Lagos-ibadan Expressway Ready In 24 Months –fashola - Politics (3) - Nairaland

Nairaland Forum / Nairaland / General / Politics / Lagos-ibadan Expressway Ready In 24 Months –fashola (19582 Views)

Nigeria Lost 3000mw Of Electricity In The Last Six Months – Fashola / Babatunde Abisuga Jailed For 24 Months For Pension Scam / No Cattle Will Roam About In 24 Months – Buhari (2) (3) (4)

(1) (2) (3) (4) (5) (Reply) (Go Down)

Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by comos: 2:48pm On Feb 10, 2016
kunle75:



Keep shut joorrrr that one na road abi olohun jen gbadun................be honest to your self and stop been a fool

The part GEJ constructed is there for everyone to see.

How many meters have Fashola added since he assumed office ?

Propaganda won't work this time.
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by jgatherer(m): 2:50pm On Feb 10, 2016
comos:
Fashola should do the work not talking 9 months is already gone
Ahem...they only just got sworn-in in november, that's like 4 months

4 Likes

Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by Ikology(m): 2:50pm On Feb 10, 2016
Aufbauh:
When the people oriented government is in power you careless about the origin of those in power.
Imagine Nasarrawa Oweto-Otukpo road that was abandoned by the past administration when we have the No3 man David Mark as our own revered son for 8yrs in power, is now being priotize by a fulani man from a far away Daura even when our senatorial seat is still vacant in the red chamber.

If this road is done it will take a maximum of 2hrs 30mins to travel from Otukpo to Abuja against the present 4hr 30mins journey through Makurdi - keffi road.

Long live PMB
Long live Federal Republic of Nigeria!

Mumu Government is a continum, TSA, IPPS, Lagos-Ibadan expressway, National auto policy , Niger bridge etc

2 Likes

Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by comos: 2:52pm On Feb 10, 2016
jgatherer:

Ahem...they only just got sworn-in in november, that's like 4 months

Let fashola point out one single thing he has achieve within these months
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by Ephemmm: 3:01pm On Feb 10, 2016
comos:


maybe you are typing from your Oshogbo Village, because if you have pass through that road, you will see that it has been constructed from interchange to RCCG.

Tell your "ineffectual Fashola buffon" to start work and stop talking.

Is it not the same road I am passing through every-week? You can't just be sitting down in your erosion-inflicted hamlet and be generalizing. By the way, we are talking about Lagos-Ibadan Express Road for the past six years in which your ogogoro-drinking-ineffectual buffon has been in the helm of administration, and not Sagamu-RCC.

Use your brain dude!

1 Like

Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by anonimi: 3:08pm On Feb 10, 2016
HtwoOw:
I trillion naira debt owed to contractors ?? Na waah eeeeh

anyways , if this is coming from BRF I can take it to CBN to make withdrawals

We've seen what he did with Lagos and it is Marvelous


Have you actually seen what he did in Lagos?
Did you also see that he borrowed $1 billion for Toronto scrap metal trains since 2011 that are yet to be delivered in Lagos till tomorrow? shocked


Firefire:
Fellow Nairalanders, in response to Fashola comments below on not receiving enough support from the federal government to complete the Lagos light rail project.

[size=15pt]
"Fashola said all over the world, when cities and states build municipal rails like what Lagos is doing, their central governments support them morally and financially"[/size]


https://www.nairaland.com/2120455/cant-complete-lagos-light-rail

Few months ago same Fashola said this:


[size=15pt]Lagos: How We Spent N160bn World Bank Loan on Light Rail Project[/size]


The Lagos State Government yesterday justified the N160 billion it borrowed from the World Bank, noting that the fund was channelled to finance its light rail (blue line) project.

However, the state government expressed disappointment at the progress of the project, which it said, was not executed as smoothly as possible, but was optimistic of its completion.

The state Governor, Mr. Babatunde Fashola, said this shortly after inspecting the light rail terminus at the Orile-Iganmu part of the state alongside some members of the state executive council.

Speaking with journalists, Fashola said the project would have been completed in another 12 months despite that the project execution was not as smooth and speedy as he wanted it.

The governor raised questions on the intention of the federal government for publishing the state debt profile in the recent time, wondering what could have informed the decision to make it public.

He said: “I think it was the Debt Management Office of the federal government that published the report that we have a debt of about N160billion. I do not know the intent of the publication.

“But if it was to inform the public, I think we have always kept the public informed anytime we borrow money. If there are other intentions behind that, only those who make the publication would know what the intentions are.

“But you see, when people talk about debt of a state like Lagos, they forget that after Nigeria, South Africa, Egypt and one other country, we have the fifth largest economy in Africa.

“When you are talking of about a billion naira debt to a population of over 21 million people; because if you are measuring the debt, you also have to measure the responsibility. Those are the things people keep in isolation.”

He, therefore, explained that the state government already “has in place, strategies to repay the loan. The federal government was in the know of the state’s decision to take the bond and it approved it.”

[size=15pt]He added that the truth “is that what they do not also say is that no state in Nigeria can borrow money outside, from any multilateral agencies without the approval of the federal government.[/size]

“What they did not say is that they approved it. No state can raise money by bond the way we have done without the federal government’s approval. [size=18pt]Both SEC and NSE are all federal regulatory agencies through which we must pass. If they said okay, it means there must be something good about the debt.
[/size]


“Our rating as a state is the same as that of the Federal Republic of Nigeria, BB minus-stable with a positive outlook. We are the only state in Nigeria that has that rating. The first bond that was taken during my first tenure has been paid; the first tranche has been paid.

“I think the second tranche will be settled around 2016 or 2017. We are already making provisions. The provisions that will be there will be in excess of what is needed,” the governor said

Fashola expressed satisfaction on the progress of the light rail project, though decried the petty delay that was encountered as a result funding, saying the project would have should have been completed in another 12 months.

http://www.thisdaylive.com/articles/lagos-how-we-spent-n160bn-world-bank-loan-on-light-rail-project/188736/



eaglechild:
We can't complete Lagos light rail project

We obviously can't complete Lekki international phantom airport.

And you will be the biggest fool to think that we can complete Eko Atlantic.

Use your head people where do you think we are getting all the money we are using to sponsor Buhari undecided


www.nairaland.com/attachments/2079192_fasholaa_jpegfc425dbc9482db4d2098e4dd5e8bee75
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by anonimi: 3:12pm On Feb 10, 2016
Ephemmm:
Is it not the same road I am passing through every-week? You can't just be sitting down in your erosion-inflicted hamlet and be generalizing. By the way, we are talking about Lagos-Ibadan Express Road for the past six years in which your ogogoro-drinking-ineffectual buffon has been in the helm of administration, and not Sagamu-RCC.

Use your brain dude!


See this LIAR asking someone else to use his brain
What shall we not see on this NL from these bunch of propagandists?





Lagos-Ibadan road ongoing reconstruction @ 2014


Promhize:
M[b]y journey cut shut by about 30minutes[/b] from the usual.

Massive reconstruction is still on going.



www.nairaland.com/attachments/2161358_img20150226175513_jpeg2423aeba0f7cbff812cb86b8208c5305



www.nairaland.com/attachments/2161359_img20150226175539_jpegbc6a00ae4b27371d506d49406d0e541a



www.nairaland.com/attachments/2161387_img20150226175642_jpegf8db9fac0971f776c3703d5b2fc38ab6



www.nairaland.com/attachments/2161834_img20150223163722_jpeg10f5a86e8c134c1599016d3e62c4d09b
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by obasiken: 3:12pm On Feb 10, 2016
Ikology:


Mumu Government is a continum, TSA, IPPS, Lagos-Ibadan expressway, National auto policy , Niger bridge etc

10000 likes for you.
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by OAFMods: 3:19pm On Feb 10, 2016
comos:


It took GEJ 5 months to build that road from sagamu interchange to RCCG.

for 8 months your "ineffectual Fashola Buffon" has running aimlessly from pillar to post, blaming past Administration, banning importation of small generator and increasing electricity tariff.

he should work the talk. this is Nigeria, not Lagos.

Propaganda will fail him this time.

You parent can not be proud of you with this lame logic. Did Jonathan rule for just 5 months or are you insinuating he went dead for close to six years only to work on the road for just 5 months why not wait till buhari's four year to lament.

3 Likes

Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by OAFMods: 3:19pm On Feb 10, 2016
comos:


It took GEJ 5 months to build that road from sagamu interchange to RCCG.

for 8 months your "ineffectual Fashola Buffon" has running aimlessly from pillar to post, blaming past Administration, banning importation of small generator and increasing electricity tariff.

he should work the talk. this is Nigeria, not Lagos.

Propaganda will fail him this time.

Your parent can not be proud of you with this lame logic. Did Jonathan rule for just 5 months or are you insinuating he went dead for close to six years only to work on the road for just 5 months why not wait till buhari's four years to lament.

1 Like

Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by anonimi: 3:19pm On Feb 10, 2016
Aufbauh:
When the people oriented government is in power you careless about the origin of those in power.
Imagine Nasarrawa Oweto-Otukpo road that was abandoned by the past administration when we have the No3 man David Mark as our own revered son for 8yrs in power, is now being priotize by a fulani man from a far away Daura even when our senatorial seat is still vacant in the red chamber.

Is this not the same way that the Omo Onile, the letter-writing Agbaya of Owu abandoned Lagos-Ibadan express road for eight years of his wasted second chance civilian presidency until Jonathan came up to rehabilitate and expand the road?


President Jonathan Says Lagos-Ibadan Expressway Will Be Ready In 4 Years
JUL 05, 2013

President Goodluck Ebele Jonathan today disclosed that the reconstruction of the Lagos-Ibadan expressway was withdrawn from the Bi Courtney company due to evident non performance by the construction firm.

The road which is about 127.8 kilometers will cost N167 billion.






More from: http://saharareporters.com/2013/07/0...-pm-news-lagos
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by kunle75(m): 3:22pm On Feb 10, 2016
comos:


The part GEJ constructed is there for everyone to see.

How many meters have Fashola added since he assumed office ?

Propaganda won't work this time.


Mr Wailer just wait and see,i bet you will start singing a new song soon.
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by chudionu58(f): 3:28pm On Feb 10, 2016
kunle75:



Mr Wailer just wait and see,i bet you will start singing a new song soon.
that...?
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by comos: 3:30pm On Feb 10, 2016
Ephemmm:


Is it not the same road I am passing through every-week? You can't just be sitting down in your erosion-inflicted hamlet and be generalizing. By the way, we are talking about Lagos-Ibadan Express Road for the past six years in which your ogogoro-drinking-ineffectual buffon has been in the helm of administration, and not Sagamu-RCC.

Use your brain dude!

olodo !

at least the pix above have prove that you are a liar.

you think N15,000/month that APC is paying as an e-rat will take you anywhere.
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by kunle75(m): 3:31pm On Feb 10, 2016
anonimi:



See this LIAR asking someone else to use his brain
What shall we not see on this NL from these bunch of propagandists?





Lagos-Ibadan road ongoing reconstruction @ 2014





Oga go away with your pix jorrrrr you can t use this to cow us into believing that the entire is rehabilitated...............bro how many kilometer of the road have you snapped to show us here and lets know how much has been spent on that stretch of road been done so far.
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by omokab: 3:32pm On Feb 10, 2016
comos:



what has he achieve since he was appointed as a minister ?,
only to ban the importation of small generator and increase electricity tariff.

I am not surprise by your attack, because I know you are one of his numerous APC e-rats that he uses for his propaganda.
I don't know where you get your sense from. Ban of importation of small generator known as two stroke engine has been banned by NESREA since 2013. It is the responsibility of NESREA or ministry of environment not the responsibility of ministry of works or power.. So don't confuse people here.

2 Likes

Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by comos: 3:33pm On Feb 10, 2016
OAFMods:


Your parent can not be proud of you with this lame logic. Did Jonathan rule for just 5 months or are you insinuating he went dead for close to six years only to work on the road for just 5 months why not wait till buhari's four years to lament.

what about the Toronto scrap your " ineffectual fashola buffon" left after 8yrs

the red/blue railway lines still remains in pictures till date.

ZOMBIE
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by comos: 3:35pm On Feb 10, 2016
omokab:
I don't know where you get your sense from. Ban of importation of small generator known as two stroke engine has been banned by NESREA since 2013. It is the responsibility of NESREA or ministry of environment not the responsibility of ministry of works or power.. So don't confuse people here.

how come it was fashola that announce the ban to Nigerians
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by kunle75(m): 3:45pm On Feb 10, 2016
chudionu58:
that...?

that he his working and Nigeria is moving forward..............
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by Nobody: 3:45pm On Feb 10, 2016
Finally, for the 15th time! The neighboring states of Lagos and Ibadan have been existing in Nigeria for over 35 years now. Past administrations (let us start from 1999) also mentioned that they would work on one of Nigeria's most notorious roads, just like that each administration repeated the same thing. Now in 2016 another government has begun the same work on the same road, but we need another 2 years according to our minister.
Imagine the government understands that millions of people in the South West ply one of Africa's famous road every day. Every year Nigeria has recorded deaths, scores of deaths on this particular highway. The amount of lives that have died on this road is frustrating because some highly placed incompetent public servants cannot add 2 + 2 together.

It is because of a simple issue like this I believe for sure some of us are sheep!

Let us see if his definition of ready/completed will change after 24 months.
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by kunle75(m): 3:47pm On Feb 10, 2016
comos:


what about the Toronto scrap your " ineffectual fashola buffon" left after 8yrs

the red/blue railway lines still remains in pictures till date.

ZOMBIE


Bros stop fooling yourself and go to national theater orile iganmu in lagos all the way to trade fair along LASU okoko express way and see for your self na........stop giving wrong info here............

1 Like

Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by OAFMods: 3:51pm On Feb 10, 2016
comos:


what about the Toronto scrap your " ineffectual fashola buffon" left after 8yrs

the red/blue railway lines still remains in pictures till date.

ZOMBIE

It's now confirmed that you are brain dead. How does this corollate with your previous argument. I have no tutoring intentions today
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by comos: 3:52pm On Feb 10, 2016
kunle75:



Bros stop fooling yourself and go to national theater orile iganmu in lagos all the way to trade fair along LASU okoko express way and see for your self na........stop giving wrong info here............

Is any coach (train) running on those rail track at the moment ?
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by kunle75(m): 3:56pm On Feb 10, 2016
comos:


Is any coach (train) running on those rail track at the moment ?



When you visit the site you can come back here to tell the house the status of the project on ground before asking such question............go get your findings first.
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by comos: 3:57pm On Feb 10, 2016
OAFMods:


It's now confirmed that you are brain dead. How does this corollate with your previous argument. I have no tutoring intentions today

Ekpa !

The method fashola used in sinking Lagos into huge debt is being replicated, you are here telling me how it collaborate.

Monkey
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by comos: 3:59pm On Feb 10, 2016
kunle75:



When you visit the site you can come back here to tell the house the status of the project on ground before asking such question............go get your findings first.

project status after 8yrs ?

by now coaches (train) suppose to be running on those rail track.
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by Ephemmm: 4:26pm On Feb 10, 2016
anonimi:



See this LIAR asking someone else to use his brain
What shall we not see on this NL from these bunch of propagandists?





Lagos-Ibadan road ongoing reconstruction @ 2014



Even when it is obvious that the road has not been completed in your pics, you still have the reason to wallow in self-denial: I wonder how your brain functions.

Click here to see how your ineffectual Bufoon accepted failure on this project - http://thenationonlineng.net/lagos-ibadan-expressway-jonathan-admits-failure-begs-nigerians/

3 Likes

Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by Ephemmm: 4:28pm On Feb 10, 2016
comos:


olodo !

at least the pix above have prove that you are a liar.

you think N15,000/month that APC is paying as an e-rat will take you anywhere.

I don't know which picture shows the completed Lagos-Ibadan Express Road among the one you referred to: continue your unempirical wailing tongue tongue tongue
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by Ephemmm: 4:30pm On Feb 10, 2016
Okijajuju1:
[s]Why is the Federal Government wasting our money to build a highway to a Village that nobody lives in?


Is it because of Shoprite?[/s]

Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by Olamipapa(m): 4:38pm On Feb 10, 2016
comos:



what has he achieve since he was appointed as a minister ?,
only to ban the importation of small generator and increase electricity tariff.

I am not surprise by your attack, because I know you are one of his numerous APC e-rats that he uses for his propaganda.

Bro! you don smoke another weed bah? The guy gave you a sincere advise.
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by Ephemmm: 4:42pm On Feb 10, 2016
comos:


olodo !

at least the pix above have prove that you are a liar.

you think N15,000/month that APC is paying as an e-rat will take you anywhere.

See the failed promise of your Otueke drunkard. - http://www.pmnewsnigeria.com/2013/07/05/jonathan-lagos-ibadan-expressway-ready-in-4-years/

See how he admitted failure during his campaign - http://thenationonlineng.net/lagos-ibadan-expressway-jonathan-admits-failure-begs-nigerians/

Stop smoking please tongue tongue tongue
Re: Lagos-ibadan Expressway Ready In 24 Months –fashola by Yampotatocarrot(m): 4:42pm On Feb 10, 2016
Good works by Mr Fash.... But just like those lawmakers that complained, lemme add my own, what bout dualisation of Owerri - Aba road....... Onitsha to Enugu (don't know if its been done now)...... Also heard d Owerri-Portharcourt road z bad aside Obinze area constructed by Arab contractors..... What bout Aba - Portharcourt (nasty road)......... Abeg Fash, S.E z so small that d distance of d road from Makurdi to Abuja might b that of all these S.E roads put together #PUN INTENDED# All I'm saying z REMEMBER US IN THIS KINGDOM

1 Like

(1) (2) (3) (4) (5) (Reply)

Residents Scoop Fuel As Tanker Crashes Along Lagos-ibadan Road. Photos / Acho Ihim Defects To PDP / Some Nigerians Don’t Want Power Sector To Work – Minister Of Power, Adelabu

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)