Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Billions123: 4:56pm On Dec 12, 2025
sonnie10:
No. I just have the machine at home for personal use.
Same pressure washer for washing cars right?

Please help me post sample of mold bleach you use.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by christ007(m): 8:39pm On Dec 12, 2025
I am looking for an experienced tiler who can visit the project site in Benin, County Home Junction, take accurate measurements, and provide a detailed estimate for the tiles needed.
Please DM with your portfolio and availability.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by FEGEITOK: 10:59am On Dec 13, 2025
This is the MOU that the architect sent me and has been pestering my life ever since to sign it and to tell him his percentage from the project:

MEMORANDUM OF UNDERSTANDING

This Memorandum of Understanding (MOU) is made and entered into on 2nd of December 2025 by:

NAME: ARC. He who shall not be named
ADDRESS: Does not matter

and

NAME: Me
ADDRESS: Why should I put this online?

OBJECTIVE

Both parties agree to work together on the Bleep Project, sharing costs, expertise, and resources to make the project a success.

TERMS
1. Duration: This MOU is effective from 2nd December 2025 to 31st January 2026.

2. Reimbursement: Both parties will be reimbursed for their expenses incurred before and during the project, upon submission of receipts and approval by both parties.

3. Profit Sharing: The parties agree to share profits from the project in the following percentage:
-
-

4. Roles and Responsibilities: Both parties will work collaboratively on the project, with responsibilities as agreed upon separately.

5. Decision Making: Major decisions will be made jointly by both parties.


CONFIDENTIALITY

Both parties agree to keep confidential all information related to the project and this agreement.

ACCEPTANCE

By signing below, the parties acknowledge that they have read, understand, and agree to the terms of this MOU.

Signature Page

You: _____________________________
Date: _____________________________

Partner: _____________________________
Date: _____________________________

Critically analyze this document, is this architect an independent service provider or did I bring up a co-owner?

I told him to give me 7 days to complete the project documentation and he complained so I told him 72 hours from Friday and he would not let my phone rest since Friday, meanwhile I still have 3 more sections of the proposal to prepare
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by GloriousGbola: 11:35am On Dec 13, 2025
FEGEITOK:
This is the MOU that the architect sent me and has been pestering my life ever since to sign it and to tell him his percentage from the project:

MEMORANDUM OF UNDERSTANDING

This Memorandum of Understanding (MOU) is made and entered into on 2nd of December 2025 by:

NAME: ARC. He who shall not be named
ADDRESS: Does not matter

and

NAME: Me
ADDRESS: Why should I put this online?

OBJECTIVE

Both parties agree to work together on the Bleep Project, sharing costs, expertise, and resources to make the project a success.
the architect is a contractor being paid by you for a service

TERMS
1. Duration: This MOU is effective from 2nd December 2025 to 31st January 2026.

2. Reimbursement: Both parties will be reimbursed for their expenses incurred before and during the project, upon submission of receipts and approval by both parties. with the way this is going i advise you double check any price before going ahead

3. Profit Sharing: The parties agree to share profits from the project in the following percentage: you are not a partnership - it is a client contractor consultant relationship
-
-

4. Roles and Responsibilities: Both parties will work collaboratively on the project, with responsibilities as agreed upon separately.

5. Decision Making: Major decisions will be made jointly by both parties.


CONFIDENTIALITY

Both parties agree to keep confidential all information related to the project and this agreement.

ACCEPTANCE

By signing below, the parties acknowledge that they have read, understand, and agree to the terms of this MOU.

Signature Page

You: _____________________________
Date: _____________________________

Partner: _____________________________
Date: _____________________________

Critically analyze this document, is this architect an independent service provider or did I bring up a co-owner?

I told him to give me 7 days to complete the project documentation and he complained so I told him 72 hours from Friday and he would not let my phone rest since Friday, meanwhile I still have 3 more sections of the proposal to prepare
unless there is something you are not saying. my honest advise at this point would be to secure all the documentation you have and cut the architect loose. he sounds like he is going to be a lot of trouble down the road. and he is the kind of person who may try to leapfrog over you to the client.

this is my take based on the information available
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by FEGEITOK: 12:18pm On Dec 13, 2025
GloriousGbola:
unless there is something you are not saying. my honest advise at this point would be to secure all the documentation you have and cut the architect loose. he sounds like he is going to be a lot of trouble down the road. and he is the kind of person who may try to leapfrog over you to the client.

this is my take based on the information available
I have hidden nothing.

His actions and speech give me serious cause for concern.

I am seriously shopping for alternatives but will pay him for all work done to date.

The only thing I haven't done is to share his chats on the issue.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bleexInc(m): 5:23pm On Dec 13, 2025
Which company is the best for piling in Lagos
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by kkonsults:
bleexInc:
Which company is the best for piling in Lagos
Hello,
You can contact us for Pile Foundation.

K

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by segcymoor(m): 9:55pm On Dec 13, 2025
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Adedward(m): 10:27pm On Dec 13, 2025
staticstring:
Good morning everyone,

Aluminum Fabricators in the house please help me.

Please help confirm if the aluminum brand attached is an imported because the label on it has a Nigerian Address and Company
it's imported materials
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rmx: 12:45pm On Dec 14, 2025
FEGEITOK:
I have hidden nothing.

His actions and speech give me serious cause for concern.

I am seriously shopping for alternatives but will pay him for all work done to date.

The only thing I haven't done is to share his chats on the issue.
Dint you guys agree on scope of work , payment terms at the beginning , am seriously wondering how things evolved to where he is transitioning to a partner and inserting himself in other things , what nonsense , abi na me no understand, did you lead him on or encourage him in other ways ,is he pulling other strings towards the actualization of the contract outside his initial scope of work , is he related to you ?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by PuZZyNegro: 1:01pm On Dec 14, 2025
darc:
Kindly contact via mail for your Detailed Architectural & Construction Drawings.
dakitect@gmail.com
Please, any critic on this floor plan

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by PuZZyNegro: 1:06pm On Dec 14, 2025
laptopsforsale:
How do I reach you?
Bro, I didn't get your mail. I've emailed you using nairaland mailing feature
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by FEGEITOK: 1:14pm On Dec 14, 2025
rmx:
Dint you guys agree on scope of work , payment terms at the beginning , am seriously wondering how things evolved to where he is transitioning to a partner and inserting himself in other things , what nonsense , abi na me no understand, did you lead him on or encourage him in other ways ,is he pulling other strings towards the actualization of the contract outside his initial scope of work , is he related to you ?
1. Initial Engagement & Site Survey (Bill #1) I met the architect while he was supervising a renovation near my former residence. We have no familial relationship. I initially engaged him to survey a site and assist with 3D visualizations. He quoted a consultation fee for the site visit, which I paid immediately.

2. 3D Visualization Negotiation (Bill #2) Following the visit, he submitted a bill for 3D visualizations. I deemed the quote excessive and paused the engagement. He followed up repeatedly, prompting a negotiation on price. I informed him that unless he accepted my counter-offer, I would wait for the contract award or seek alternatives. He eventually agreed to my figure, and I paid him in full for the 3D visualizations.

3. Documentation & Scope Expansion (Bill #3) I questioned whether his output covered all technical requirements. His response was unsatisfactory, so I conducted independent research and identified missing documentation. When I requested these specific documents, he presented a third, substantial bill. I agreed to draft a contract to cover this specific scope—not to offer him a partnership.

4. The MOU & Profit Sharing Dispute He drafted a Memorandum of Understanding (MOU) requesting a percentage of the project contract in addition to his documentation fee. I instructed him to send the draft with the percentage left blank for my review. Upon review, I identified several significant issues. I informed him that I would prioritize finalizing the proposal documentation before addressing the flaws in the MOU.

5. Market Survey (Bill #4) He also conducted a market survey, constituting a fourth distinct billable item. It was after the market survey that this issue of partnership arose.

Summary of Contribution: To date, his contribution is limited to paid services: (1) Site Consultation, (2) 3D Visualizations, (3) As-built designs, and (4) Market Survey.

My Contribution: I retain sole responsibility for the project's success, including business development, stakeholder meetings, proposal defense, and all strategic efforts required to win the contract. And while the duration of his MOU is limited to between now and when the project is paid for and executed, my obligations to the client continue for a minimum of 1 year from the date of project handover; he is not part of that.

He just wants to make a quick buck and be on his way.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rmx: 1:28pm On Dec 14, 2025
FEGEITOK:
1. Initial Engagement & Site Survey (Bill #1) I met the architect while he was supervising a renovation near my former residence. We have no familial relationship. I initially engaged him to survey a site and assist with 3D visualizations. He quoted a consultation fee for the site visit, which I paid immediately.

2. 3D Visualization Negotiation (Bill #2) Following the visit, he submitted a bill for 3D visualizations. I deemed the quote excessive and paused the engagement. He followed up repeatedly, prompting a negotiation on price. I informed him that unless he accepted my counter-offer, I would wait for the contract award or seek alternatives. He eventually agreed to my figure, and I paid him in full for the 3D visualizations.

3. Documentation & Scope Expansion (Bill #3) I questioned whether his output covered all technical requirements. His response was unsatisfactory, so I conducted independent research and identified missing documentation. When I requested these specific documents, he presented a third, substantial bill. I agreed to draft a contract to cover this specific scope—not to offer him a partnership.

4. The MOU & Profit Sharing Dispute He drafted a Memorandum of Understanding (MOU) requesting a percentage of the project contract in addition to his documentation fee. I instructed him to send the draft with the percentage left blank for my review. Upon review, I identified several significant issues. I informed him that I would prioritize finalizing the proposal documentation before addressing the flaws in the MOU.

5. Market Survey (Bill #4) He also conducted a market survey, constituting a fourth distinct billable item. It was after the market survey that this issue of partnership arose.

Summary of Contribution: To date, his contribution is limited to paid services: (1) Site Consultation, (2) 3D Visualizations, (3) As-built designs, and (4) Market Survey.

My Contribution: I retain sole responsibility for the project's success, including business development, stakeholder meetings, proposal defense, and all strategic efforts required to win the contract. And while the duration of his MOU is limited to between now and when the project is paid for and executed, my obligations to the client continue for a minimum of 1 year from the date of project handover; he is not part of that.

He just wants to make a quick buck and be on his way.
You should move, maybe even earlier , once you have collected all you paid him to do , looking like he knows too much already , maybe he feels the contract is too much for you to chop alone grin grin grin , all the best
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by GloriousGbola: 1:51pm On Dec 14, 2025
FEGEITOK:
1. Initial Engagement & Site Survey (Bill #1) I met the architect while he was supervising a renovation near my former residence. We have no familial relationship. I initially engaged him to survey a site and assist with 3D visualizations. He quoted a consultation fee for the site visit, which I paid immediately.

2. 3D Visualization Negotiation (Bill #2) Following the visit, he submitted a bill for 3D visualizations. I deemed the quote excessive and paused the engagement. He followed up repeatedly, prompting a negotiation on price. I informed him that unless he accepted my counter-offer, I would wait for the contract award or seek alternatives. He eventually agreed to my figure, and I paid him in full for the 3D visualizations.

3. Documentation & Scope Expansion (Bill #3) I questioned whether his output covered all technical requirements. His response was unsatisfactory, so I conducted independent research and identified missing documentation. When I requested these specific documents, he presented a third, substantial bill. I agreed to draft a contract to cover this specific scope—not to offer him a partnership.

4. The MOU & Profit Sharing Dispute He drafted a Memorandum of Understanding (MOU) requesting a percentage of the project contract in addition to his documentation fee. I instructed him to send the draft with the percentage left blank for my review. Upon review, I identified several significant issues. I informed him that I would prioritize finalizing the proposal documentation before addressing the flaws in the MOU.

5. Market Survey (Bill #4) He also conducted a market survey, constituting a fourth distinct billable item. It was after the market survey that this issue of partnership arose.

Summary of Contribution: To date, his contribution is limited to paid services: (1) Site Consultation, (2) 3D Visualizations, (3) As-built designs, and (4) Market Survey.

My Contribution: I retain sole responsibility for the project's success, including business development, stakeholder meetings, proposal defense, and all strategic efforts required to win the contract. And while the duration of his MOU is limited to between now and when the project is paid for and executed, my obligations to the client continue for a minimum of 1 year from the date of project handover; he is not part of that.

He just wants to make a quick buck and be on his way.
you must have paid him very very very well the first time which is why his mouth don wide - which is the downside of being forthriight. people now see you as mumu

no one charges for market survey. as a professional you are supposed to have those figures on hand
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by FEGEITOK: 1:55pm On Dec 14, 2025
GloriousGbola:
you must have paid him very very very well the first time which is why his mouth don wide - which is the downside of being forthriight. people now see you as mumu

no one charges for market survey. as a professional you are supposed to have those figures on hand
Maybe another issue is that he wants me to handover the full quotation |(architectural and non-architectural) for his QS to create a professional bill of quantity and I have not done so!

He has been asking for days and I have said the document is not ready

He may need the money
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by uncleteeh(m): 2:36pm On Dec 14, 2025
PuZZyNegro:
Please, any critic on this floor plan
The designer did a cool job, it's kinda fantastic.

My little observation.
As a luxurious apartment, it shouldn't be lacking a laundry, the kitchen too needs a store, the master bedroom's windows should be cross ventilated.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by darc: 4:54pm On Dec 14, 2025
PuZZyNegro:
Please, any critic on this floor plan
It’s a perfect design.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by PuZZyNegro: 8:42pm On Dec 14, 2025
darc:
It’s a perfect design.
Oh thank you
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by PuZZyNegro: 8:43pm On Dec 14, 2025
uncleteeh:
The designer did a cool job, it's kinda fantastic.

My little observation.
As a luxurious apartment, it shouldn't be lacking a laundry, the kitchen too needs a store, the master bedroom's windows should be cross ventilated.
Thanks for the comment. I'll ask him if there's a space for such
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by GloriousGbola: 8:56pm On Dec 14, 2025
PuZZyNegro:
Please, any critic on this floor plan
Show the bathtub or shower stall and toilet n the bathrooms to be sure you have the space

Kitchen door should be large so no challenge bringing in a big fridge or freezer

Modern kitchens have washing machines

You need to show the fridge, freezer, washing machine, gas cooker dishwasher etal in the kitchen

Show proposed position of TVs

If this is a rich guy include a panic room
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by PuZZyNegro: 9:32pm On Dec 14, 2025
GloriousGbola:
Show the bathtub or shower stall and toilet n the bathrooms to be sure you have the space

Kitchen door should be large so no challenge bringing in a big fridge or freezer

Modern kitchens have washing machines

You need to show the fridge, freezer, washing machine, gas cooker dishwasher etal in the kitchen

Show proposed position of TVs

If this is a rich guy include a panic room
I think the architect is working based on the available space. It's a 300 square metres land.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by sonnie10:
What is the best screeding material for fence? It seems like premix putty will not work here since it will always be exposed to direct rain
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by sonnie10: 8:19am On Dec 15, 2025
GloriousGbola:
Show the bathtub or shower stall and toilet n the bathrooms to be sure you have the space

Kitchen door should be large so no challenge bringing in a big fridge or freezer

Modern kitchens have washing machines

You need to show the fridge, freezer, washing machine, gas cooker dishwasher etal in the kitchen

Show proposed position of TVs

If this is a rich guy include a panic room
Washing machine and dryer is supposed to be in the laundry not kitchen in a luxury modern home.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by GloriousGbola: 8:22am On Dec 15, 2025
sonnie10:
Washing machine and dryer is supposed to be in the laundry not kitchen in a luxury modern home.
yes and no

most modern luxury apartments have them all in the kitchen

if you have a standalone luxury home with a lot of space, then yes, you may have a detached laundry. however if you have a luxury apartment, then these are typically in the kitchen.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by gbadexy(m): 8:32am On Dec 15, 2025
sonnie10:
Washing machine and dryer is supposed to be in the laundry not kitchen in a luxury modern home.
I only speak from experience, building and fence have been screeded without painting for up to 6 years and has been painted over 5 years now.
https://www.nairaland.com/5491156/painting-picture-updates-osogbo-mansion
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Philipok: 8:35am On Dec 15, 2025
Good morning,yes I av worked for maney people here,but can can remember few name here, which is sir sonie01 and Mr James,
Ndyoo:
I like your work from the ones I have seen so far. Have you worked for anyone here? Anybody that can vouch for you?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Philipok: 8:43am On Dec 15, 2025
sonnie10:
What is the best screeding material for fence? It seems like premix putty will not work here since it will always be exposed to direct rain
good morning sir,it been a while, because I lost my phone and couldn't contact u again.i can see that u av already gone far for the project, thank God for, that,
For fencing screeding,the best is mixing pop paint with black cement,top bond and waterceal and ammonia,I can handle that I given the chance
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Philipok: 8:58am On Dec 15, 2025
laptopsforsale:
Neat here.

Is that Polystyrene parapet? If yes, did you need to cast a new beam on top of that last layer of block in order to attach the parapet?
this one isn't polystyrene,but I do polystyrene too,
Is the final coach of the block after lintel,is up to 3 steps,u don't need beam for that,but if not u need to make it 3 coaches,to attain a proper height.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Philipok: 8:59am On Dec 15, 2025
christ007:
where are you located
ASaba but do travel places for work,so location is not a barrier to me.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Philipok: 9:05am On Dec 15, 2025
I give both busy designs and simple design,
Let do business this Xmas please.
Good artwork design, screeding and Tyrolean.

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dfrenzy(m): 9:17am On Dec 15, 2025
Good morning all, may this Monday be a day of rejoicing and gratitude for the gift of life. God will bless you and keep you, and make His face shine upon you, and be gracious to you. Do have a blessed day, and lovely week ahead