$60 Billion Bullet Train Network Will Be Completed In 36 Months - FG - Politics (2) - Nairaland
Nairaland Forum › Nairaland General › Politics › $60 Billion Bullet Train Network Will Be Completed In 36 Months - FG (1879 Views)
| Re: $60 Billion Bullet Train Network Will Be Completed In 36 Months - FG by Kemetian(op): 2:16pm On Feb 02 |
ottersberger:You presented no facts. Just wild claims. Wild assertions. Why not upskill yourself instead of hating Nigeria? Is hating Nigeria your job? |
| Re: $60 Billion Bullet Train Network Will Be Completed In 36 Months - FG by ottersberger(m): 2:17pm On Feb 02 |
Kemetian:Engaging you is a waste of time. bye. |
| Re: $60 Billion Bullet Train Network Will Be Completed In 36 Months - FG by Kemetian(op): 2:20pm On Feb 02 |
ottersberger:PROMISE NOT TO ENTER THE TRAINS ONCE THEY ARE BUILT. |
| Re: $60 Billion Bullet Train Network Will Be Completed In 36 Months - FG by mecuries(m): 2:20pm On Feb 02 |
Bullet train? In a country that produces less than 3,000MW of electricity? We play too much in this country |
| Re: $60 Billion Bullet Train Network Will Be Completed In 36 Months - FG by ottersberger(m): 2:26pm On Feb 02 |
Kemetian:Oga, first, I no fit punish myself with such non-existent thoughts. Second, no train will be built by Tinubu. This same Tinubu ruled Lagos for 8 years as governor, where were his trains?. No be molue and korope bus been litter Lagos roads. Tinubu personifies corruption, fraud and incompetence. |
| Re: $60 Billion Bullet Train Network Will Be Completed In 36 Months - FG by garykoeman: 2:55pm On Feb 02 |
Some people will be sad about these positive news. Haters of the country, |
| Re: $60 Billion Bullet Train Network Will Be Completed In 36 Months - FG by delpee(f): 3:39pm On Feb 02 |
ottersberger:The Lagos-Ibadan train is still working very well. It's my regular means of transportation to Ibadan. I know the Blue and Red lines in Lagos are working with extension in progress for the Blue line. The Green line is coming up soon with the support of FG. |
| Re: $60 Billion Bullet Train Network Will Be Completed In 36 Months - FG by MarketDispatch: 4:06pm On Feb 02 |
Kemetian:I hope all these metal stealing boys will not go and steal some parts of the rail tracks like they did Abuja to Kaduna rail line |
| Re: $60 Billion Bullet Train Network Will Be Completed In 36 Months - FG by IGBOPROMISE1: 4:25pm On Feb 02 |
Leaving aside other germain issues surrounding this flight of fancy, anyone coming in to bankroll a high-speed rail network for Nigeria when the Abuja-Kaduna service built years ago is crawling at a loss and yet to justify its choice of location and billions of dollars in debt sunk into it….building a costly high-speed rail in Nigeria with the attendant safety-related problems of rail equipment vandalism, cows on tracks, and excessive heat that could expand and misshape track metal, it would be a case of the higher the speed=the higher the impact=the higher the casualties! Then there’s also the economic case to be made which was obviously overlooked when Buhari rushed to get a Chinese loan for the Abuja-Kaduna one! |
| Re: $60 Billion Bullet Train Network Will Be Completed In 36 Months - FG by Dathrone: 4:35pm On Feb 02 |
PlasmaTV:Make we dey enjoy that one first before all these grammar join |
| Re: $60 Billion Bullet Train Network Will Be Completed In 36 Months - FG by ottersberger(m): 12:46am On Feb 03 |
delpee:If after witnessing public transportation infrastructure in Morocco, Africa, and you are still proud to call those things trains, good luck. |
| Re: $60 Billion Bullet Train Network Will Be Completed In 36 Months - FG by commoditiesnig(m): 1:00am On Feb 03 |
That’ll be very welcome development.. Nigeria indeed need high speed train to connect major cities.. just like in foreign countries |
| Re: $60 Billion Bullet Train Network Will Be Completed In 36 Months - FG by kayusely70(m): 1:35am On Feb 03 |
garykoeman:Most of them are sadists! |
| Re: $60 Billion Bullet Train Network Will Be Completed In 36 Months - FG by ottersberger(m): 11:45am On Feb 03 |
delpee:You mean the 1 or 2 frequency a day train service?, sure. And that's how the billions owed the chinese for the sub standard trains will be generated and paid, not to speak about real, comfortable and reliable service to those who desire and require the service?. You people will dring every nonsense so long as it is served with your tribal cup. |
Prepare To Receive, Distribute 6,100MW Of Electricity In 6 Months, FG To Discos • 9,000 Autogas Filling Stations Take Off In 6 Months – FG • ₦58 Billion Disbursed To Poor Nigerians In 2 Months – FG • 2 • 3 • 4
"He Does Not Speak For Us”: Ipob Disowns Ejiofor, Accuses Him Of Working Against • India Apologises Over Arrest Of Nigerian Military Attache • Vote Now: Federal Fire Service, Nigerian Police Or NEPA