| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by whirlwind7(m): 7:52am On Aug 23, 2024 |
Chriswazo:This was near to Owerri. |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by Chriswazo(m): 11:16am On Aug 25, 2024 |
whirlwind7:Ok |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by Chriswazo(m): 11:19am On Aug 25, 2024 |
spyder880:Ken, can u help me with something, I would love to know the price of these materials at this ur site. 16mm 12 mm 8mm 30 tons of granite. Then 9 inches block 6 inches? Thank u, am asking to estimate sth. My site is arọ this location so it will be similar and I can't find out myself cos am not in NG |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 11:25am On Aug 25, 2024 |
Chriswazo:16mm N16,000 12 mm N8,900 8mm N5,000 30 tons of granite. N925,000 Then 9 inches block N600 6 inches? N550 |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 11:28am On Aug 25, 2024*. Modified: 4:51pm On Aug 26, 2024 |
This decking has been drying out, curing as the rains fall for the past weeks.
|
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 11:32am On Aug 25, 2024 |
We have been lifting up blocks from the ground, we are planning to start laying blocks on the top of this deck.................
|
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by Chriswazo(m): 11:37am On Aug 25, 2024 |
spyder880:Thank u bro, this will help. |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 11:39am On Aug 25, 2024 |
Production of more blocks on site for the use on this floor............
|
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 11:42am On Aug 25, 2024 |
Still producing more...........
|
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 11:51am On Aug 25, 2024 |
More blocks, we want to proceed without stopping..................
|
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 4:53pm On Aug 26, 2024 |
Forming the walls of th4 next level..............
|
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by donforeign: 12:54pm On Aug 29, 2024 |
tranxo:the exchange rate no really favour because the higher the rate the more expensive material bro |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by donforeign: 1:20pm On Aug 29, 2024 |
Haaaaa this land dey fear me o. For the owner to build here, it's obvious the area must be expensive. Damn..is the basement of the house half? I am seeing sand in the other side.... Can't even tell the entrance of the house ... I hope there's no erosion in this area..... This is massive.. Spyder u get mind o |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by donforeign: 1:30pm On Sep 10, 2024 |
Which color is good for painting exterior walls and fence of a building oga spyder and colleagues? |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 2:41pm On Sep 10, 2024 |
donforeign:What type of house? How is the street, is it tarred? |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by donforeign: 7:20pm On Sep 12, 2024 |
spyder880:the street is not tarred, a modern house.. |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 8:00pm On Sep 12, 2024 |
donforeign:I was asking if the streed was tarred because as a tropical location, most of Nigerian roads throw up dust when vehicles pass on it if its untarred. Those dust will deface the colour of the painting on a steady basis. To solve that problem, builders plan and use brown coloured, paints or paints in that hue to paint the house if the house is near an untarred road. |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by donforeign: 10:37pm On Sep 12, 2024 |
spyder880:thanks boss. Like dark grey can work ? I can send a picture of the house if need be boss. |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 5:22pm On Sep 13, 2024 |
donforeign:Dark grey has always been a good alternative to brown colour. It can also hide stains and dust, unlike lighter colours like cream, white and others.
|
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by michlins(m): 8:40pm On Sep 13, 2024 |
. |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by kingralph(m): 9:10pm On Sep 16, 2024 |
This is a fine building. |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 12:12pm On Sep 17, 2024 |
kingralph:Thank you very much, we are still working on this building today. |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 9:37am On Sep 21, 2024 |
Work still going on in this house today, more pictures later today............... |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 3:23pm On Sep 22, 2024 |
Work updates from the third floor walls............
|
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 3:35pm On Sep 22, 2024 |
Views from the side of the house................ |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by michlins(m): 6:31pm On Sep 22, 2024 |
spyder880:we're still in the business of making iron works. Doors, railings and tank stand plus others
|
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 6:54pm On Sep 22, 2024 |
More pictures
|
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 6:59pm On Sep 22, 2024*. Modified: 9:22pm On Sep 22, 2024 |
More
|
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 3:10pm On Sep 25, 2024 |
Lintels concrete cast of this floor is completely done............
|
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by donforeign: 9:17am On Sep 28, 2024 |
This building still dey confuse me Sha...from the picture,the first floor is covered by sand or what? I can see windows on the other side of the ground floor and the other side look as if it's covered with sand .. |
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 8:37am On Sep 30, 2024 |
This land is for sale..........
|
| Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 4:26pm On Sep 30, 2024 |
donforeign:The building has a basement flat. 1 flat will be sub level with a decking which will be on the same level as the foundation of the other side. This was caused by the nature of the land which is very sloped.
|
5 Bedroom Country Home Design With Basement • For Sale:block Of 4 Flats Of 3 Bedroom Each At Akobo Ojurin Ibadan #pics. N55m • Build And Renovate Your Dream House With A Registered Building Construction Firm • 2 • 3 • 4
COREN Wants Death Sentence For Owners Of Collapsed Buildings • DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] • Fawehinmi’s Associates Demand Demolition Of Hotel Near Late Legal Luminary’s Hom