loot.
TheMensch:
You mean Tinubu sent people to come and steal the iron brackets? huh
Seriously?
These are the set of people I'm sharing the country with?
Dear God!
cry
Re: Heavy Iron Brackets & Drains Stripped From 2nd Niger Bridge -faces Closure-video by worksmart(op): 8:53am On Aug 03, 2023
Most people conclude that this is an inside job carried out by the contractor Julius Berger but I believe seeing that similar thing happened with the Lagos airport with nobody being prosecuted or dismissed, it would appear to be an emerging trend in the new Tinubu administration.
Hence reason I concluded Tinubu is behind both the Lagos airport lights incident and this latest incident on the Muhmmadu Buhari Bridge a.k.a. the Second Niger Bridge.
Re: Heavy Iron Brackets & Drains Stripped From 2nd Niger Bridge -faces Closure-video by Christistruth03: 8:56am On Aug 03, 2023
DrGoodman:
Substandard Bridge built by the minister of darkness is already falling apart.

We said it before.
So why didn't the Govs of Delta and the SE contribute to build you a Standard Bridge and collect the refund Later ?
Re: Heavy Iron Brackets & Drains Stripped From 2nd Niger Bridge -faces Closure-video by worksmart(op): 8:30pm On Aug 03, 2023
Tinubu Magic ! angry
1 Reply

Protests Erupt In Anambra State Over Market Closure (Video) • 2nd Niger Bridge Opens For Traffic February 2022 - FG • Ralph Nwosu Visits 2nd Niger Bridge On Assessment Tour • 2 • 3 • 4

BREAKING: Tribunal Upholds Election Of Kaduna Governor • Kanayo O Kanayo Blast Government For Hating Igbo • 80k Minimum Wage Template: Civil Servants Grumble In Bayelsa State