₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,329,819 members, 8,442,405 topics. Date: Friday, 10 July 2026 at 07:15 AM

Toggle theme

Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi - Politics - Nairaland

Nairaland ForumNairaland GeneralPoliticsLagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi (9413 Views)

1 2 3 Reply (Go Down)

Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by NewDigitalWorld(op): 5:44pm On Feb 26, 2025
The Minister of Works, David Umahi, has assured that the ambitious 750km Lagos-Calabar Coastal Highway will be completed before the end of President Bola Ahmed Tinubu’s second term in office.

Umahi gave this assurance on Tuesday during the signing of the Engineering, Procurement, Construction, and Finance (EPC+F) contract for the project between the Federal Government and Hitech Construction Company Nigeria Ltd.

According to Umahi, the administration is committed to delivering the mega infrastructure project, which he described as the “biggest ever known in Africa,” within Tinubu’s tenure.

He stressed that the project, envisioned 27 years ago, is now becoming a reality under the Renewed Hope agenda.

“It is a wonderful thing to witness this and to be part of it. We will continue to pray for Mr President, we will continue to support him, and we must continue to say that, given the two tenures of Mr President, Nigerians are assured that the entire 750 kilometres will be fully completed before he leaves office. And God, who started this, will see it to completion,” Umahi stated.

He further explained that the project, initiated in March 2024, is structured under an EPC+F model, allowing Hitech Construction to secure foreign investments in collaboration with the Federal Ministry of Finance.

The Federal Government has committed to providing 30% counterpart funding, while foreign financing will cover the remaining cost.

The first phase of the highway, covering 47.7km from Ahmadu Bello Way in Lagos, is expected to be completed by May 2025. Umahi also disclosed that each kilometre of the road would cost approximately N4 billion.

The minister reiterated the administration’s commitment to fast-tracking the project, ensuring it meets global standards and serves as a catalyst for economic growth along Nigeria’s coastal corridor.

He said, “The beauty of it is that the ‘F’ component of EPC+F is now being fulfilled. By signing this contract, we are paving the way for the contractor, through the Federal Ministry of Finance, to secure foreign investment for the project. The Federal Government’s commitment is 30 per cent counterpart funding, which the President is fulfilling.”

“And now, with the foreign financing component in place, the project’s execution will be accelerated. I am pleased with Hitech’s performance, the quality of work, and the speed of construction. If not for the need to settle a substantial fee, we would have been able to commission the entire first section within a year, even though the project is scheduled for 36 months.”
Source: https://punchng.com/lagos-calabar-highway-to-be-completed-in-tinubus-second-term-umahi/

Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by writetopoker601: 5:47pm On Feb 26, 2025
Is like this Umahi is mad or about to run mad.
What does he mean by the project will be completed in Tinubu's second tenure?

Has he conducted 2027 election or has the 2027 election already been won by Tinubu for Umahi to say the project will be completed by Tinubu's second tenure?

People just make careless comments, that warrants arrest, detention and serious questioning

Mugus
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by SoftSport(m): 5:50pm On Feb 26, 2025
shocked

Sounds like a great project on paper, but with each kilometer costing N4 billion and foreign investors in the mix, you gotta wonder, are we building a highway or a money pipeline for the usual suspects?
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by Mystic216: 5:52pm On Feb 26, 2025
Unserious mofos
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by EyeCumInPeace: 5:54pm On Feb 26, 2025
If you believe this white-elephant project of a coastal highway will be completed before 2031, then you will have no problem believing that Nigeria will be corruption-free by 2031. grin
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by Nobody: 5:56pm On Feb 26, 2025
All these criminals
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by jkpbestseries: 5:57pm On Feb 26, 2025
Very good
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by ambale(m): 6:02pm On Feb 26, 2025
writetopoker601:
Is like this Umahi is mad or about to run mad.
What does he mean by the project will be completed in Tinubu's second tenure?

Has he conducted 2027 election or has the 2027 election already been won by Tinubu for Umahi to say the project will be completed by Tinubu's second tenure?

People just make careless comments, that warrants arrest, detention and serious questioning

Mugus
Tinubu has assembled the entire arrogant politicians in his government

They talk as if no one can even check him

I don't know how a leader will do much care less about his goodwill

Even trump no do reach this one
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by allen113:
Please someone should post pictures of this highway being constructed, I dn tire to they see the same pictures everytime.

diverseconcepts:
5 MONTH AGO.....
Thanks
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by ATEAMS: 6:21pm On Feb 26, 2025
Lol
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by Felabrity: 6:21pm On Feb 26, 2025
That shit is never getting completed
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by Kkingship: 6:21pm On Feb 26, 2025
Ok
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by Vadese1: 6:23pm On Feb 26, 2025
The road was just political. The useless president was never serious for it before
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by MichaelSokoto(m): 6:23pm On Feb 26, 2025
God 4bid BAThin!
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by Habbeyy(m): 6:23pm On Feb 26, 2025
grin be like say them don promise Umahi VP Cuz the way he carry Tinubu second term for head I no understand
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by hafeeanubasy:
This Dave revelation really pained IPOB terrorists,some ATIKU bandits and others gan an ooo


This TINUBU area boys Sabi pepper people.
See them foaming from the mouth 😆
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by Amalekki:
Excellent! With what Umahi has done so far, most of the constituent parts of the road should be usable before 2027.
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by Fiscus105(m):
writetopoker601:
Is like this Umahi is mad or about to run mad.
What does he mean by the project will be completed in Tinubu's second tenure?

Has he conducted 2027 election or has the 2027 election already been won by Tinubu for Umahi to say the project will be completed by Tinubu's second tenure?

People just make careless comments, that warrants arrest, detention and serious questioning

Mugus
I think, you are the IGP that Obi appointed as head of police force for his govt, why can't you help us arrest the careless talker.
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by Melonsmasher: 6:26pm On Feb 26, 2025
Clowns..

And if he loses the second term, the money is gone abi..
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by writetopoker601: 6:27pm On Feb 26, 2025
Fiscus105:
I think you are the IGP that Obi appointed as head of police force his govt, why can't you heplnus arrest the careless talker.
People like you has mental health issues. I will just save my comments
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by 4tomandchi: 6:27pm On Feb 26, 2025
So una get carry over plan. KO Le wek!!!!
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by ivandragon: 6:27pm On Feb 26, 2025
Conduit pipe...
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by affable4(m): 6:29pm On Feb 26, 2025
Always using every available opportunity to hint on election, succession and continuation.

A very election minded minister.
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by Amalekki: 6:29pm On Feb 26, 2025
grin These are experienced politicians. They know how to make the uncouth political illiterates react & do their campaign for them. That's how Obidients helped with last election.


hafeeanubasy:
This Dave revelation really pained IPOB terrorists,some ATIKU bandits and other gan an ooo


This TINUBU area boys Sabi pepper people.
See them foaming from the mouth 😆
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by ogaemma: 6:31pm On Feb 26, 2025
Umahi the dreamer.
Inshallah, there will be no second term for TINUBU.

ENOUGH OF THE SUFFERING.
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by Fiscus105(m):
writetopoker601:
People like you has mental health issues. I will just save my comments
Many of you that come from tiny-assembly, that are weeping and gnashing teeth now, would be the one to use it most wen completed, many of the counterfeit drugs producing in yeast, would be transported fast on the same road, by His grace, your fake drugs would end up in the veins of every dot-national that reside in South West.
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by PHIPEX(m): 6:31pm On Feb 26, 2025
That's another name for abandoned project
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by Blitzerz: 6:31pm On Feb 26, 2025
Scam!
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by TempleHouse: 6:33pm On Feb 26, 2025
Man proposes, God disposes !!
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by Tjra: 6:36pm On Feb 26, 2025
TempleHouse:
Man proposes, God disposes !!
True

May God give Jagaban long life and sound health 🙏

Na God dey run am. Man can't do anything.
Re: Lagos-Calabar Highway To Be Completed In Tinubu’s Second Term — Umahi by treesun: 6:37pm On Feb 26, 2025
God forbid evil things. Thunder will not strike twice!
1 2 3 Reply

Atiku’s Son Defects To APC, Pledges Support For Tinubu’s Second TermWhat Nigerians Think About Tinubu's Second Term EndorsementsWike Inspects FCT Projects For President Tinubu's Second Anniversary234

"My Govt. Can't Solve The Nigeria Problem Of 16 Years In Just 4 Years"-buhariArmy Launches “operation Positive Identification” In North EastNatasha Akpoti: PDP Youths Back Recall, Says It’s Constitutional