Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway - Travel (2) - Nairaland
Nairaland Forum › Nairaland General › Travel › Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway (18890 Views)
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by planetx: 6:01pm On Oct 02, 2025 |
Nothing special about this road to justify the amount supposedly being spent on it, this is an overinflated very corruption laden project meant to siphon our resources. |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by CodeTemplarr: 6:01pm On Oct 02, 2025 |
Where are the extremists always shouting "churches should build factories"? |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by yemre: 6:02pm On Oct 02, 2025 |
mascot87:Please let them be. Ignorance is a real disease! The master plan you made mention of made no sense to them. Whether they like it or not, Lagos - Calabar coastal highway will be completed on schedule! It will be tolled, we will pay and we will use the road. Whoever doesn't want can go through their usual 13hour route. It's nobody's business! |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by DeepSight(m): 6:02pm On Oct 02, 2025 |
mascot87:How shameful. How pitiful. How disgraceful. |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by FarahAideed: 6:02pm On Oct 02, 2025 |
Lol they are still pretending they are building coastal road 😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂 |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by DeepSight(m): 6:03pm On Oct 02, 2025 |
yemre:The analogy of the frog getting cooked in slowly boiling water comes to mind when one sees citizens like you. |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by buckeyemedia: 6:03pm On Oct 02, 2025 |
WorldRichest:Please give them givedemwotowoto. |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by grandstar(m): 6:03pm On Oct 02, 2025 |
One of the projects Tinubu wants to use to win the next election. Today, rigging alone can't guarantee you a win. Your perceived performance is much more important today. |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by igatit: 6:05pm On Oct 02, 2025 |
Believe these thieves at your peril. hahahahaha more points remaining...... |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by DomPerignon: 6:08pm On Oct 02, 2025 |
Tareq1105:Their problem is that they see this highway as an intrusion into their colonial handed down heritage which is the SS. They see this project as a connecting bridge between the SW and SS. They are also against it because it will bring development to what they see as their future reservations in their deluded Biafra. Also they have always been against any project or developmental stride of the SS. They have been the biggest problem afflicting SS since Eastern Nigeria was created in 1951. They have always sided with the hawkish core north in denying SS any special privilege as an oil producing region. They hid under Obasanjo 3rd term to jettison the proposed 25% derivative to oil producing states. They sided with the north over the offshore/onshore dichotomy They are the biggest enemies of not only the SS but also SW out of pure envy, jealousy and covetousness |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by grandstar(m): 6:09pm On Oct 02, 2025 |
onuman:It prime purpose is electioneering. It is also to assist the South South or all coastal states especially the South South. The speed at which it's being executed indicates its electioneering importance. |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by 99thEnemy(m): 6:10pm On Oct 02, 2025 |
SmartPolician:When the road is completed, please never ever use it. |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by benitwater(m): 6:15pm On Oct 02, 2025 |
This is the best government, ASIWAJU Bola ahmed Tinubu, A great leader with great wisdom and vision. we are solidly behind you Asiwaju' |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by PDPdestroyer(m): 6:20pm On Oct 02, 2025 |
Tareq1105:Gbam! Gbam!! Gbammest!!! |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by MrSly(m): 6:22pm On Oct 02, 2025 |
blamingthedevil:Coastal highway, a single project Tinubu used to rob nigeria decades of revenue. |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by mascot87(m): 6:26pm On Oct 02, 2025 |
DeepSight:I still empathise you Rest dude |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by mascot87(m): 6:28pm On Oct 02, 2025 |
lexy2014:Seems you are just waking up. Try clear your eye first and rinse your face with water ![]() |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by amAZEing: 6:29pm On Oct 02, 2025 |
blamingthedevil:Why not concrete. |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by frankson1(m): 6:33pm On Oct 02, 2025 |
WorldRichest:When work on the 2nd Niger bridge started, they were all saying that it was politics. What they started saying after its completion was that Jonathan had already started and paid the contractor in full. They're are perpetual haters and bitter people. |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by garykoeman: 6:34pm On Oct 02, 2025 |
Don't understand why people from the otherside of the divide are bitter whenever good things are happening in the country. Is it because obi lost 2023 presidential election. ![]() |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by garykoeman: 6:37pm On Oct 02, 2025 |
MrSly:All these because obi lost 2023 election. Yet your people can't do without southwest. |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by jamafa: 6:42pm On Oct 02, 2025 |
givedemwotowoto:Hatred is a disease You can benefits anything from it |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by anonimi: 6:56pm On Oct 02, 2025 |
SmartPolician:The point of misplaced priorities as we watch and observe other roads become even more dangerous for users ![]() https://www.youtube.com/watch?v=e9whI_y1Ddg |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by Blakjewelry(m): 6:57pm On Oct 02, 2025 |
yemre:Anybody who truly has the country at heart will only criticize when it is necessary, this is one project I have been praying for long before it was initiated. My prayers is, it should be completed before he leaves office else those people criticizing it won't touch it when they get there. |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by anonimi: 7:00pm On Oct 02, 2025 |
jamafa:Do you think that Tinubu loves our country for making everything worse than when deregulation and privatisation PDP capitalists were in charge a decade ago ![]() anonimi:The Minister of Finance and Coordinating Minister of the Economy Chief Olawale Edun has said the last time Nigeria’s economy looked stable was about a decade ago. He made this statement during his maiden press conference as Minister of Finance where he outlined President Bola Tinubu’s vision, agenda and strategy for the economy. He said, “I think as we all know, we are not where we should be. The economy is barely growing above the rate of population growth. “But it was not always so, and I think in trying to look at the way forward, if we now have a situation of slow growth, double-digit inflation, weak/depreciating exchange rate, as well as security concerns that are resulting in an economy that is not growing and not taking Nigerians out of poverty. “If we think back to the last time when the economy was stable- when it was growing, when inflation was low, and the interest rate was affordable, that period was about a decade ago. Growth was about 6% in 2013 and 2014.” Private sector to drive the economy https://nairametrics.com/2023/09/01/the-last-time-nigerias-economy-was-stable-was-about-a-decade-ago-wale-edun/ |
| Re: Work In Progress: Cross River Section Of Lagos-calabar Coastal Highway by anonimi: 7:06pm On Oct 02, 2025 |
MrSly:I thought this is just one of the 40 roads built already with the $84 billion subsidy savings that has made petrol and everything else too expensive for ordinary citizens ![]() TimeManager: |
Calabar And Akwa Ibom Section Of The Lagos-Calabar Coastal Road (Pictures) • First Kilometre Of Lagos-Calabar Coastal Highway Completed With Street Lights • Lagos - Calabar Coastal Highway Includes Railway Tracks In The Middle • 2 • 3 • 4
Road Trip: Makurdi To Osogbo (pictures And Video) • Ireland Deports 35 Nigerians • BRT Driver Who Crashed Into Train Arraigned For Manslaughter

