₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,346,701 members, 8,524,704 topics. Date: Wednesday, 25 November 2026 at 11:06 AM

Toggle theme

Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha - Properties (6) - Nairaland

Nairaland Forum › Nairaland General › Properties › Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha (13574 Views)

1 2 3 4 5 6 7 8 9 Reply (Go Down)

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 12:12pm On Jun 01, 2024
Work still going on...............

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 12:14pm On Jun 01, 2024
Block walls formation on the second floor...........

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 8:31pm On Jun 05, 2024
More works going on at this site today...........

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 10:21pm On Jun 05, 2024
Inside the flats...........

Work is going on..

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 10:39am On Jun 07, 2024
Preparations for columns and lintels reinforcement works..............

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op):
More pictures of this ongoing work.........

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 2:06pm On Jun 07, 2024
More..........

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 8:47pm On Jun 13, 2024
Lintel reinforcement works completed in this house.............

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by mekussa(m): 4:22am On Jun 14, 2024
How do you manage the iron rods considering the fact that the bulk of what's in the market today is substandard? eg10mm rods that end up being 8.5mm when measured.

Example,using,say,an 8.5mm rod instead of a 10mm rod as reinforcement in a load bearing column is less than ideal but being that that's what you get in the market,how do you get around this? getting a bigger diameter rod or are there specific trusted products available in the market?
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 6:02pm On Jun 14, 2024
mekussa:
How do you manage the iron rods considering the fact that the bulk of what's in the market today is substandard? eg10mm rods that end up being 8.5mm when measured.

Example,using,say,an 8.5mm rod instead of a 10mm rod as reinforcement in a load bearing column is less than ideal but being that that's what you get in the market,how do you get around this? getting a bigger diameter rod or are there specific trusted products available in the market?
The complete gauge rods are still there in the markets, only more costly. In this type of work, we make sure to use complete gauge materials. Welcome.
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 6:05pm On Jun 14, 2024
More pictures...........

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 6:09pm On Jun 14, 2024
Still more pictures from this site...........

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by horlabiyi(m): 5:42pm On Jun 15, 2024
My Oga I don come again ooo. We are moving the plastering level for my building and the bricklayer is telling we are going to use 90-95 bags for both in and out. Is that not too much? Money no dey
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by mekussa(m): 6:40pm On Jun 15, 2024
spyder880:
The complete gauge rods are still there in the markets, only more costly. In this type of work, we make sure to use complete gauge materials. Welcome.
Thanks for the response.
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by Beframia: 7:41pm On Jun 15, 2024
horlabiyi:
My Oga I don come again ooo. We are moving the plastering level for my building and the bricklayer is telling we are going to use 90-95 bags for both in and out. Is that not too much? Money no dey
90-95 bags of cement for a 3-4 b/r bungalow?
That's too much. I plastered a 4 b/r ensuite recently with 68 bags.
Your bricklayer should check well o ... Money no dey.
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 2:41pm On Jun 18, 2024
Beframia:
90-95 bags of cement for a 3-4 b/r bungalow?
That's too much. I plastered a 4 b/r ensuite recently with 68 bags.
Your bricklayer should check well o ... Money no dey.
Plastering dey different o, some people will say plastering, while it will actually include dressing, windows and doors installation and doing all edges.
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by gabbytabby: 9:26am On Jun 19, 2024
Na the full plastering of everywhere and installation of doors, windows and all dressing me I dey do. I no get time for up and down business that is why they are treated as kings breakfast money and full course owambe level food at the end of the day.

I go do roofing up to ceiling before plastering self.

When I tell my agent that house will be ready in 2 months or less after plastering them no they believe until I show them.

It’s good to gather money first and then start to build from start to finish.

spyder880:
Plastering dey different o, some people will say plastering, while it will actually include dressing, windows and doors installation and doing all edges.
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by gabbytabby: 9:44am On Jun 19, 2024
If you are on ground just buy in 10s or 20s and monitor. I never ask for quantity cos it’s not an exact science and my bricklayer is one that wants to aire on the side of caution so he will over estimate. I am better at estimating blocks than him self so I let him concentrate on what he is good at.

That appears too much and plastering get standard some usually the Togo guys will give a light touch and people will say they are fast I would only use them to plaster inside but not outside

Congratulations and Goodluck.

horlabiyi:
My Oga I don come again ooo. We are moving the plastering level for my building and the bricklayer is telling we are going to use 90-95 bags for both in and out. Is that not too much? Money no dey
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 9:47am On Jun 19, 2024
gabbytabby:
If you are on ground just buy in 10s or 20s and monitor. I never ask for quantity cos it’s not an exact science and my bricklayer is one that wants to aire on the side of caution so he will over estimate.

That appears too much and plastering get standard some usually the Togo guys will give a light touch and people will say they are fast I would only use them to plaster inside but not outside

Congratulations and Goodluck.
You said it all, another thing that hlave a say in cement quantity during plastering is the actual sand used. The coarser the sand, the more cement it will take to mix it. Plastering requires clay like sand to reduce cement mix. But you're correct, its not an absolute science.
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 8:48am On Jun 24, 2024
At this ongoing project, we have completed the carpentry works for the lintels and pillars,

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 8:54am On Jun 24, 2024
A view from the top..............

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by Chriswazo(m): 9:57am On Jun 24, 2024
spyder880:
A view from the top..............
Any improvement on cost of materials recently, abandoned project no d gree man sleep with two eyes, oh Lawd huh
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 10:33am On Jun 24, 2024
Chriswazo:
Any improvement on cost of materials recently, abandoned project no d gree man sleep with two eyes, oh Lawd huh
My brother, materials are still on the rise and rise. No hopes of coming down in the near future.
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 11:00am On Jun 24, 2024
Standing at the top, inspecting the areas cast with concrete so far..................

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by michlins(m): 12:33pm On Jun 24, 2024
spyder880:
Standing at the top, inspecting the areas cast with concrete so far..................
the slides are not the recognized footwear.

Godspeed!!!!
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 12:46pm On Jun 24, 2024
michlins:
the slides are not the recognized footwear.

Godspeed!!!!
Dont mind me, I just want to be on easy mood on that day. grin
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 2:56pm On Jul 10, 2024
Just came back from this project. More updates later.
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 6:59pm On Jul 14, 2024
We have returned to this site to start work with the completion of block walls, and doing a new decking at this site..................

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 7:01pm On Jul 14, 2024
Peeling off the decking wood, ready for the next decking starting from tomorrow...........

Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 7:15pm On Jul 14, 2024
Yesterday, we restarted working at this site. Although the bulk of my workers are still on their way, I have made arrangements and brought a load of chippings, cement and sand to the site. I have also paid for iron rods for this next decking. I am expecting more supplies, then the start of the decking platform from Monday morning.

More updates later.
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by michlins(m): 9:00pm On Jul 14, 2024
We're here sir
Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 6:59am On Jul 15, 2024
michlins:
We're here sir
Welcome bro
1 2 3 4 5 6 7 8 9 Reply

5 Bedroom Country Home Design With Basement • For Sale:block Of 4 Flats Of 3 Bedroom Each At Akobo Ojurin Ibadan #pics. N55m • Build And Renovate Your Dream House With A Registered Building Construction Firm • 2 • 3 • 4

Gracias Gardens Scheme 3* Ise Town,ibeju Lekki ..TOTAL PACKAGE IS #1.450M • VATICAN GARDEN ESTATE 2 EMENE ENUGU! • Stubborn Tenants Refuse To Leave And Don't Pay Rent!