My House Project Up To Living Level - Properties (3) - Nairaland

Nairaland ForumNairaland GeneralPropertiesMy House Project Up To Living Level (18893 Views)

1 2 3 4 Reply (Go Down)

Re: My House Project Up To Living Level by bogolobango(m): 11:04am On Jul 09, 2016
@Kabeeru Whats d cost of d land nd location
Re: My House Project Up To Living Level by archdon: 11:06am On Jul 09, 2016
umehmj:
Wow congrats op. I tap into your grace and soon i will sing your song too.


Going to site this year
Lovely, can u upload the floor plan
Re: My House Project Up To Living Level by umehmj(m): 11:18am On Jul 09, 2016
archdon:
Lovely, can u upload the floor plan
drop your mail and I'll send it asap
Re: My House Project Up To Living Level by stonecoldcafe: 11:34am On Jul 09, 2016
Kabeeru:
To the glory of God, am moving in to my house today. The house has been completed to level at which I can boldly call myself a landlord. I followed some trends on this platform that really helped me, and to tell u that its not always has speculated in some quarters that it costs exorbitantly to build a house, no it is not. Although the location of the site determine the costs of materials and workmanship, but thorough supervision without wastages would surely safe cost. This 3bedroom flat cost almost 5million naira together with cost of land, approval and german floor. External work like fence, flooring/interlock, external decorations are the work left to be done to make it a fully completed 3bedroom flat.

All glory belongs to GOD ALMIGHTY.

Check out the pictures below
Shine on bro. Congrats
Re: My House Project Up To Living Level by symbianDON(m): 11:56am On Jul 09, 2016
umehmj:
drop your mail and I'll send it asap
I won't mind the floor plan too. thanks. shadeontop@yahoo.com
Re: My House Project Up To Living Level by GLOBALINF: 12:10pm On Jul 09, 2016
Soon mine will be completed
Re: My House Project Up To Living Level by Arijude(m): 12:12pm On Jul 09, 2016
Woooow!!!!! Congratulations. I'm very happy for you mehn!!
Re: My House Project Up To Living Level by Kabeeru(op): 12:32pm On Jul 09, 2016
I really thank and appreciate everyone, and pray you shall all be congratulated very soon, amen.

To wailing wailers, the last pix was b4 plastering and its d side view and not back. The land cost 350K located in Oyo city. The costs up to this level is not up to 5million. I didn't hold any political or office designation to warrant fear of EFCC. This is to encourage individuals that you can build with little income
Re: My House Project Up To Living Level by marygold(f): 12:32pm On Jul 09, 2016
Congratulations
Re: My House Project Up To Living Level by ganie(m): 12:35pm On Jul 09, 2016
Did u say #5mhuh
Re: My House Project Up To Living Level by Kabeeru(op): 12:36pm On Jul 09, 2016
This is d floor plan

Re: My House Project Up To Living Level by Kabeeru(op): 12:40pm On Jul 09, 2016
The side view after plastering

Re: My House Project Up To Living Level by titane: 1:02pm On Jul 09, 2016
mindfreaks:
Lier the windows of the last house not same as the


















First house!
stop hating bro. you need love OK. Jesus loves you
Re: My House Project Up To Living Level by johnson1111: 1:24pm On Jul 09, 2016
Congratulations bro.pls,can u let the house know d total amount u spent on your town planning approval. Thanks
Re: My House Project Up To Living Level by westim(m): 1:50pm On Jul 09, 2016
Congrats, I will have same testimony by next year IJN. Congrats once again
Re: My House Project Up To Living Level by archdon: 1:57pm On Jul 09, 2016
umehmj:
drop your mail and I'll send it asap
akinoyeyele@gmail.com thanks
Re: My House Project Up To Living Level by Motunmi: 2:36pm On Jul 09, 2016
Kabeeru:
The side view after plastering
Congrats Sir. God will continue to increase you on every side.

Pls what type of roof did you use and what is the cost of the roofing in total?

Thank you.
Re: My House Project Up To Living Level by ngaal7: 2:55pm On Jul 09, 2016
Kabiru,
Where is this property situated? Lagos or other state?
Re: My House Project Up To Living Level by folhenrry4flizzy(m): 3:21pm On Jul 09, 2016
No
Kabeeru:
To the glory of God, am moving in to my house today. The house has been completed to level at which I can boldly call myself a landlord. I followed some trends on this platform that really helped me, and to tell u that its not always has speculated in some quarters that it costs exorbitantly to build a house, no it is not. Although the location of the site determine the costs of materials and workmanship, but thorough supervision without wastages would surely safe cost. This 3bedroom flat cost almost 5million naira together with cost of land, approval and german floor. External work like fence, flooring/interlock, external decorations are the work left to be done to make it a fully completed 3bedroom flat.

All glory belongs to GOD ALMIGHTY.

Check out the pictures below
Congratulations bro.
Re: My House Project Up To Living Level by bensowe(m): 3:21pm On Jul 09, 2016
Menh! I love this
Re: My House Project Up To Living Level by currentbrands(m): 4:49pm On Jul 09, 2016
Congratulations my broda!......I tap into ur success story and grace by d end of 2016, IJN Amen!!

Kindly send me the floor plan: currentbrands@gmail.com

Thanks!
Re: My House Project Up To Living Level by bplenty(m): 5:17pm On Jul 09, 2016
Congratulations @kabeeru. You have done well. Ile atura o. Amin.
Re: My House Project Up To Living Level by Nobody: 5:44pm On Jul 09, 2016
aao:
Congrats on the house , but I have reservations on the cost of putting it up to this stage which u mentioned it's not up to 5 m.

Even if the land was 100k, cost of German floor, setting up blocks, roofing, plastering both inside and outside, Aluminium Windows , POP and tiles, plumbing and electrical work, tiling, and those accessories ... I'm sure u r just being modest with this figure cos it would cost way more than that. Not to mention cost of approvals etc
You're absolutely correct. There's no way this is N5m unless OP is getting free stuff.

Someone that said similar before later fessed up that he had work done by his Father In Law and church members for free.

My problem with this stuff is that it sets up others with unrealistic goals. That's nothing less than N10m there.
Re: My House Project Up To Living Level by Femonjay(m): 5:49pm On Jul 09, 2016
Congrats Op, please remember to fumigate in and sourrounding before moving in.
Re: My House Project Up To Living Level by janejive(f): 8:01pm On Jul 09, 2016
congratulations!
Re: My House Project Up To Living Level by dioman: 8:23pm On Jul 09, 2016
Congratulation bro, I love your roofing style. Bravo...
Re: My House Project Up To Living Level by 4nobody4every1: 8:26pm On Jul 09, 2016
EgunMogaji:
You're absolutely correct. There's no way this is N5m unless OP is getting free stuff.

Someone that said similar before later fessed up that he had work done by his Father In Law and church members for free.

My problem with this stuff is that it sets up others with unrealistic goals. That's nothing less than N10m there.
You are spot on EgunMogaji, the 3 unit , 3 bed room flat l completed recently in lagos, as at the last count, l spend over 27 million Naira on the 3 unit project, that is what l was able to document because l was not able to keep track of all my expenses, each 3 bedroom unit en-suit cost me over 9 million Niara each, initially l thought it was less but my Uncle who is a Chartered accountant sat with me and we were able to arrive at over 27 million Naira , we started documenting my expenses from the window level, l did DPC on all the buildings, shipped several gadget to Nigeria for the finishing plus the once we bought in lagos.
Re: My House Project Up To Living Level by Nobody: 8:54pm On Jul 09, 2016
congratulations
Re: My House Project Up To Living Level by deji47:
umehmj:
drop your mail and I'll send it asap
Thanks a bunch. God bless you abundantly.
Re: My House Project Up To Living Level by Kabeeru(op): 9:51pm On Jul 09, 2016
[quote author=johnson1111 post=47365520]Congratulations bro.pls,can u let the house know d total amount u spent on your town planning approval. Thanks

The land measured at 60" by 120" and was registered b4, only did change of title(names) with 35K, architectural design cost 30k cos it is 2 building on d land, one 3bedroom and 2bedroom.
Town planning approval cost 30K then
Re: My House Project Up To Living Level by archdon: 6:57am On Jul 10, 2016
aao:
Congrats on the house , but I have reservations on the cost of putting it up to this stage which u mentioned it's not up to 5 m.

Even if the land was 100k, cost of German floor, setting up blocks, roofing, plastering both inside and outside, Aluminium Windows , POP and tiles, plumbing and electrical work, tiling, and those accessories ... I'm sure u r just being modest with this figure cos it would cost way more than that. Not to mention cost of approvals etc
It's possible cos of the location, I help my Bro with his two bedroom in ilorin plus the land cost roughly 3 Mill, so for a 3bd in his location with proper management I'll say yes it's possible.

Compare to Abj, 5mill is just enough to get u a 700sqm of land and building a 3bd will cost u north of 15mill