Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project - Politics (3) - Nairaland

Nairaland Forum / Nairaland / General / Politics / Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project (10318 Views)

Just Landed In Gombe, Is This A Wedding Or Rally? - Atiku Asks / Peter Obi Congratulates Atiku, Asks God To Bless Him / Coronavirus: Atiku Asks FG To Pay N10,000 To Each Household, As He Donates N50M (2) (3) (4)

(1) (2) (3) (4) (Reply) (Go Down)

Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Metordman: 8:12pm On Apr 10
PandoraObi:
Atiku is just bitter he didn't get the chance to bid for the project
u get sense atal, ABI Dem add bleach join us brain
Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Kukutenla: 8:13pm On Apr 10
fuckJones:
Imagine slow S£X, deep kiss!ng, heavy rain, cool music, no cond0m
Imagine a baby after nine months

1 Like

Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by poseidon12: 8:14pm On Apr 10
jconsulting:
Atiku should relax and try his luck in 2027, during PDP era that they privatized government companies were they transparent about it.

Another retrogressive character.
Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Iamanoited: 8:37pm On Apr 10
REVIVE PDP PLEASE.
Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Tradepunter2: 8:49pm On Apr 10
jconsulting:
Atiku should relax and try his luck in 2027, during PDP era that they privatized government companies were they transparent about it.

Another ode defending nonsense...... Keep rubbish with you stupid gaslighting
Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by fredoooooo: 8:49pm On Apr 10
Abi werey latiku ni .. people like Atiku dey talk of transparency..
Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Winning123: 8:51pm On Apr 10
Ofunaofu:
The Lagos-Calabar Highway is Tinubu's project.

He will rather die than reveal the cost of the project.

Tinubu, shady, and dubious deals are like 5 and 6. There's nothing like transparency and accountability when Tinubu is involved. He is a notorious drug dealer, for Pete's sake.

The money from this contract will be used to finance the 2027 election. 

Construction firms are Nigeria's biggest money launderers. It is the reason contract figures are inflated; some, like the Lagos-Calabar Highway, are shrouded in secrecy because they are avenues where government officials launder public funds.

You will wail and wait tire like Atiku. Enemies of progress.

1 Like 1 Share

Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Winning123: 8:53pm On Apr 10
Metordman:
u get sense atal, ABI Dem add bleach join us brain

That question is for you.

1 Like 1 Share

Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by MuslimIgbo: 8:53pm On Apr 10
fuckJones:
Imagine slow S£X, deep kiss!ng, heavy rain, cool music, no cond0m
Yes, it'll be very sweet, but add herpes, HIV and hepatitis cool

Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by tegrianonigltd(m): 8:54pm On Apr 10
PandoraObi:
Atiku is just bitter he didn't get the chance to bid for the project

Wow?? Politics for Nigeria no be politics, them no born abroad politics not to give account. lol 😂 see una dey, so divided in everything. There are some things you can be divided, some things stand in. This one stand in. It’s your fvcking right. Taxpayers money.
Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by kmonies: 8:56pm On Apr 10
if seun refuse to control Nairalanders who are insulting the president because their kinsmen didn't win election he might be the looser because one day this platform will definitely be shut down.

1 Like 1 Share

Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Ofunaofu: 9:01pm On Apr 10
Winning123:


You will wail and wait tire like Atiku. Enemies of progress.

If you see those who benefit from corruption and state graft, you will surely know.
Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by IamCookie(f): 9:01pm On Apr 10
Did anyone catch this :-

Minister of works live on TVC explaining the Costal Road project

Minister summary on coastal road project Lagos to Calabar
1. Project longtivity 8yrs
2. Cost is 4 billion per km and not 8 billion as claimed by Atiku
3. ITEC is more pronounced when it comes to concrete roads. Hence, they were awarded the project .
4. 10 lanes concrete road with railway suitated in the middle.
5. Toll fare will be introduced to last at least 50 years.
6. Govt to pay 15% of the project cost.
7. Contract negotiated downwards from 12trillion to 11.2trillion.
8. New designs were introduced from the existing plans.
9. Minister will visit landmark tomorrow for a meeting even though they have encroached beyond what was approved.
10. Many bridges were also introduced.

Cc: @ofunaofu
Lycopee

2 Likes 1 Share

Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Vulcan24(m): 9:03pm On Apr 10
Be a friend of a rich man, whether he gives or do t give u, u will attract favours from his likes!

We should have voted in this man
Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Kay25(m): 9:05pm On Apr 10
Ofunaofu:
The Lagos-Calabar Highway is Tinubu's project.

He will rather die than reveal the cost of the project.

Tinubu, shady, and dubious deals are like 5 and 6. There's nothing like transparency and accountability when Tinubu is involved. He is a notorious drug dealer, for Pete's sake.

The money from this contract will be used to finance the 2027 election. 

Construction firms are Nigeria's biggest money launderers. It is the reason contract figures are inflated; some, like the Lagos-Calabar Highway, are shrouded in secrecy because they are avenues where government officials launder public funds.
I think the day u start seeing positivity to things u will sound better and not bitter 2023 election is gone forget your loss and move on all this will just give u BP and die before next election while bat will win again den u be dancing palongo in ur grave in bitterness calm down u hear

1 Like 1 Share

Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by PHAYOL81: 9:29pm On Apr 10
Atiku pretending he cares about Nigerians from his Dubai luxurious home procured and continued to be funded from looted funds from the common wealth. SMH

1 Like 1 Share

Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Bluntemperor: 9:36pm On Apr 10
Atiku should go and rest because when your PDP Party was there for 16- years,with no single Infrastructure,so what happens to all the Budgets for those 16- years?
Which shows ,you are not going to change but now,a Party is doing what you failed to do but you are just looking for excuses ,as an attackc

1 Like

Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Bluntemperor: 9:41pm On Apr 10
kmonies:
if seun refuse to control Nairalanders who are insulting the president because their kinsmen didn't win election he might be the looser because one day this platform will definitely be shut down.

True talk!
Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Good2go1: 9:45pm On Apr 10
Was it not the same Yoruba Muslims that defended Buhari when he initiated the project calling sane Nigerians children of hate?
skj1377:
Presidency will have to answer the questions. But was it not a similar Northern president that approved rail way to Niger republic Of what benefit was it to people of Nigeria. This project is within Nigeria and will benefit Nigerians.
Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Ofunaofu: 9:49pm On Apr 10
Kay25:

I think the day u start seeing positivity to things u will sound better and not bitter 2023 election is gone forget your loss and move on all this will just give u BP and die before next election while bat will win again den u be dancing palongo in ur grave in bitterness calm down u hear

You are actually the one who needs this advice the most.

Because of bigotry, you now see every constructive criticism against Tinubu through the prism of bitterness.
Emancipate yourself from ethnic and tribal bigotry and watch your life blossom. 

This bigotry you display will surely send you down six feet below
Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by professorPABX: 10:11pm On Apr 10
Morbeta11=129369129:


Atiku through Paul Ibe recalled that the Goodluck Jonathan administration had in November 2014 the contract for the same 10-state, 22-station project with China Civil Engineering Construction Corporation (CCECC) at a cost of $11.97 billion.

Noting that the administration left office before it could implement it, Atiku said that the succeeding administration of President Muhammadu Buhari had reviewed it downwards by $800 million to $11.1 billion with a three year completion period even though it continued to stall.

t/

Atiku is a fraud. The above is the first statement he made before Bayo Onanuga exposed his folly and ignorance. Onanuga reminded him the coastal highway project has never been awarded. It is only Coastal railway project that was awarded and Jonathan and Buhari are still alive for verification. Now, he seems to have woken up from slumber to admit his folly and ignorance on the figures he earlier released.

Few days after Senator Ningi's allegation of double budget by the presidency and the foolish diversion to an irrelevant budget padding by OBI people, on social media and later on nairaland, I said the real reason for Ningi's outburst was the Lagos Calabar Highway Project announced by Dave Umahi. Many of us had expected such outburst but not too soon.

The points raised by Atiku in this second attack on the project are as foolish as the first one. I will wait for Umahi responses on figures before mine. He expected the whole 700Km to be funded by PPP. This is a project that has been on ground for decades . I remembered it was one of the projects ABIOLA wanted to execute if elected. They killed ABIOLA and killed the project. When the Federal Roads were tolled , how many toll gates do they placed on the roads in the North compared to the ones in the South especially South West?

Lagos to Ibadan around 150km was awarded to Bi-Courtney on PPP by OBJ , for 7 years he could not raise funds because of how FG scuttled agreement at MM2 after OBJ left. Nobody can award Abuja to Kaduna or Abuja to Kano on PPP but Atiku expects companies to execute the whole 700km Lagos Calabar Highway Project on PPP.

Atiku now remember the economy is bad to Undertake Coastal Highway Project but when Buhari was taking loans for Ajaokuta Kaduna Kano pipeline project Niger Republic rail and others he never made comments. All the money spent to prospect for oil in the North for 4 decades are not subject to public debate but no outcry.

Based on what I heard Dave Umahi never said HITECH is the sole contractor, he never said everything would be concrete. He said the jobs would be executed section by section. It is the Atlantic City, Lekki Deep Seaport and access route to Dangote Refineries that created economic exigencies and necessities for first section.

Which competitive bidding was carried out for INTEL Logistics deals at the Seaports during Obasanjo and Yaradua Jonathan government? The money Atiku made at the Seaports is more than the money required to complete the Lagos Calabar Highway Project.

All defence contracts, Security Contracts, Attorney General deals, petroleum (oilfields/crude oil) and Maritime deals which they use to impoverished Nigeria are well known to him but because it concerns projects that affected VI/Lekki/Ajah which they expected would be submerged by Atlantic Ocean but which by Mercy of God and Courage of Tinubu survived they are now attacking the project.

3 Likes 1 Share

Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Kay25(m): 10:17pm On Apr 10
Ofunaofu:


You are actually the one who needs this advice the most.

Because of bigotry, you now see every constructive criticism against Tinubu through the prism of bitterness.
Emancipate yourself from ethnic and tribal bigotry and watch your life blossom. 

This bigotry you display will surely send you down six feet below
Oh what u wrote is not constructive criticism is a bile of hatred and loss u spilling out

1 Like 1 Share

Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by professorPABX: 10:43pm On Apr 10
Ofunaofu:
The Lagos-Calabar Highway is Tinubu's project.

He will rather die than reveal the cost of the project.

Tinubu, shady, and dubious deals are like 5 and 6. There's nothing like transparency and accountability when Tinubu is involved. He is a notorious drug dealer, for Pete's sake.

The money from this contract will be used to finance the 2027 election. 

Construction firms are Nigeria's biggest money launderers. It is the reason contract figures are inflated; some, like the Lagos-Calabar Highway, are shrouded in secrecy because they are avenues where government officials launder public funds.

OBI man, it is the IBOs that will suffer at the end.

Atiku is a fraud. The above is the first statement he made before Bayo Onanuga exposed his folly and ignorance. Onanuga reminded him the coastal highway project has never been awarded. It is only Coastal railway project that was awarded and Jonathan and Buhari are still alive for verification. Now, he seems to have woken up from slumber to admit his folly and ignorance on the figures he earlier released.

Few days after Senator Ningi's allegation of double budget by the presidency and the foolish diversion to an irrelevant budget padding by OBI people, on social media and later on nairaland, I said the real reason for Ningi's outburst was the Lagos Calabar Highway Project announced by Dave Umahi. Many of us had expected such outburst but not too soon.

The points raised by Atiku in this second attack on the project are as foolish as the first one. I will wait for Umahi responses on figures before mine. He expected the whole 700Km to be funded by PPP. This is a project that has been on ground for decades . I remembered it was one of the projects ABIOLA wanted to execute if elected. They killed ABIOLA and killed the project. When the Federal Roads were tolled , how many toll gates do they placed on the roads in the North compared to the ones in the South especially South West?

Lagos to Ibadan around 150km was awarded to Bi-Courtney on PPP by OBJ , for 7 years he could not raise funds because of how FG scuttled agreement at MM2 after OBJ left. Nobody can award Abuja to Kaduna or Abuja to Kano on PPP but Atiku expects companies to execute the whole 700km Lagos Calabar Highway Project on PPP.

Atiku now remember the economy is bad to Undertake Coastal Highway Project but when Buhari was taking loans for Ajaokuta Kaduna Kano pipeline project Niger Republic rail and others he never made comments. All the money spent to prospect for oil in the North for 4 decades are not subject to public debate but no outcry.

Based on what I heard Dave Umahi never said HITECH is the sole contractor, he never said everything would be concrete. He said the jobs would be executed section by section. It is the Atlantic City, Lekki Deep Seaport and access route to Dangote Refineries that created economic exigencies and necessities for first section.

Which competitive bidding was carried out for INTEL Logistics deals at the Seaports during Obasanjo and Yaradua Jonathan government? The money Atiku made at the Seaports is more than the money required to complete the Lagos Calabar Highway Project.

2 Likes 2 Shares

Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by gigabyte13: 10:43pm On Apr 10
E be like Tinubu no give Atiku man dis contract oooooooooooo
Atiku no something we don't know
Dis one wey Atiku wan no by force by fire
E be like e don calculate him own share inside before Dem divert the work give another person.....
Atiku
Atiku
Atiku
The president Nigeria will never ever have

1 Like 1 Share

Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Forkthiefnubu: 10:47pm On Apr 10
PandoraObi:
Atiku is just bitter he didn't get the chance to bid for the project
How do u stay alive ?
Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Ofunaofu: 10:50pm On Apr 10
professorPABX:


OBI man, it is the IBOs that will suffer at the end.

Atiku is a fraud. The above is the first statement he made before Bayo Onanuga exposed his folly and ignorance. Onanuga reminded him the coastal highway project has never been awarded. It is only Coastal railway project that was awarded and Jonathan and Buhari are still alive for verification. Now, he seems to have woken up from slumber to admit his folly and ignorance on the figures he earlier released.

Few days after Senator Ningi's allegation of double budget by the presidency and the foolish diversion to an irrelevant budget padding by OBI people, on social media and later on nairaland, I said the real reason for Ningi's outburst was the Lagos Calabar Highway Project announced by Dave Umahi. Many of us had expected such outburst but not too soon.

The points raised by Atiku in this second attack on the project are as foolish as the first one. I will wait for Umahi responses on figures before mine. He expected the whole 700Km to be funded by PPP. This is a project that has been on ground for decades . I remembered it was one of the projects ABIOLA wanted to execute if elected. They killed ABIOLA and killed the project. When the Federal Roads were tolled , how many toll gates do they placed on the roads in the North compared to the ones in the South especially South West?

Lagos to Ibadan around 150km was awarded to Bi-Courtney on PPP by OBJ , for 7 years he could not raise funds because of how FG scuttled agreement at MM2 after OBJ left. Nobody can award Abuja to Kaduna or Abuja to Kano on PPP but Atiku expects companies to execute the whole 700km Lagos Calabar Highway Project on PPP.

Atiku now remember the economy is bad to Undertake Coastal Highway Project but when Buhari was taking loans for Ajaokuta Kaduna Kano pipeline project Niger Republic rail and others he never made comments. All the money spent to prospect for oil in the North for 4 decades are not subject to public debate but no outcry.

Based on what I heard Dave Umahi never said HITECH is the sole contractor, he never said everything would be concrete. He said the jobs would be executed section by section. It is the Atlantic City, Lekki Deep Seaport and access route to Dangote Refineries that created economic exigencies and necessities for first section.

Which competitive bidding was carried out for INTEL Logistics deals at the Seaports during Obasanjo and Yaradua Jonathan government? The money Atiku made at the Seaports is more than the money required to complete the Lagos Calabar Highway Project.

The bold statement has cast you out as an ethnic and tribal bigot.

Must you view every constructive and honest criticism against the Tinubu administration from the prism of ethnicity and tribe.

Emancipate yourself from ethnic and tribal bigotry, and I promise you, you will reason properly, live well, and be happy.
Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by blacknp(m): 10:51pm On Apr 10
Ofunaofu:
The Lagos-Calabar Highway is Tinubu's project.

He will rather die than reveal the cost of the project.

Tinubu, shady, and dubious deals are like 5 and 6. There's nothing like transparency and accountability when Tinubu is involved. He is a notorious drug dealer, for Pete's sake.

The money from this contract will be used to finance the 2027 election. 

Construction firms are Nigeria's biggest money launderers. It is the reason contract figures are inflated; some, like the Lagos-Calabar Highway, are shrouded in secrecy because they are avenues where government officials launder public funds.
Incoherent Wailer.

1 Like 1 Share

Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by professorPABX: 11:06pm On Apr 10
Ofunaofu:


The bold statement has cast you out as an ethnic and tribal bigot.

Must you view every constructive and honest criticism against the Tinubu administration from the prism of ethnicity and tribe.

Emancipate yourself from ethnic and tribal bigotry, and I promise you, you will reason properly, live well, and be happy. 

I said what you bolded out of sympathy. I spent 6yrs at a Federal University in IBO land several years ago and visit IBO land very often and nothing has changed. Yorubas remain the most liberal major ethnic tribe in Nigeria.

Atiku does not have constructive criticism on projects where he is milking Nigeria dry. Where his people are milking Nigeria he has no constructive criticism. If Tinubu awards highway project and rail line to Cameroon he will not say anything.

Defence contracts, Security Contracts, Attorney General deals and petroleum (oilfields/crude oil) and Maritime deals which they use to impoverished Nigeria are well known to him, he keeps quiet because he believes they own Nigeria but because it concerns projects that affected VI/Lekki/Ajah which they expected would be submerged by Atlantic Ocean but which by Mercy of God and Courage of Tinubu survived they are now attacking the project.

2 Likes 1 Share

Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Riskymarvelous(m): 11:08pm On Apr 10
Atiku know am when Dem dey primary school he know say him be anini or oyenusi
Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by Prince111111: 11:09pm On Apr 10
PandoraObi:
Atiku is just bitter he didn't get the chance to bid for the project
I want to assume you are a youth if not 30+, then you should be around 40+ or even as young as 20+. However and whichever party affiliation you are, your instinct should tell you that questions must be asked if we see figures like this from our leaders. Things like these should not be hidden from the public. Atiku said this and you said he is pained. For what reason should he be pained? Do you even know this Man financial capacity? Nawa ooo
Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by EzeChukwuIgbo: 11:59pm On Apr 10
Metordman:
u get sense atal, ABI Dem add bleach join us brain
This is what you tell your mother, charity begins at home
Re: Again, Atiku Asks Tinubu To Reveal Full Cost Of Lagos-calabar Highway Project by EzeChukwuIgbo: 12:02am On Apr 11
poseidon12:


So says one of the retrogressive characters keeping Nigeria backwards. Atiku and Obi are playing their roles well as members of the opposition.
retrogressive characters, your family members are where you left them, they are not here

1 Like 1 Share

(1) (2) (3) (4) (Reply)

What Does Nigeria Contribute To The World? / Lalong Calls For Return Of Checkpoints In Plateau State / 'God Answers Prayers Faster In Ogun State' - Governor Amosun

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 74
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.