direct lease : 3bedroom Pent Apartment With B.q @ Lekki Phase 1. N2.5m (see Pix) / The Making Of A Low Budget 5 Bedroom Duplex (with Costs) / Construction Pictures Of A 5 Bedroom Bungalow With A Pent House (2) (3) (4)

(1) (Reply) (Go Down)

Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 8:09pm On Sep 05, 2015
Hello house. Elfadconcept invites u on tour 1 of ongoing project. By Gods grace we r near completion. This project is at lekki phase 1 beside city lodge hotel elf bus stop.

Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 8:26pm On Sep 05, 2015
Foundation works completed and superstructure begins. Check out d soundness of d columns

Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 8:45pm On Sep 05, 2015
Foundation works completed and superstructure begins. Check out d soundness of d columns[color=#000099][/color]

Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 3:04pm On Sep 06, 2015
Block work on foundation completed. Decking/ 1st floor slab form work in progress

Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 3:09pm On Sep 06, 2015
Decking /1st floor slab, beams n supporting columns

Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 3:16pm On Sep 06, 2015
Kindly note d 3blocks on d beams. It increasing d head room hence improve / allows for better aeration. U can also observe d neat block setting which prevents waste of cement n mortal generally during plastering.
Electrical n plumbing piping completed hence waiting to cast d deck

Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 3:20pm On Sep 06, 2015
Deck cast began..

Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 3:30pm On Sep 06, 2015
Block work on 1st floor slab..

Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 3:33pm On Sep 06, 2015
Kindly tell mi if u tink d walls r not straight

Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 3:37pm On Sep 06, 2015
1st floor completed. Pent house completed.. Roof parapet in progress

Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 3:38pm On Sep 06, 2015
Roof parapet in progress

Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 3:41pm On Sep 06, 2015
Finishing n painting wow..

Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 3:46pm On Sep 06, 2015
Compare.. Would u say we did a gud job

Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 3:53pm On Sep 06, 2015
Site meeting completed. Everybody us happy.. Wait for completion date n hand over...

Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 4:00pm On Sep 06, 2015
Contact us at Elfad Concept. We Design We Build We maintain.. Trust us with ur space n we will advice on how u can make maximum use n benefit of ur land/space..
We pride in straight walls n angles. We pride in saving cost for ur constructuon.
Elfad concept
4 badaru str, off Adegoke str by alhaji meshia roundabout surulere.
070828266677; 08037217936
Delefadipe04@yahoo.com
Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by brabus(m): 4:38pm On Sep 06, 2015
Nice one!

1 Like

Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by befto: 10:01pm On Sep 16, 2015
elfadconcept04:
Site meeting completed. Everybody us happy.. Wait for completion date n hand over...

Fantastic job. Well done.
Who did you use for your roofing? How much did the paraphet cost?
Did you use step tiles aluminium or stone coated?
What type of wood was used for the roofing?

My site is currently halfway but may need you to help out with a few things
Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 5:40pm On Sep 27, 2015
we used aluminium for the roofing. it is concealed hence no need to use stone coated step tile.
for parapet i do precast. it is cheaper than to cast insitu. if u cast insitu, u will use 1, granite, 2, iron rod, 3, wood and plywood while all u need for precast is cement and sand, binding wire and nails..
i will do precast parapet for you at 4000 Naira per meter labor. you only buy the material(cement and a few bags of cement) to save some cost.
contact me so i can help u save some cost..
befto:


Fantastic job. Well done.
Who did you use for your roofing? How much did the paraphet cost?
Did you use step tiles aluminium or stone coated?
What type of wood was used for the roofing?

My site is currently halfway but may need you to help out with a few things
Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by brag3: 6:58pm On Sep 27, 2015
elfadconcept04:
we used aluminium for the roofing. it is concealed hence no need to use stone coated step tile.
for parapet i do precast. it is cheaper than to cast insitu. if u cast insitu, u will use 1, granite, 2, iron rod, 3, wood and plywood while all u need for precast is cement and sand, binding wire and nails..
i will do precast parapet for you at 4000 Naira per meter labor. you only buy the material(cement and a few bags of cement) to save some cost.
contact me so i can help u save some cost..
.

How much did the roofing cost (excluding the paraphet).
Which wood did you use?
Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by befto: 8:24pm On Jan 22, 2016
.
brag3:
.

How much did the roofing cost (excluding the paraphet).
Which wood did you use?
Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 11:31pm On Feb 10, 2016
I used oguruguru. It's anti termite. Due to d odour.
befto:
.
Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 11:37pm On Feb 10, 2016
Additional construction work. Deroof first floor roof and replace by Decking..

Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by elfadconcept04(m): 11:45pm On Feb 10, 2016
45cubic meter concrete cast using Ready mixed concrete. Cast done in 2hours as against using d entire day if u cast manually

Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by msogunro: 5:03am On Jun 03, 2016
elfadconcept04:
45cubic meter concrete cast using Ready mixed concrete. Cast done in 2hours as against using d entire day if u cast manually

Time is money and money is time. How much extra was paid to have the cement poured in 2 hours as opposed to all day manual work?
Re: Making Of Four Unit Attached Duplexes And A 3bedroom Pent Floor At Lekki Phase 1 by true2home(m): 4:34am On Jul 12, 2016
Good job there!. whats the rate for the Concrete truck and the rate for the Pump truck?

(1) (Reply)

For Your Wall Screeding And Pop Specialist In Nigeria / Urgent Sale 3 Big Shops Together At 51 Road Festac Call 08034489191 / The massive Exmas promo!!!!

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)