₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,325,330 members, 8,421,378 topics. Date: Saturday, 06 June 2026 at 10:49 AM

Toggle theme

Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) - Politics - Nairaland

Nairaland ForumNairaland GeneralPoliticsJonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) (5892 Views)

1 2 Reply (Go Down)

Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by Clerverly(op):
After 6years in Aso Rock, our dear son, Dr. Goodluck Ebele Uchechukwu Azikiwe has finally remembered his people(Ndigbo) by commissioning the elegant Map of Second Niger Bridge as a form of compensation for his failure to build the physical bridge for us!

Thank you Mr. President! Keep doing it till May 2015!

Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by 9inches(m): 1:23pm On Jan 18, 2015
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by Clerverly(op): 1:30pm On Jan 18, 2015
Thank you Mr. President for spending over 10Billion Naira on the designing of the elegant map!
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by Clerverly(op): 1:34pm On Jan 18, 2015
barcanista Gbawe, kel4soft, neenar, ,
descartes, egift, arewafederation, Egbagirl, donroxy,
Sweetlemon , donphilopus, BEREM, desola ,
demdem , lakpalakpa , whitecat007 , ,
lakpalakpa, omenka, ShehuAba , omenka , Rawani,
tribaleast kolaaderin soroptimist ,
and all Omexonomy, jmaine, mikeansy, Firefire,
Mynd44, , nduchucks, lacasa, baccaspace, Omerta
sincere9gerian, firefire, Phockphockman, ilugunboy,
naptu2, aussie, keneking, donmarti, keneking,
Dannyset, Evathyst, jaymichael
Ola6; Rossike, Truckpusher,
babyosisi , collynzo23; theassassin, jmaine,
Sunnybobo3, joehannibal,
Sincere9gerian, BlackTechnology, LeOstrich,
OLADD; biafranqueen; Tomakint;
phockphockman ;Mogidi; Jmaine; Jamace;
Atlwireless; Anonimi; Sunnybobo; Customized13;
Opiaoku; Petrov10; gramci; Taharqa;
Iamodenigbo; Arysexy; Descartes; Gh0stFreak;
Shizzlestar; ujoinme; rozayx5; chukwudi44;
wombraiders,mudraker, bishopjuice,
ghostfacekiller, chiefjusticefuk; firefire;
datolee; bloodykiller; ichidodo; ratiken;
dozzybaba; phockphockman ; longeria; anonimi;
aljharem; aryzgreat; publisher; brownlord; iconize;
rigarmortis; Descartes; pointb; pazienza; chukel xenten
OKDNigeria; stebell; brokenTV; ;longeria; rozayx5,
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by omenka(m): 1:44pm On Jan 18, 2015
This second Niger Bridge thingy has got to be the mother of all scam, after Subsidy of course!!

ROTFLMAO!! gringrin

He promised a bridge and commissions a map!! cheesy
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by Clerverly(op): 1:47pm On Jan 18, 2015
omenka:
This second Niger Bridge thingy has got to be the mother of all scam, after Subsidy of course!!

ROTFLMAO!! gringrin

He promised a bridge and commissions a map!! cheesy
The man dey use Igbos do yeye sha! cheesy grin
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by Nobody: 1:50pm On Jan 18, 2015
OP, THE IGBOS WILL STILL VOTE JONATHAN DESPITE YOUR BITTERNESS AGAINST JONATHAN.

GEJ HAS DONE MORE FOR THE IGBOS THAN OBASANJO , YARADUA AND OTHER ROGUE PRESIDENTS THAT HAVE RULED THIS COUNTRY.

THE ENUGU INTERNATIONAL AIRPORT IS STILL WORKING.

#GEJTHEMANTOVOTE
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by anonimi: 1:53pm On Jan 18, 2015
omenka:
He promised a bridge and commissions a map!! cheesy
Could it be that a semi-literate person who follows a daft old soldier would not know the ENGINEERING process involved in building a bridge and so expect that it can be commissioned the day after the START of the project is commissioned huh
I hope that is not your case as that would be really pathetic embarassed embarassed






Kai Buhari!!!
#Liberate-Lagos
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by jerflakes(m): 1:53pm On Jan 18, 2015
Yelloh
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by Firefire(m): 1:57pm On Jan 18, 2015
The Journey of a thousand miles begin with a step...


Slow and steady win the race.


Nigeria is moving on the right tracks but with FULL SPEED during the 2nd Term.


God bless you as you vote right.

Dr. Goodluck Jonathan 2011 - 2019
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by reborn1: 2:01pm On Jan 18, 2015
[s]
anonimi:
Could it be that a semi-literate person who follows a daft old soldier would not know the ENGINEERING process involved in building a bridge and so expect that it can be commissioned the day after the START of the project is commissioned huh
I hope that is not your case as that would be really pathetic embarassed embarassed






Kai Buhari!!!
#Liberate-Lagos
[/s]
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by reborn1: 2:01pm On Jan 18, 2015
[s]
Firefire:
The Journey of a thousand miles begin with a step...


Slow and steady win the race.


Nigeria is moving on the right tracks but with FULL SPEED during the 2nd Term.


God bless you as you vote right.

Dr. Goodluck Jonathan 2011 - 2019
[/s]

Trash.
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by Nobody: 2:02pm On Jan 18, 2015
GEj till May 29, 2015
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by camelus: 2:04pm On Jan 18, 2015
Facilities build up/mobilization

Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by waternogetemeny: 2:06pm On Jan 18, 2015
biafranqueen:
Which kinda bridge build in 4 years The test alone take 1 year.

Brooklyn Bridge
Construction started on January 3, 1870 completed in 1883.


This bridge is named after the King of Saudi Arabia, his highness, King Fahad. The bridge has four lanes and is a total of 8 kilometers long. The bridge was completed in the year 1986 after a total construction period of fifteen years. The construction cost around $1.2 billion. The bridge holds a significant importance in terms of trade and commerce between Bahrain and Saudi Arabia.

How many administrations worked on Third Mainland Bridge until it was completed in 1990
Thank u very much for this ur very wise post. They want the kind of bridge that will fall down and kill people like the interstate 35W bridge collapsed in Minneapolis United States of America, so dey can laugh.


One thing Ndiigbo can be sure of is that once that Bridge is completed, it will be solid and withstand the test of time.




[size=18pt]GEJ till 2019[/size]

Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by dre11(m): 2:08pm On Jan 18, 2015
If it can take 4 years to give the design of the bridge







Then am sure it will take another 35years to build the bridge
Because after I tried to draw the Gantt chart of scheduling of works to be done ........ I see that it will take 34years to put the bridge up there with the level at which work is going on there


So am forced to say this project is just a way to milk the nation
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by Firefire(m): 2:08pm On Jan 18, 2015
reborn1:
[s][/s]

Trash.
You need urgent deliverance cheesy
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by reborn1: 2:10pm On Jan 18, 2015
Firefire:
You need urgent deliverance cheesy
You are a fool, you need brain transplant.
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by Alphaoscar: 2:12pm On Jan 18, 2015
the bridge don enter voice mail.
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by Firefire(m): 2:12pm On Jan 18, 2015
reborn1:
You are a fool, you need brain transplant.
APC and abuse undecided

Enjoy your CHANGE...
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by Truth24(m): 2:12pm On Jan 18, 2015
Ignoramus thread...
Jonathan no finish am, na Buhari go gree come do am?
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by clevvermind(m): 2:15pm On Jan 18, 2015
Jonathan will complete what he has started. vote Jonathan for continuity.
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by reborn1: 2:16pm On Jan 18, 2015
Firefire:
APC and abuse undecided

Enjoy your CHANGE...
Ode, you paid goons are saint while anyone that support Buhari is evil. Thats your logic. Oponu
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by Nobody: 2:16pm On Jan 18, 2015
Hahahahah
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by camelus: 2:19pm On Jan 18, 2015
Inspection team

Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by Calculia: 2:21pm On Jan 18, 2015
Ongoing work...More reason to keep GEJ only him have shown this level of seriousness.
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by Firefire(m): 2:22pm On Jan 18, 2015
reborn1:
Ode, you paid goons are saint while anyone that support Buhari is evil. Thats your logic. Oponu
God bless you.

Happy Sunday tongue
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by reborn1: 2:23pm On Jan 18, 2015
Firefire:
God bless you.

Happy Sunday tongue
God bless u too.
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by Tolexander: 2:26pm On Jan 18, 2015
maybe the 2nd niger bridge is gonna be the Nigerian version of Egyptian Oct 6 bridge, only God knows!
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by rozayx5(m): 2:34pm On Jan 18, 2015
anonimi:
Could it be that a semi-literate person who follows a daft old soldier would not know the ENGINEERING process involved in building a bridge and so expect that it can be commissioned the day after the START of the project is commissioned huh
I hope that is not your case as that would be really pathetic embarassed embarassed


Kai Buhari!!!
#Liberate-Lagos
what did u expect from the illiterates slaves undecided
the imo river bridge GEJ built in my villa took 4 years plus
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by Donmarrius: 2:37pm On Jan 18, 2015
[s]
dre11:
If it can take 4 years to give the design of the bridge







Then am sure it will take another 35years to build the bridge
Because after I tried to draw the Gantt chart of scheduling of works to be done ........ I see that it will take 34years to put the bridge up there with the level at which work is going on there


So am forced to say this project is just a way to milk the nation
[/s]
Upon all the drugs you av' taking,your sense has yet normalized.
I av' called Dr. Olatunji Olapotopoto,you will go to him in the morning,so that,he will give you your remaining drugs.
Re: Jonathan Commissions The Completed Map Of Onitsha 2nd Niger Brigde (pic) by fyneguy: 2:38pm On Jan 18, 2015
Bla bla bla

Did it take IBB 6 years to design the 3rd Mainland Bridge?
1 2 Reply

Goodluck Jonathan Commissions 2nd Nkpogu Bridge With Wike (pics)Jonathan Commissions The Flyover Bridge At Kundila Roundabout, Kano - PhotosPresident Goodluck Inspects The 'completed Map' Of 2nd Niger Brigde. (pics)234

Difference Between So-called Moslem Moderates And ExtremistsNiger Delta Avengers List Out Terms And Condition For PeaceFirst Imo Tunnel And Propaganda Surrounding It. Enemies Of Progress.