| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 6:14am On Sep 12, 2025 |
We have started working on the electrical piping provisions for this house, more updates later today.................. |
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 6:18am On Sep 12, 2025 |
We have reinforced the staircase at the back of the house...............
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 6:20pm On Sep 13, 2025 |
Today we're baking biscuits at this site ............... ![]()
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 6:23pm On Sep 13, 2025 |
I mean concrete biscuits o, before people will start feeling hungry here. We usually prepare a cement sand mix to prepare some decking top separator to lift the iron mat from the decking floor, so that we can pass electrical conduit piping materials below the iron mat.
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 6:31pm On Sep 13, 2025 |
We're starting to make provisions for wall electrical fittings, sockets, switches and lights..............
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 6:48pm On Sep 13, 2025 |
Starting the reinforcement works for the curved staircase area......................
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 1:49pm On Sep 15, 2025*. Modified: 2:11pm On Sep 15, 2025 |
The completed curved staircase reinforcement................
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 2:13pm On Sep 15, 2025 |
Getting all works completed, in preparation for the decking slab cast...............
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 2:17pm On Sep 15, 2025 |
Front balcony cantilever.................. Side balcony cantilever Open air main living room
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 2:21pm On Sep 15, 2025*. Modified: 3:04pm On Sep 16, 2025 |
Front elevation from outside the fence |
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 3:05pm On Sep 16, 2025 |
Front of this house
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 5:01pm On Sep 16, 2025 |
Making the staircase of this house...............
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 2:00pm On Sep 17, 2025 |
We have been preparing for this decking cast which will come up soon, talking with labourers right now. |
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 4:05pm On Sep 19, 2025 |
A closer look at the finish of our curved staircase, showing the step threads and riser design, with the electrical lighting arrangements.........
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 4:10pm On Sep 19, 2025 |
The other staircase off the central lobby deep inside this house................
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 4:16pm On Sep 19, 2025 |
Before I start showing other parts of this decking slab preparations, we have to look at this temporary staircase. This staircase is made of only wood and bamboo, and will be used to ferry concrete from the ground where its mixed to the decking floor where it will be cast. After this concrete cast, we might just dismantle this particular temporary staircase.
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 10:03am On Sep 21, 2025 |
In home building construction, people get confused with different technical terminologies being used by industry professionals to describe different types of the work. Since its not everyone that underwent training in construction engineering, a need therefore arises to explain some of the technical terms we might meet in home construction. This is why we are going to look at the term “decking”, and explain what it's all about. A decking, which could be described by insiders in the building industry as the suspended slab, is a platform built to hang on top of a building ground floor unit, and therefore forms the floor for the upper unit of a building. Usually, steps are created so that occupants of this upper unit can climb up to a decking, and so enter a higher floor of the same building. There are many materials that could be used to create a decking platform. Engineers have used metal sheets, aluminum form work, hard wood timber, concrete, synthetic fibres and thick plywood boards to create different shapes and sizes of decking for use in different types of buildings. For the sake of this write up, we are going to be focusing our attention on the concrete decking slab. The concrete decking slab is made when the objective of the deck is durability and safety. Among other types of decking materials, the concrete is among the most reliable, it could last for very long, even up to hundreds of years. In buildings where fire could be a risk, the concrete deck could be relied upon as compared to wood or plywood. The concrete deck also fits well on buildings especially those started with concrete columns and beams. The concrete beam is always reinforced with good quality metal bars (iron rods). The specifications of the rods that should work in any decking slab should be detailed by a qualified building professional, specified in the building plans and approved by the state or local authorities to ensure compliance to existing building codes. There are so many types of iron bars for different decking slabs, there is the 25mm, 20mm, 16mm, 12mm, 10mm, 8mm etc. These iron rods are used in a pre planned combination suited for the project, as stated in the building plans. Other important uses of the decking is that the electrical or mechanical piping works on a floor can be passed inside the decking. Electrical pipes of between 20mm to 25mm are usually run within the decking slab, providing electrical wiring provisions where wires and cables could be passed from room to room in a building project. Same applies to the water pipes, or even waste pipes. There are also specifications on the thickness of the slab. The thickness planned for a decking slab has a lot to do with the intended use of the decking slab. There are slabs for residential buildings and there are slabs for commercial buildings like shops and plazas. Since shops and plazas may contain live loads like heavy goods and equipment stacked on the floors, its important to plan for theis extra weight, especially during the planning of the building. In concrete decking slabs, the thickness can range from 125mm to even 300mm thick, depending on what it was planned for. The mixing ratio for the materials that will be used to cast a concrete decking should also be well planned and specified in the building plan documents. Clear specifications should be stated for the mixing ratio of sand and aggregates like granite, gravel and for cement. Care should be taken to ensure a superb mix for the decking slab concrete, a good concrete mixing machine is advised where it is available. A concrete tool which shakes the concrete (poker) is also a very useful tool to ensure the efficiency of the decking process. The above shown pictures are of an ongoing decking slab project wea are still working on, we have started and completed more than 130 different decking slabs in different locations in Nigeria, for more questions and inquiry, call Kenneth on 08033350750. |
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 7:38am On Sep 22, 2025 |
The concrete cast of this decking slab will be started today. More updates later. |
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 6:36am On Sep 23, 2025 |
Our concrete shaking machine arrives at this site...................
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 6:39am On Sep 23, 2025*. Modified: 9:43am On Sep 23, 2025 |
We normally use it to vibrate loose concrete to settle down into decking beam lines, and make for a more compact cast................
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 9:44am On Sep 23, 2025*. Modified: 8:59am On Sep 27, 2025 |
Getting ready for the start today, its been raining all morning, which on its own is a welcome development. Rain and completed concrete cast are a perfect combination. |
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 7:23am On Sep 26, 2025 |
We had completed the whole of this decking cast. More picture updates of the look of the decking later today. .......... |
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 12:47pm On Sep 26, 2025 |
Casting the floor proper .............
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 12:49pm On Sep 26, 2025 |
Covering the floor with concrete................
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 12:56pm On Sep 26, 2025 |
Eventually, we completed all of the decking cast ...................
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 1:00pm On Sep 26, 2025 |
More ............
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 1:03pm On Sep 26, 2025*. Modified: 6:52am On Sep 27, 2025 |
A look at the completed back staircase.................
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 8:50am On Sep 27, 2025 |
A look at the completed curling staircase..................
|
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 7:25pm On Sep 28, 2025 |
This freshly cast decking slab is still curing, water being poured on the decking top is a very good treatment for the curing process, but since we are in the rainy season, rainfall is constant, so we will relax and wait. We plan to return and start work in a few weeks time. |
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 7:24am On Oct 01, 2025 |
Very soon, we will start moving to stock this site with materials needed to build the upper floor of this building. More updates later.............................. |
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 9:46am On Oct 07, 2025 |
I plan to pay an inspection visit to this site later today.................. |
| Re: The Making Of The "Fabulous" 6 Bedroom Duplex In Enugu by spyder880(op): 5:48pm On Oct 14, 2025 |
After waiting for some time for the decking to cure, we plan to start working on the upper floor by Monday next week. We plan to start moving men and materials to this building site as from this weekend. More pictures from this site when we start. |