₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,346,379 members, 8,522,730 topics. Date: Saturday, 21 November 2026 at 09:28 PM

Toggle theme

Details Of Ife-Ibadan-Ilesa Highway Under Construction - Travel - Nairaland

Nairaland Forum › Nairaland General › Travel › Details Of Ife-Ibadan-Ilesa Highway Under Construction (14632 Views)

1 2 Reply (Go Down)

Details Of Ife-Ibadan-Ilesa Highway Under Construction by AnonPoet(op): 6:28pm On Jan 26
Renewed Hope everywhere

What you need to know about the reconstruction of the Ibadan-Ilesa/Ife Federal Highway.

-Unprecedented road structure in the history of Nigeria

-Mainly concrete.

-Thickness 20cm height

-First section 11km done(From Iwaraja, ilesa, Osun State)

-Started October 2025

-Scheduled completion is 2026

-Quality equipment and materials

-Ikire-ibadan section will start soon

-Contractor and engineers are fully on site.

-Inspected by Minister of Works, Engr, David Umahi

-Approved by President Bola Ahmed Tinubu.

May PBAT succeed.




Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by AnonPoet(op): 6:31pm On Jan 26
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by Christmyhope: 6:35pm On Jan 26
Tinubu, you may not like him but he's doing greatly.👋👋
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by Osiris12: 6:41pm On Jan 26
Now we see why iron rod expensive for market
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by wman(m): 6:42pm On Jan 26
Do concrete roads last longer than asphalt roads?
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by HydraFeeds(m): 6:43pm On Jan 26
Road construction is laudable , President Tinubu should work more on security and industrilisation .
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by Sabadon(m): 6:45pm On Jan 26
wman:
Do concrete roads last longer than asphalt roads?
depending on the quality of materials used, yes on average using the right materials concrete roads lasts longer, asphalt produces more aesthetics tho
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by hopexter(m): 6:46pm On Jan 26
wman:
Do concrete roads last longer than asphalt roads?
Due to West Africa’s hot weather, asphalt is not encouraged for a long period of time whereas concrete is. Engr. Umahi would have chosen that over concrete.
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by AOB1: 6:47pm On Jan 26
This is a good development
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by richiemcgold: 6:50pm On Jan 26
This is good, great and laudable, especially the quality and thickness of the concrete. But if this particular road construction does not get to Akure, the project is more or less a useless one.
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by Thedon22: 6:51pm On Jan 26
Another road with pictures within 3 years. Nobi audio road. Meanwhile, I am still waiting for pictures of Obis 8 years roads as Anambra gov. Mr I can build China with my mouth no go comment about this good news.
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by Kindledlight(m): 6:52pm On Jan 26
I traveled through that axis last week, I saw the ongoing work and it is laudable.

Hope it can be done speedily.
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by Shimbo96(m): 6:52pm On Jan 26
Well done APC, at least we have good roads.
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by Appletek: 6:54pm On Jan 26
richiemcgold:
This is good, great and laudable, especially the quality and thickness of the concrete. But if this particular road construction does not get to Akure, the project is more or less a useless one.
No worry, e go enter straight into your living room.
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by richiemcgold: 7:01pm On Jan 26
Appletek:
No worry, e go enter straight into your living room.
Don't act like mumu. I've already commended the project. I'm only pointing attention to the remaining parts. The project details we read in the news sometimes last year was Ibadan to Ilesha to Akure and then Benin on dual carriage from the current one lane. So I have a reason for mentioning Akure in my comment. That's my state capital.

https://nairametrics.com/2025/01/09/2025-budget-fg-allocates-n15-billion-for-benin-akure-ilesha-road-dualization-project/
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by Sirtee19: 7:07pm On Jan 26
On my way to Ekiti on Dec 24, I drove through Iwaraja and saw the construction going on. It is a welcome development.
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by femi4: 7:12pm On Jan 26
Osiris12:
Now we see why iron rod expensive for market
Without iron the road won't survive 5yrs
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by MightySparrow: 7:16pm On Jan 26
The quality of roads this Tinubu is building is second to none. This will last many more years than the ones constricted before. Only a visionary, futuristic leader can do that.

It is more expensive though,but durable.
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by Freshandfitpod: 7:21pm On Jan 26
Propaganda have started, they have been showing uncompleted road project since last week, we are not f%%l
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by Putinofrussia: 7:22pm On Jan 26
The people... of Igbomina Kwara...the main iron rod and cement dealers are smiling to the bank greatly this time around.
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by youngrichnigga: 7:28pm On Jan 26
The hype on concrete road construction is just a patronizing lot for Dangote, roads are made with stone base and asphalt even in the UK and the US (only bridges , drainages etc are built with concrete/steel); these roads last for so long because specifications are followed to detail......using concrete for road construction have inadvertently led to the rise in cost of cement and iron rods undecided undecided undecided undecided undecided undecided
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by obembet(m): 7:39pm On Jan 26
Finally... This road is long overdue... The project was mismanaged RCC and some obas then.
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by dragunov: 7:40pm On Jan 26
HydraFeeds:
Road construction is laudable , President Tinubu should work more on security and industrilisation .
He can't do everything in 2 years.
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by CaseSensitive(m): 7:41pm On Jan 26
-Started October 2025

-Scheduled completion is 2026

-Scheduled dilapidation is 2030

Then we have to do it all over again....or maybe not
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by CodeTemplarr: 7:41pm On Jan 26
Labaran Maku under GEJ too was impressive. I laugh.
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by techbro1: 7:43pm On Jan 26
11km is making the newshuh? After how long? Omo!!!
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by Bluntemperor: 7:44pm On Jan 26
Sabadon:
depending on the quality of materials used, yes on average using the right materials concrete roads lasts longer, asphalt produces more aesthetics tho
If e no better pass Asphalt,
Then why do the Engineers -Used Them For Bridges that stand for between 50- 100 years or More?
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by dragunov: 7:45pm On Jan 26
Freshandfitpod:
Propaganda have started, they have been showing uncompleted road project since last week, we are not f%%l
An unhappy, bitter soul spotted.
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by dragunov: 7:48pm On Jan 26
CaseSensitive:
-Started October 2025

-Scheduled completion is 2026

-Scheduled dilapidation is 2030

Then we have to do it all over again....or maybe not
In the US, the government renovate very good, undamaged roads every time. They don't even wait for it to get potholes nor take any chances.
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by dam2000(m): 7:49pm On Jan 26
Tinubu is becoming the best president Nigeria will ever produce don't stone me ooo
Re: Details Of Ife-Ibadan-Ilesa Highway Under Construction by dragunov: 7:50pm On Jan 26
richiemcgold:
This is good, great and laudable, especially the quality and thickness of the concrete. But if this particular road construction does not get to Akure, the project is more or less a useless one.
Yeah? Because the people living in the axis where the roads are being constructed are not important. Ok.
1 2 Reply

Pictures Of Circular Roads Along Ife-ibadan Been Done By Seyi Makinde Govt(pics) • Lagos Light Rail: Pictures Of Marina Train Station Under Construction • Truck, 2 Other Vehicles Catch Fire Along Ife-ibadan Expressway. VIDEO • 2 • 3 • 4

What Is My Wife’s Chance Of Canadian Visa Approval? • Can An Auxiliary Nurse Be Employed Abroad? • Mini-Truck Carrying Diesel Falls On CMS Bridge, Spills Content