Deji Adeleke’s 1250MW Power Plant Set For Commissioning - Politics (3) - Nairaland
Nairaland Forum › Nairaland General › Politics › Deji Adeleke’s 1250MW Power Plant Set For Commissioning (29302 Views)
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by Image123(m): 1:09am On Jul 22, 2025 |
CodeTemplarr:Ahh, and they spent loads of money on this guy's education oh. May you receive healing. |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by CodeTemplarr: 1:10am On Jul 22, 2025 |
Image123:They?? |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by Image123(m): 1:16am On Jul 22, 2025 |
CodeTemplarr:We. |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by es144000: 1:20am On Jul 22, 2025 |
The major problem will be getting gas to fire it. |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by unitysheart(m): 1:40am On Jul 22, 2025 |
SmartPolician:But dem mention gas inside the article. |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by Mirasteel: 3:27am On Jul 22, 2025 |
SmartPolician:The truth is that most of you don't read here |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by Babangidapikin: 3:44am On Jul 22, 2025 |
That is good. At least power generation has improved. |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by stuffs2002: 3:57am On Jul 22, 2025 |
PDPdestroyer:They hate to hear any good news about Nigeria |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by redcliff: 4:08am On Jul 22, 2025 |
Watch networth go off the charts. Rich people know how to create more funds |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by redcliff: 4:09am On Jul 22, 2025 |
PDPdestroyer:Coming from someone that is wishing death on pdp... |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by cardoctor(m): 4:09am On Jul 22, 2025 |
You try |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by profmallor: 5:42am On Jul 22, 2025 |
The powerplant is ready, I am only waiting to be connected to the gas grid to start generating power. That plant will employ over 2,000 engineers and other associated workers,” Adeleke said. SmartPolician: |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by yommen: 6:01am On Jul 22, 2025 |
etrouble:You don't have proofs for your claim. Tinubu has always been open to allow private participation in the power sector. That's the main reason for removing subsidy in the power sector too to allow level-playing ground. Mind you, Obasanjo wouldn't allow individuals to participate during his terms as President. Tinubu as governor even built generation station but Obasanjo didn't allow it to operate until Lagos accepted to sell only to the national grid. However Lagos sold to national grid but Obasanjo never remitted any money to Lagos state. |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by Bellotelli: 6:23am On Jul 22, 2025 |
SmartPolician:Read carefully and see where he said that they will soon integrate the gas component. |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by Sirtee19: 6:30am On Jul 22, 2025 |
This is highly commendable. But the poster of this news make a slight error. Ajebandele is in ilé ifẹ̀(Ibadan road, after OAU), Osun State, not in Ondo State |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by Elderniercri(m): 6:31am On Jul 22, 2025 |
SmartPolician:I think its source of energy is gas. Most of the newer plants build have been using gas and so there’s going to be a supply problem ahead. It’s one of the major headache for Edo State owned plant where shortage of gas meant there’s no electricity in government buildings. But it’s also more reliable. I wish they don’t have to connect to the national grid though. |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by Onewazobia(m): 6:39am On Jul 22, 2025 |
SmartPolician:Haha boss didn't you read "gas Grid" That means it's gas powered turbines
|
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by jamafa: 7:00am On Jul 22, 2025 |
greenermodels:You are just saying rubbish 😂 On DX trend(Nairaland) how many people have given Tinubu glory for it?? You just dislike the man for no reason |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by emirate9: 7:30am On Jul 22, 2025 |
seunowa:How on earth is 2027 election sure for Tinubu ... squarely on performance. pre-Tpain era he won by few majority how much more now we all have seen he is clueless nd unserious Most of you asserting Tinubu will win 2027 are not basing it on the " people's vote' instead you guyz trust Tinubu's crookedness to maneuver and rig the election. Audacious moves that are limited to scrambling what Nigerians are benefiting from,. why is Tinubu Audacious moves not extended to implementing the Oransanye report, why not prosecute n jail corrupt politicians |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by peleson1: 8:06am On Jul 22, 2025 |
SmartPolician:If you are an engineer you would understand that it was stated there. It's gas |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by faoogoke(m): 8:15am On Jul 22, 2025 |
SmartPolician:It boils down to lazy journalism. Building a power plant of such magnitude is not easy. I doubt the capacity as touted. Maybe the owner is doing publicity however reporting journalist should also investigate. The picture shown is also not probably that of the power plant. |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by Banhammy717: 8:48am On Jul 22, 2025 |
If Tinubu can make the environment conducive for private individuals to fully participate in power generation, transmission and distribution, and fix the power problems, I will vote for him 10 more times because our major economic problem is this epileptic power supply. Obasanjo and Atiku spent $16b to fix this problem, still Obasanjo himself is still using power bank. God Bless Nigeria |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by seunowa(f): 8:52am On Jul 22, 2025 |
emirate9:Well you don't really know much. Ask your Atiku or obi , how they are going to fix Nigeria... |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by Faposky95: 9:02am On Jul 22, 2025 |
All hail.the Liseobin1 of Nairaland |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by Eriokanmi: 9:06am On Jul 22, 2025 |
TimeManager:This has nothing to do with jagaban. Did you know when this project actually started? |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by CHAQUR: 9:11am On Jul 22, 2025 |
Tinubu will never be loved from the other side... They strive from importation while Tinubu is drifting the country towards self reliance. A step to take for the country's greatness but at the same time, a step on the toes of many citizens who have been striving on things that have kept the country stagnant for years. Dangote refines fuel for local use, Adeleke to give light for local use, is it that there is nothing to be contributed from the other side but assembly plants for imported materials and a shayo brewery...? |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by qtx(m): 9:46am On Jul 22, 2025 |
TimeManager:I admire his determination. However, our problem, from the little I know, has never been generation but distribution. Someone correct me if I am wrong. |
| Re: Deji Adeleke’s 1250MW Power Plant Set For Commissioning by mctech(m): 10:06am On Jul 22, 2025 |
Instead of feeding it into the national grid, Ondo state should establish an industrial estate or free trade zone near it to take power therefrom. |
Imo State $4.2 Billion Gas Plant Set For Commissioning • Wike Invites Peter Obi For Commissioning Of Flyover In Rivers State (Photo) • Deji Adeleke To Brother Ademola: I Will Expose You If You Derail As Governor • 2 • 3 • 4
Famous Bandit On Tiktok Arrested • Patience & Goodluck Jonathan Visit Eruani (Photos) • Lady Protests In Akwa Ibom Over Buhari's Failure To Probe Akpabio (Pics)