Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha - Properties (3) - Nairaland

Nairaland ForumNairaland GeneralPropertiesBuilding Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha (13023 Views)

1 2 3 4 5 6 7 8 9 Reply (Go Down)

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 12:45pm On Mar 06, 2024
We have continued our works here at this site............

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 12:59pm On Mar 06, 2024
Lintels..........

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 1:07pm On Mar 06, 2024
More......

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 2:37pm On Mar 06, 2024
Columns.............

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 2:40pm On Mar 06, 2024
More of the lintels

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by whirlwind7(m): 4:54am On Mar 10, 2024
spyder880:
Basement flat lintels, foundation for the ground floor flat ongoing...............
The basement walls...
Are you going to treat the walls with any chemical or cement mix that will prevent dampness from seeing into the walls?
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 6:55am On Mar 10, 2024
whirlwind7:
The basement walls...
Are you going to treat the walls with any chemical or cement mix that will prevent dampness from seeing into the walls?
Yes, during the finish.
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 4:27pm On Mar 14, 2024
We continue to build this house, the foundation on the other side..............

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op):
More pictures

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 5:12pm On Mar 14, 2024
Making more blocks for the next stages...........

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 6:00pm On Mar 14, 2024
We bought basement decking materials today, planks, bamboo, polines, nails, binding wire and other items............

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by michlins(m): 6:13am On Mar 15, 2024
Jisie ike nna anyị
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 9:31am On Mar 17, 2024
We are moving fast on this building, completion of the foundation on the other side, plus the decking of the basement flat.............

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 9:32am On Mar 17, 2024
Foundation filling, plus the decking wood works for the basement flat............

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 10:28am On Mar 17, 2024
Decking iron reinforcement, electrical piping coming up this week, more pictures later.
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 10:09pm On Mar 17, 2024
At the end of our works today..................

Decking wooden platform done, filling sand into the other flat in readiness for the DPC and then the decking of the basement flat.

Preparations for more blocks to be made, chippings and iron reinforcement supplies planned for tomorrow and next.

More updates later.

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 5:57am On Mar 20, 2024
More works going on at this site today...........

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 6:00am On Mar 20, 2024
More pictures from around the project

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 6:03am On Mar 20, 2024
Beams connection.............

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 6:06am On Mar 20, 2024
Foundation on the other side..........

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 7:18am On Mar 27, 2024
Electrical pipes and other fittings for this basement decking already supplied...........

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 7:21am On Mar 27, 2024
Iron reinforcement works for the slab, staircase preparation and other works completed.............

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 2:59pm On Mar 28, 2024
We have started the concrete cast for the decking.............

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by horlabiyi(m): 3:18pm On Mar 28, 2024
This is massive.
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by michlins(m): 3:44pm On Mar 28, 2024
horlabiyi:
This is massive.
by a large extent oh
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by Badgers14: 3:52pm On Mar 28, 2024
spyder880:
We have started the concrete cast for the decking.............
Wehdone oga spyder880, I am just curious.. I have seen some building projects where the stairs were casted first before the decking and I have seen projects also where it's vice versa.

Which of the 2 options is recommended?
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 3:57pm On Mar 28, 2024
Badgers14:
Wehdone oga spyder880, I am just curious.. I have seen some building projects where the stairs were casted first before the decking and I have seen projects also where it's vice versa.

Which of the 2 options is recommended?
Where it is possible because of the design and the cost, doing the stairs last is better. This is because the stairs will have more time to cure and get ready for use, as against the system of casting stairs first. There may not be enough time left for concrete curing before the stairs will go into heavy use.
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 4:00pm On Mar 28, 2024
Completing the decking cast of the basement flat, moving to cast the DPC of the other side now.............

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 5:39pm On Mar 28, 2024
Buying more materials for the next stages..............

Cement, sand, chippings coming in.

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 5:42pm On Mar 28, 2024
More.........

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by Badgers14: 6:51pm On Mar 28, 2024
spyder880:
Where it is possible because of the design and the cost, doing the stairs last is better. This is because the stairs will have more time to cure and get ready for use, as against the system of casting stairs first. There may not be enough time left for concrete curing before the stairs will go into heavy use.
That's what my thoughts were but wanted to confirm from experts..
Thanks for the enlightenment.
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 9:48am On Mar 31, 2024
We have been making a lot of blocks in the past weeks, by this week, we shall be laying a lot of blocks for the first floor walls................