Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by MagReader: 8:15am On Oct 05, 2023
Oga Spyder,good morning.
Quick one.
Is it better to lay tiles before door installation or the other way round.
My tiler was complaining that the door was too low and didn't give him enough space under it and had to reduce the thickness of the sand/cement mix for the tiles to fit.
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 7:23am On Oct 06, 2023
MagReader:
Oga Spyder,good morning.
Quick one.
Is it better to lay tiles before door installation or the other way round.
My tiler was complaining that the door was too low and didn't give him enough space under it and had to reduce the thickness of the sand/cement mix for the tiles to fit.
It's better to place door frames before tiling, and maybe hang the door leaf after tiling. But if it's the type of door where you cannot detach the leaf from the frames, then the whole door should be mounted before the tiling.
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 7:55am On Oct 08, 2023
Works ongoing at this house now

1. Wall screeding
2. Wall and Floor tiles
3. Doors and Windows dressing
4. Electrical fittings

More pictures later
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by brightk(m): 6:27pm On Oct 08, 2023
spyder880:
Works ongoing at this house now

1. Wall screeding
2. Wall and Floor tiles
3. Doors and Windows dressing
4. Electrical fittings

More pictures later
oga spyder i greet u oo.. i don 4get ur username i be de like ur threads back in d days.. abeg u get idea about this geothermal cooling and heating of buildings...
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 6:30pm On Oct 08, 2023
brightk:
oga spyder i greet u oo.. i don 4get ur username i be de like ur threads back in d days.. abeg u get idea about this geothermal cooling and heating of buildings...
No, I don't have much ideas about it, we only use air conditioners that are separately mounted and works independent of each other.
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by brightk(m): 6:31pm On Oct 08, 2023
spyder880:
No, I don't have much ideas about it, we only use air conditioners that are separately mounted and works independent of each other.
maybe u can dig dip 4 us oo... e go be plus 2 ur records grin
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 9:13am On Oct 09, 2023
brightk:
maybe u can dig dip 4 us oo... e go be plus 2 ur records grin
Ok, I will check it when I have more time, thanks.
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 10:03am On Oct 09, 2023
Buying electrical fittings for installation in this house as from this week.

Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 10:22am On Oct 09, 2023
We are buying switches, sockets, spotlights and fittings............

Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 10:25am On Oct 09, 2023
More lighting fittings bought..........

Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 8:19pm On Oct 15, 2023
We have intensified works at this site, works like

Wall screeding works
Tiles, wall and floors
Electrical fittings
Soakaway system

More pictures later
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op):
Soakaway system construction..............

Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 7:01am On Oct 19, 2023
Rushing to complete this house............

Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 7:18am On Oct 19, 2023
More of the front...........

Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op):
Work is also going on at the sides..............

Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 7:44am On Oct 19, 2023
Inside some rooms where we have completed ceilings, floor tiles, wall screeding, and electrical fittings...............

Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 7:52am On Oct 19, 2023
More from the rooms..........

Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 7:55am On Oct 19, 2023
Switches, sockets, fittings...........

Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by PotatoSalad(m): 8:39am On Oct 19, 2023
spyder880:
Switches, sockets, fittings...........
Chief. The owner would have used this opportunity to get smart sockets and switches. This house suppose get some smart home features at least
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 9:26am On Oct 19, 2023
PotatoSalad:
Chief. The owner would have used this opportunity to get smart sockets and switches. This house suppose get some smart home features at least
If it was requested, we will implement.
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by FromZeroToHero(m): 10:42am On Oct 19, 2023
Weldone bro. Please like how many bags of cement did you use for the internal and external plastering and what was the labour cost. Thanks
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 8:56pm On Oct 19, 2023
FromZeroToHero:
Weldone bro. Please like how many bags of cement did you use for the internal and external plastering and what was the labour cost. Thanks
About 400 bags
N1.6m Labour

Thanks.
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by FromZeroToHero(m): 11:15pm On Oct 19, 2023
spyder880:
About 400 bags
N1.6m Labour

Thanks.
Thanks for your response.
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by Rawgold300: 11:33pm On Oct 19, 2023
spyder880:
We have bought the electrical wires needed to wire this house, Cutix cables made in a nearby town..........
Good evening oga spyder, am having issue with my electrician based on the amount of wires he required for the wiring of my project.

Is it possible you tell me how much went into wire purchases ?
And is that all the wire you bought for the project ?

Can you allow your guy project how many wires am going to need ? To be sincere with you, those electrician milk their employer dry when it comes to wire purchase. Pls help with these questions
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 5:16am On Oct 20, 2023
Rawgold300:
Good evening oga spyder, am having issue with my electrician based on the amount of wires he required for the wiring of my project.

Is it possible you tell me how much went into wire purchases ?
And is that all the wire you bought for the project ?

Can you allow your guy project how many wires am going to need ? To be sincere with you, those electrician milk their employer dry when it comes to wire purchase. Pls help with these questions
I think we spent about N1,350,000 on wire purchases alone, before talking of workmanship and supervision. This includes wires for the camera, TV and other installations. Thanks.
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by Rawgold300: 7:18pm On Oct 20, 2023
spyder880:
I think we spent about N1,350,000 on wire purchases alone, before talking of workmanship and supervision. This includes wires for the camera, TV and other installations. Thanks.
That amount makes sense in this Naija economy .. can you believe the guy said I will be needing as much as 1.5mm 20 red 18 black and 20 green.
2.5mm 10red , 10 black
4mm 5red 5 black
16mm 1 red and 1 black
10mm 1 green for the earthing.

Is their a way of knowing the exact amount of wires needed for ones project?
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 10:59pm On Oct 20, 2023
Rawgold300:
That amount makes sense in this Naija economy .. can you believe the guy said I will be needing as much as 1.5mm 20 red 18 black and 20 green.
2.5mm 10red , 10 black
4mm 5red 5 black
16mm 1 red and 1 black
10mm 1 green for the earthing.

Is their a way of knowing the exact amount of wires needed for ones project?
No, you can never be exact, house size and design of the equipment planned to run in the house is always the best way of knowing what it will take.
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by FromZeroToHero(m): 7:19am On Oct 23, 2023
spyder880:
We have brought in our roofing tiles, ready to install them...............
Bro how much per sqm of these roofing sheets and how many did you use for this project. What is the height of your kingpost. Sorry for drawing you back
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 7:37am On Oct 23, 2023
FromZeroToHero:
Bro how much per sqm of these roofing sheets and how many did you use for this project. What is the height of your kingpost. Sorry for drawing you back
N4,000
About 512 sqm
About 6 metres

Thanks.
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by TopazandDiamond: 6:39pm On Oct 24, 2023
We have also started completing works on the ceiling of some rooms..........

This is the master bedroom ceiling

Lovely pop ceiling. Please can you share how much it cost per square meter for the pop - materials and labour.
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 6:13am On Oct 25, 2023
TopazandDiamond:
We have also started completing works on the ceiling of some rooms..........

This is the master bedroom ceiling

Lovely pop ceiling. Please can you share how much it cost per square meter for the pop - materials and labour.
In the confusion that is the Nigerian markets and tumbling economy, it will be suicidal to issue sub contracts like these per square meter, that's a sure way of leaving an uncompleted job. I issued this work as a workmanship alone ceiling contract, so I can hold the guys responsible for the quality of work done and speed. I didn't check the square metres. Thanks.
Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by Gen2men: 5:56pm On Oct 25, 2023
spyder880:
In the confusion that is the Nigerian markets and tumbling economy, it will be suicidal to issue sub contracts like these per square meter, that's a sure way of leaving an uncompleted job. I issued this work as a workmanship alone ceiling contract, so I can hold the guys responsible for the quality of work done and speed. I didn't check the square metres. Thanks.
How did you achieve this sir? Like workmanship for ceiling works ( production and fixing) per room without measuring the sqm?
1 2 3 ... 6 7 8 9 10 11 12 ... 14 Reply