Quality Of Work Being Done On Lokoja-Abuja Road (Video) - Travel - Nairaland
Nairaland Forum › Nairaland General › Travel › Quality Of Work Being Done On Lokoja-Abuja Road (Video) (16180 Views)
| Quality Of Work Being Done On Lokoja-Abuja Road (Video) by blamingthedevil(op): 7:15pm On Jul 03 |
See the quality of Work being Done on Lokoja - Abuja Road by President Tinubu
|
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by helinues: 7:21pm On Jul 03 |
Is this not the Lokoja road in Somalia as this government hasn't done a thing according to some confused people |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by Bluntguy: 7:25pm On Jul 03 |
Omo, that guage high o. Give the man credit where he does well. |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by Ritchiee: 7:34pm On Jul 03 |
helinues: ![]() Or better still,it doesn't have any purpose. Why would the govt be executing projects? It is better they embezzle the funds like baba OBJ and Jonathan. The confused lots will say they don't know the usefulness of infrastructures. ![]() |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by BlocksNG(m): 7:40pm On Jul 03 |
haahahahahahaahahahahahaahahaha, databoi. Bluntguy: |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by atobs4real(m): 7:41pm On Jul 03 |
Infrastructure brings food to the table. But things are some how Oga President |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by Typing: 7:41pm On Jul 03 |
Bluntguy:Credit for being incompetent? |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by Judolisco(m): 7:42pm On Jul 03 |
Shame on all the past governors of kogi state.. Wike for Don fix dis road, yab federal government untop and ask for money he used to repair it... Kogi state and bad governors are like 5 and 6 |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by RichDad1(m): 7:42pm On Jul 03 |
helinues:Money that should have been kept in the Bank 🙄🙄🙄 |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by Sunshine34(m): 7:42pm On Jul 03 |
Ritchiee:Why this project when we are hungry 😫 😩 ![]() |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by babesiosis: 7:42pm On Jul 03 |
Oboy that thickness madt..this man they try o make we give am hin credit |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by Parachoko: 7:44pm On Jul 03 |
The Bitter Ones will soon com and pour Thier bile here |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by 1vandragon: 7:45pm On Jul 03 |
I guess road construction started when the dingbat came to power. Nigeria never had any roads before... Meanwhile, how did a non existent FG agency have budget in the 2026 budget signed by the dingbat? All budgets presented by the dingbat and passed by the rubber stamp NASS needs to be audited. |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by bookson(m): 7:45pm On Jul 03 |
Judolisco:Grow up! This is an embarrassing statement from you |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by Richtaiwo(m): 7:45pm On Jul 03*. Modified: 8:01pm On Jul 03 |
One slowpoke dreaming of presidency spent eight years as governor, yet has little to show beyond a brewery. The very roads he used throughout his tenure were left in a deplorable state, and he couldn't be bothered to fix even the worst sections. Now, mistaking Nigerians for a gullible fan club, he will soon show up on this road for some selfies, promising highways of New York standard that his own record never came close to delivering. |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by dibunotion(m): 7:45pm On Jul 03 |
They'll avoid here. Bad news is all they crave for |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by techbro1: 7:45pm On Jul 03 |
Lol you people have come here again with fresh nonsense. We won't learn abi? This same road being celebrated, what's the extent of the job done? Mind you that's just one lane. The pace of work is extremely slow and the stretch that has been done is barely up to 20km The Benin bypass that they started and abandoned nko? Nobody has heard anything on that one till today. Keep getting excited over unfinished projects. |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by marlow1962(m): 7:46pm On Jul 03 |
Yes more roads. Nigeria has no pressing issues right now, so the government wii continue grading roads. Any other issues going on are fake news. |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by Sonofgod1990(m): 7:47pm On Jul 03 |
How I wish Moto go just fail brake and crush dat man spiting trash over there |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by omenka(m): 7:51pm On Jul 03 |
According to the Agulu Nomad, this is unnecessary. |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by Passionnn: 7:51pm On Jul 03 |
Roads that travellers are scared to use due to banditry boko Haram and high transport fares |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by SaintLucia: 7:52pm On Jul 03 |
J F Kennedy said United States is rich not because they have money but United States is rich because they have good road network infrastructure. Obi said Nigeria doesn't need roads but more breweries where people can get drunk and forget their sorrow. ![]() |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by BATified2023: 7:52pm On Jul 03 |
1vandragon:it's like u just heard d word dingbat today? So u wan use am by force ![]() |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by Cappoditutti: 7:53pm On Jul 03 |
The same thing is going on in East-West road. Very impressive, yet some people said he has not done anything Bluntguy: |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by Pootle: 7:53pm On Jul 03 |
BlocksNG:the level thick no be everything person dey turn face |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by Godfullsam(m): 7:54pm On Jul 03 |
Bluntguy:The guage is not that high all round. The guage is most this high where the topography is low. PBAT proponents did that video where the guage is high. |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by omenka(m): 7:54pm On Jul 03 |
Sonofgod1990:Is there anything else you people have going on in your minds besides death and destruction?😮💨 |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by Sonofgod1990(m): 7:55pm On Jul 03 |
omenka:Am telling. May your life be ruled as tinubu is ruling Nigeria currently. Shout the loudest amen
|
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by GerogeI(m): 7:55pm On Jul 03 |
Why the deceit? What you have is obviously a boundary an embankment, like a retaining wall. Inside is packed with sand or gravel. More likely sand. If that fake Engineer is actually a professional, the question he should be answering is 1. Is their a gravel bed before the concrete? What Size and thickness? 2. What is the strength of concrete used? C10, C20, C30, C40, C50. 3 feets of C10 concrete on a busy highway is as useless as sand pack. 3. Is there reinforcement bars to withstand longitudinal and lateral tension? Dave Umahi builds concrete roads mostly without rebars. Concrete as a material has good compressive strength and lack tensile strength so breaks apart under tension. So must be reinforced with steel rebars. 4. Are the expansion joints on the road. Everyday as the sun rises and sets temperatures of the concrete goes up in day and cools at night. Most materials including concrete expands and become longer with increase in temperature, but you do not detect this from merely looking at it. Without space for the concrete to expand and contract, it will buckle laterally and destroy itself with time. Am not sure Dave Umahi includes expansion joints in his concrete roads. |
| Re: Quality Of Work Being Done On Lokoja-Abuja Road (Video) by 3seriez(m): 7:57pm On Jul 03 |
Looks like APC influencers don invade Nairaland. |
Lokoja-Abuja Expressway Flood: Advice For Motorists By FRSC • Panic As Petrol Queues Surface In Abuja Due To Flood On Lokoja Road. • 14 Passengers Die In Accident On Lokoja-Obajana Road (Photos) • 2 • 3 • 4
How Safe Are Our Railway Tracks In Nigeria? Abuja As A Case Study! • True Cost Of Living In Canada • Abia Goes Cashless For Green Shuttle Transport Buses (Photos)
