Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by n3xt(m): 7:53am On May 23, 2016
segcymoor:
Partitioning wall for the units.........
MOORE-DESIGNBUILD LTD
.....we do structures right!
mooredesignbuild @gmail.com
Nicely done, Baba!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by DesBuild: 7:39pm On May 23, 2016
n3xt:
Nicely done, Baba!
Hey! D man of the people. How are u doing?
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 12:24pm On May 25, 2016
DesBuild:
Hey! D man of the people. How are u doing?
Hey! Man of the people..... How runs
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 6:15pm On May 25, 2016
Finishing touches!

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 7:12am On May 26, 2016
segcymoor:
Finishing touches!

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 7:31am On May 27, 2016
Tastefully finished terrace house now available for sale!

*4Bedroom with attached BQ
*Ample parking
*Serene environment
*Good paved road to the site
*Easy accessibility..... Just by the chevron toll gate
*Approved plan with Cosent

50m only!

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Chekitaut: 9:03am On May 27, 2016
Beautiful works from a wonderful engineer.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 6:25pm On May 27, 2016
Chekitaut:
Beautiful works from a wonderful engineer.
Bro...no be small things

-------------------
Na thorough attention to details
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Chekitaut: 8:30pm On May 27, 2016
Still available
Chekitaut:
OFFER while STOCK last
Buy GRANITE from us, get Cement @ N1,450-N1,500/bag

Call: 08055545355
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 12:17pm On May 28, 2016
Moulding of interlocking

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 7:48am On May 30, 2016
Happy Holiday!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 11:50am On May 31, 2016
segcymoor:
Moulding of interlocking

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 12:29pm On Jun 01, 2016
Construction of inspection chambers

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 12:30pm On Jun 01, 2016
segcymoor:
Construction of inspection chambers

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op):
In terms of quality delivery......





--------------------------------------------------
We surpassed everyone of them shocked

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Onuokwu: 7:27pm On Jun 01, 2016
Its been a beautiful 3.5 years journey.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 7:25am On Jun 02, 2016
Onuokwu:
Its been a beautiful 3.5 years journey.
---------;----
and we won't let you down!

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Nobody: 9:58am On Jun 02, 2016
@segcymoor Can you please Call Baba at egbeda, He want to talk with U.?
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by jodeci01: 12:45pm On Jun 02, 2016
segcymoor:
1-First 6 terrace building was completed at the figures of 120m

2-The 8 units blocks of flat gulp 120m

3.........and this particular 9 terrace house is expected to be completed at 150m in less than 4 months away!


For more enquiry-mooredesignbuild@gmail.com
08091110234


MOORE-DESIGNBUILD LTD

--We actually do structures right!
Apologies for digressing, but is cost of land inclusive in 9 terrace house? Thanks!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 3:21pm On Jun 02, 2016
jodeci01:
Apologies for digressing, but is cost of land inclusive in 9 terrace house? Thanks!
Bros no be so o.Land alone na 140m
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 6:05pm On Jun 02, 2016
Tritri:
@segcymoor Can you please Call Baba at egbeda, He want to talk with U.?
Ok
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 6:05pm On Jun 02, 2016
Tritri:
@segcymoor Can you please Call Baba at egbeda, He want to talk with U.?
Ok......
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 6:05pm On Jun 02, 2016
Tritri:
@segcymoor Can you please Call Baba at egbeda, He want to talk with U.?
Ok..............
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 9:48am On Jun 03, 2016
Finishing Target....

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 5:58pm On Jun 03, 2016
Getting. Closer.....

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 8:36am On Jun 06, 2016
Completed stanchion!

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 10:45pm On Jun 06, 2016
Kitchen. Cabinet

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 10:27am On Jun 08, 2016
View

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 7:12am On Jun 10, 2016
Construction of inspection Chamber

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 6:15pm On Jun 12, 2016
Water supply pipe

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(op): 6:17pm On Jun 12, 2016
segcymoor:
Water supply pipe

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by cleric(m): 7:03pm On Jun 12, 2016
segcymoor:
Tiling on step

____
steeping up in style
Your tiler is very good.
1 2 3 ... 54 55 56 57 58 59 60 ... 110 Reply

PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKIPILE FOUNDATION FOR TERRACE BUILDING AT LEKKIConstruction Process Of A Wing Duplex+flat At Ajah234

Ceiling POP Designs For Your HousePrices For These PaintsProfessional Aluminum Windows, burglary proof, security Gate & Doors(Photos)