Progress Report Of Abuja-Kaduna-Zaria-Kano Road - Politics - Nairaland
Nairaland Forum › Nairaland General › Politics › Progress Report Of Abuja-Kaduna-Zaria-Kano Road (6540 Views)
| Progress Report Of Abuja-Kaduna-Zaria-Kano Road by Melezenawii(op): 6:14pm On May 08 |
Abuja~kaduna-Zaria-Kano Road They want to reverse this and take us back to the old era that’s why they want you to join ADC or NDC….. avoid them they hate development!!!
|
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by AMINDA: 6:16pm On May 08 |
Have you seen the stretch from Kaduna to Kano done by Julius Berger under Buhari? Buttery smooth. Tinubu revoked the contract and handed it to a generator importing company. The quality and slow pace of the so-called concrete technology now leaves much to be desired. |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by Alaigbo(m): 7:17pm On May 08 |
Continue clowning your soul. Even the deaf dumb n blind know no preaident can compete with Tinubu with what he as just done on roads in 3 years. AMINDA: |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by goslowgoslow(m): 10:40pm On May 08 |
AMINDA:There is nothing you people will not complain about. If Nigeria taya you leave! |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by demstone: 10:44pm On May 08 |
THIS IS NOT 2023 WHEN U LIE ND DEN SAY THE PHRASE " GO AND VERIFY" HAVE SOME INTEGRITY AMINDA: |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by damoobaba: 10:47pm On May 08 |
Aje, Tinubu is the master of infrastructure development |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by damoobaba: 10:48pm On May 08 |
demstone:I doubt if any Nigerian President will ever reach Tinubu level when it comes to infrastructural development. What the man has in plan is even more than what is currently going on. |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by clefstone(m): 10:51pm On May 08 |
I don't acknowledge Tinubu as President but the job done on the Abuja end of the road leaves very little to be desired. I pass the road at least 3 times every weeek. However, we have suffered during the construction and the pace of the work is quite slow especially during the early phase at Zuba |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by Lithiumite: 10:56pm On May 08 |
No president has achieved more than tinubu in terms of road insfrastructure.......take that to the bank,the last time we had anything similar was during the oil boom years of the Gowon era......Peter obi that criticised Tinubu’s investments in road insfrastructure is rather shortsighted and myopic in reasoning.......when the 3rd mainland bridge was being developed from conception to actual building, it had a lot of obstinate critics and vehement procrastinators like obi who didn't see the ingenuity of that vision in 1976 but look where we are today,imagine lagos without that bridge or would we have been able to build such if we hadn't had the time considering the economic downturn we have suffered post oil boom. |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by aieromon(m): 11:05pm On May 08 |
AMINDA:Stop with the lies please. |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by Odin13: 11:05pm On May 08 |
Abuja to kaduna is still very bad . Tinubu and propaganda Try kaduna Zaria Kano by buhari This southwest government is lying to much to Nigerians .. good there are lots of us that pass the rod daily When will he fix Abuja to Okene.. and oturkpo to Enugu okigwe owerri Aba umuahia porthacut end . Nigerians are not foolish like his people that worship him.. We get eyes and we Dey see not story |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by Omi24: 11:32pm On May 08 |
Is this a sponsored post? |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by MilestoneMillet: 11:53pm On May 08 |
What people don't realise is that under previous governments, esp during Jonathan and Obasanjo and Buhari( people around him), these kind of funds President Tinubu is currently spending on these huge projects were just being embezzled in big quantities. The last Minister of FCT didn't even build a drainage in all his 8 years, and now, see how transformative the city is.... If you gives think I'm a supporter of this current President, look at the states of these roads before now. It felt like we had no government. Look at the states of our Airports, Seaports, etc. Look at Edo. Imagine no flyover, no drainage, glorified village, and all of a sudden, a man passionate about infrastructure arrives, and people are saying he can't speak English? These infrastructures are not rice and beans but will make rice and beans surplus in the near future!! |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by U09ce: 11:56pm On May 08 |
If you follow all these choreographed videos you'd think these are nice roads. Ask any person plying Abuja Kaduna about the progress of the work. Ask the person whether the concrete pavement is of same quality with the asphalt the previous contractor was doing. Enough of these deceptions |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by techbro1: 11:59pm On May 08 |
I'm very happy that people are seeing through the uselessness of this government. Every market day, you people will come here with your half baked projects to disturb the little peace the average Nigerians are managing to have. Most of the people posting these videos and talking about it are just doing what they're told to do in their various Whatsapp or Facebook groups. Look at the road from Koton Kafe to Abaji and down to Gwagwalada, a lot worse than it used to be. Construction is very slow and dare I say, the contractors are not even on site. Obajana junction to Lokoja nko? Deplorable. Even the Abuja - Kaduna that they're making so much noise about, what percentage have they covered? It's always this half baked progress reports because of course, there no progress. And for those of you defending tinubu and APC, I hope when you realize that you're nothing but a worthless slave whose life has no meaning to your slave master, it's not too late to pick your lives up. |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by techbro1: 12:09am On May 09 |
MilestoneMillet:Oga shut the fvck up! When last did you go to Edo state? When last did you travel around there? What's the condition of Benin bypass? What's the condition of Benin- Asaba expressway? The nonsense they started in Asaba around summit, what's the situation? Auchi - Ekpoma road nko? It's flyover you're celebrating? See eh, it's very insulting to people that ply these roads daily when you people come out to support this foolish and irresponsible government. We suffer on these roads!!! In the "not so good" state that these roads were, we were doing our journeys in shorter times compared to now where there are unfinished projects here and there with almost no contractors on site. STOP LYING TO YOURSELVES JESUS CHRIST!!!! |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by Vision101(m): 12:19am On May 09 |
AMINDA:You are now praising Buhari. If it's good it's Buhari but if Buhari did it wrong then it's Tinubu and APC because Tinubu hung Buhari on Nigeria. Can you see hypocrisy? |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by Kukutente23: 12:24am On May 09 |
This thread is still on page 1 since yesterday? Where are the BATists to celebrate the good works of their god Oh. They're on the Barry 2k thread Even they can't be distracted enough to comment on what they know to be lies packaged as achievement of their master while he's ruining lives This same road they hailed Buhari for... they've transferred the hailing to Tinubu yet road never gree complete Chai!! Zombie way na one way Fela nailed it!! |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by Kukutente23: 12:28am On May 09 |
Lithiumite:How many roads has he achieved? Just itemise them pls |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by Lithiumite: 5:28am On May 09 |
Kukutente23:I don't have the full list. Lagos-calabar Sokoto-Badagry Sagamu-ijebu ode Ibadan-ife-ilesha-akure Rehabilitation of 3MB and the entire 3rd axial road and bridges in Lagos. Benin-asaba Enugu-PH Onitsha-Enugu Onitsha-owerri Calabar-Abuja Artisan bridge Enugu 2nd naija bridge access roads Makurdi-9th Mile Rd Abuja-kaduna-kano highway Kano-maidugiri dualisation I think these are the few I can remember!! |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by ratcock: 5:59am On May 09 |
A large number of Nigerians are not deceived by these half baked projects paraded around. What these merchants of bad governance do is that they take pictures of small portions of the road and post as completed. Imagine some ignorant lots celebrating 5 kilometers out of a 100 kilometers? Despicable the humongous loans obtained so far. Tinubu’s administration is an eyesore. |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by senator2k9(m): 6:59am On May 09 |
Lithiumite:why Do you lie with so much impunity? Mkd 9th mile road is a Buhari project and it's barely 25 percent completed, spanning over 4years now since inception. Sorry sir, were you brainwashed to believe all these fibs? |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by id4sho(m): 7:53am On May 09 |
aieromon:https://leadership.ng/group-demands-umahis-resignation-termination-of-kaduna-abuja-road-contract/
|
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by Sirleo05: 8:05am On May 09 |
who is using all dis empty roads for north? when its mostly needed in the south. not against development in the north, but the development there is much compared to the south, where much of the money is coming from. |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by ufotunang: 9:06am On May 09 |
What is so special about roads..past presidents of Nigeria has constructed roads... even governors also construct roads. Nothing special about it.. what Nigerians need is electricity..not national grid collapsing everytime and everyday, Nigerians need low costs of living, low inflation rate , ,naira appreciation and naira to have value, low costs of foodstuffs, fuel, transportation costs low, house rent, school fees low, medical treatment and drugs low |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by sunnnnyuu(m): 4:16pm On May 09 |
AMINDA:Where is the prove that the road was constructed? Is this picture representing the whole distance from Abuja to Kano? We need to see pictures not one picture. And some data boys are here shouting nobody can compete with the drug lord mts |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by Typing: 4:33pm On May 09 |
Alaigbo:Your lies and propaganda won't save your god Tinubu. Kaduna-Zaria-Kano section of that road has since been completed by Buhari before 2023. Julius Berger did a wonderful job there. The unlucky section that was yet to be completed. The Kaduna-Abuja section was yet to be completed before Buhari left. The road is still at the same stage Buhari left it. My village is along that road. I kept wondering what project Tinubu will use to campaign. I can see that, he now resort to using Buharisl's projects to campaign in 2026. |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by Kukutente23: 5:56pm On May 09 |
Lithiumite:Do you understand English at all? How many roads has he ACHIEVED?!! |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by shollyBi(m): 7:07pm On May 09 |
Bunch of Lunatic lairs. I passed throughout Abuja-kaduna road today. That road is a complete stretch of mess and a dead trap. I wonder the stupid work they claim to have done |
| Re: Progress Report Of Abuja-Kaduna-Zaria-Kano Road by NOETHNICITY(m): 10:04pm On May 09 |
This is another legacy project by Tinubu |
David Umahi Inspects The Abuja-Kaduna-Kano Road • Progress Report: 2nd Niger Bridge • Bandits Lock Down Kaduna-Zaria Road, Kidnap Travellers, Many Feared Dead • 2 • 3 • 4
What Do Your State An LG Contribute To Nigeria And What Have You Done To Ensure They Contribute? • Okada Accidents Have Reduced By 95% In Lagos – Kayode Opeifa • What Is Nigeria Celebrating At 53?