Four Superhighways Being Built By President Tinubu Cutting Across All Zones - Politics (4) - Nairaland
Nairaland Forum › Nairaland General › Politics › Four Superhighways Being Built By President Tinubu Cutting Across All Zones (14052 Views)
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by rummmy: 11:51am On Feb 10 |
audio building...................when they have refused to fix the existing once no be juju be that? |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by techbro1: 12:10pm On Feb 10 |
Willie2015:You see I've become so complacent that I don't even expect infrastructure like rail from the Nigerian government because they've made most of us see it as a very big deal. Then again the lagos-ibadan model is not a very good example because of speed and relatively few strategically located train stops/stations. |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by Jayhome24: 12:14pm On Feb 10 |
I was shocked when I watch it live thee work on Calabar coastal road axis coming from Calabar to Lagos and I was told it will take just 5 hours from Calabar to Lagos if th road is completed I can imagine the rate at which the corridor will open Calabar for business. |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by 123papas(m): 12:38pm On Feb 10 |
Roads that they have stopped |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by 123papas(m): 12:40pm On Feb 10 |
As of May 2025, approximately 70% of Section One (47.47 km) of the 700km-long Lagos-Calabar Coastal Highway in Nigeria has been completed, with full completion of this phase expected by January 2026. The overall project, which aims to connect nine coastal states, is still in its early stages of development. Key Details on Progress: Section 1 Status: The initial 47.47km stretch from Lagos (Ahmadu Bello Way to Eleko) is over 70% complete. Construction Progress: By May 2025, significant portions of the first 20km and subsequent sections towards Eleko were nearing completion. Total Project Scope: The complete highway is projected to be around 700km to 750km in total length. Timeline: The first phase is scheduled for completion in early 2026, while construction on further sections has commenced. Features: The road is designed with concrete pavement, featuring 6 lanes with plans for solar-powered lighting and CCTV surveillance. While 70% of the first section is completed, this represents a fraction of the total 700km+ project. |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by 123papas(m): 12:42pm On Feb 10 |
As of late 2025, the 1,068 km Sokoto-Badagry Superhighway project in Nigeria is in its early, active construction phase. Key progress includes approximately 4 km of concrete pavement completed, 64 km of route cleared, and 15 km of sand-filling, with the first phase expected to be completed in 2027. Key project details and progress: Total Length: 1,068 km, with 52% in the North and 48% in the South. Construction Status: Significant work is ongoing, with 64 km cleared, 30+ km sand-filled, and 4 km of double-lane concrete pavement finished, along with initial solar street light installation. Phasing: The project has started construction on Section I, Phase 1A in Sokoto State, with completion of the first phase projected for 2027. Design: The highway uses concrete pavement for longevity. Contractor: Messrs Hitech Construction (Nig) Ltd. The project, aimed at connecting the northern and southern regions via a major corridor, is part of a series of infrastructure developments. |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by Ijaya123: 12:42pm On Feb 10*. Modified: 3:41pm On Feb 10 |
1vandragon:But it is perfectly okay to celebrate water fountain and to even organise owanbe to celebrate JB logo. 1vandragon:Good. Lets use same energy towards projects being done by PBAT. 1vandragon:Sure. But stop the double standard. It only exposes your bias. |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by Ijaya123: 12:45pm On Feb 10 |
ceejay80s:But Alex Otti is giving Abia people 24 hours electricity with his money, right? |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by 1vandragon: 12:46pm On Feb 10 |
Ijaya123:Whatever floats your boat. |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by MightySparrow: 12:53pm On Feb 10 |
1vandragon:Yes, Nigeria never had roads. See the thickness of the concrete being used for a lasting road. Not the ones that become death traps few years after construction. Besides, it connects the nation better covering the perimeter where feasible. Then railway track in between is a lot of improvement. I don't expect any successor to go back to road designs that are archaic. |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by 1vandragon: 12:56pm On Feb 10 |
MightySparrow:The same hyping you hyped buhari. Same old, same old. |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by 1vandragon: 12:59pm On Feb 10 |
ObiPandora:Same old, same old. Using a smaller disappointment to hide your bigger incompetence. You did it for buhari, so no surprises. |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by Bluntemperor: 1:06pm On Feb 10 |
1vandragon:You are in pain, somehow,as I can not see anyone that is talking about disaster Buhari govt -being hyped, Or May be those who were governors and his Ministers- that were Never Accountable, Before and even After Buhari left Office. Did you read the Accounts of Mrs Aisha Buhari - when he was warning the husband about those who surrounded him,but are just not performing? |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by ceejay80s(m): 1:13pm On Feb 10 |
Ijaya123:If it's with his money, it's fine but I don't believe it, But if it's not with his money , then he's not different from others, I will bet my right blokos that no politician will spend his salary to the people for free |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by DMCA: 1:21pm On Feb 10 |
Kukutente23:no port deserves to be built in d South East? ![]() |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by Mubiola360: 2:20pm On Feb 10 |
abc115:did you knkw that No Nigerian president has embarked on such a long project in the histroy of Nigeria. The longest at a go road project was 347km by Buhari and he didn't complete it despite coal tar and we have someone using concrete and has done close to 300km of the coastal highway within 3 years |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by 1vandragon: 2:44pm On Feb 10 |
Bluntemperor:Typical rouble rouser. Same lots such as yourself supported buhari, now you are hiding behind his incompetence. Enjoy your delusions. |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by 1vandragon: 2:44pm On Feb 10 |
Ijaya123:Whatever floats your boat... |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by 1vandragon: 2:50pm On Feb 10 |
creativejagaban:Typical. Grasping at straws when nothing sensible to contribute. He can be there for life if that is what God wills. How that improves your own life remains to be seen. |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by 1vandragon: 2:52pm On Feb 10 |
Biodun1929:The Internet is your friend. http://pointblanknews.com/pbn/exclusive/jonathan-constructed-more-roads-than-any-other-nigerian-president-fashola/ |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by OALandAgents: 3:11pm On Feb 10 |
Me thinks these are money looting schemes for Tinubu's 2027 election money. Sure the projects have been commenced but is barely progressing based on the amount of money already allegedly spent so far. 🤔 Nonetheless all praise must go to infrastructure guru Engr Nweze Dave Umahi , the brilliant hard working Minister of Works, one of the only 2 or 3 working ministers in Tinubu's government. |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by dappydozzy(m): 3:38pm On Feb 10 |
1vandragon:The past administrations built roads but is it the same design and quality. The one being built in my State currently is built using reinforced concrete, roads built like this stands the test of time. Some lasting 20 to 30 years. It is not like past administrations did not built roads. It is the quality. How many governments or administrations has built super highways since the inception or our national independence. What is what commending is what commending. And mind you, what you feel is just your opinion . |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by 1vandragon: 3:42pm On Feb 10 |
Adakintroy:The same negativity you had when you didn't see anything good in pdp that built over 12 power stations. Go and take several sits with your darkened heart. |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by 1vandragon: 3:43pm On Feb 10 |
dappydozzy:Highways that have not being completed is what you are comparing? While, that's you view point, as incomplete as it is. |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by 1vandragon: 3:45pm On Feb 10 |
erad:Not by insulting those who had opposing views or being dismissive of critics. Besides, I don't recall unilateral awards of billion dollar contracts without due process. |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by 1vandragon: 3:48pm On Feb 10 |
cyberbro:How? Pdp built over 14 power stations. Fashola admitted that GEJ did more roads that any other administration. It is good that bat seems to be working, but he should not insult our sensibilities by doing so. Why should his people say others should not drive on the roads when they are completed? Does that make sense to you? |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by Jagabanfromcali: 5:51pm On Feb 10 |
Passing thru one village in eboyni state is passing thru all the zones right ? Tinubu and APC is anti Igbo |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by Biodun1929(m): 6:35pm On Feb 10 |
1vandragon:Do you understand English at all. Read my first post again and reply me accordingly. |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by MightySparrow: 6:47pm On Feb 10 |
1vandragon:So you cannot see the quality of the roads? Anyway.... |
| Re: Four Superhighways Being Built By President Tinubu Cutting Across All Zones by 1vandragon: 7:10pm On Feb 10 |
MightySparrow:Lol. Wait, how many completed kilometres of road are you guys even making noise about? Less than 10% and you won't allow anyone rest. Very funny. |
7 New Factories Being Built In Nigeria • Situation Report. We Are Leading In All Zones Except South East.-photo • Nigerian Cities With 10 Lanes Superhighways- Pictures • 2 • 3 • 4
"All We Did Was In Vain" - Mike Igini Regrets 10 Years At INEC • How Effective Are Our Emergency Numbers (767 And 112) • ADP Rejects Ekiti Poll Results, Threatens Court Actions
