Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,167,005 members, 7,866,802 topics. Date: Friday, 21 June 2024 at 05:37 AM

Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) - Politics (4) - Nairaland

Nairaland Forum / Nairaland / General / Politics / Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) (43900 Views)

Fayose Inspects Ongoing Work At Ado Ekiti Flyover(pics) / 7 Roads Fashola Is Inspecting On His South East Tour. / Amaechi Visits Plateau, Inspects Ongoing Work At Heipang Inland Dry Port, Jos (2) (3) (4)

(1) (2) (3) (4) (5) (6) (Reply) (Go Down)

Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by Tiegarr: 9:34am On Jul 13, 2016
otitokoroleti:
I think dat op is high on expired tramadol soaked in regal dry gin for giving credit to fashola on lagos-ibadan expressway. I passed that road twice a week infact I just returned from Lagos less than 2hrs today. GEJ awarded the contract & the work was going smoothly until bubu destabilized everything which makes work stop. Though RCC is back to work for the construction but they now use equipment & man power lesser than what we see during GEJ days
You are just plain old stoopeed...Plain old stoopeed and a pathological liar...

1 Like

Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by benitwater(m): 9:35am On Jul 13, 2016
Love Machine:
Why is there no light?I think this is a road construction carried out by previous administration.
seems its been long u pass that that express.
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by otitokoroleti: 9:35am On Jul 13, 2016
jaybee3:


I'm also at work doing something probably more mental tasking than yours so try multitasking would ya?

I have itchy fingers and a strong desire to have you schooled
lol, u r too small 4 me to engage in an argument bcoz u r nt up to the task.
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by otitokoroleti: 9:38am On Jul 13, 2016
Tiegarr:
You are just plain old stoopeed...Plain old stoopeed and a pathological liar...
I dont engage 'apoda' in arguments. ur quote shows ur level of reasoning eleyi ti o kere si ti adiye
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by jaybee3(m): 9:40am On Jul 13, 2016
otitokoroleti:
lol, u r too small 4 me to engage in an argument bcoz u r nt up to the task.

What exactly do you do bro?

I have your time today
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by kayo80(m): 9:40am On Jul 13, 2016
bloodyBLOGGER:
Honestly, the lightning my area dey hardly blink these days. I believe we have wailers living in my area, but they will never admit it. Maybe nepa don cut their wire.grin

Abi o! lol! But really, the light has really improved in my area. I am even scared of it. lol! It goes for one hour and it is back on. By the way, I live in Ibadan.
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by tete7000(m): 9:41am On Jul 13, 2016
Love Machine:
Why is there no light?I think this is a road construction carried out by previous administration.


An ongoing work started by the last administration. As per the light, only Fasola fit answer your question but my own light don dey steady small; I just dey pray make e remain like that or make e beta pass self.
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by Reptyle(m): 9:41am On Jul 13, 2016
Some people want us to ascribe every good thing happening under this government to the good work of the past administration of President Jonathan.

Conversely, we are expected to believe that everything wrong with the nation today was birthed under the watch of the current administration.

Warped sense of reasoning if you ask me.
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by omonla555: 9:41am On Jul 13, 2016
NextGovernor:


That's d problem with you people. Always trying to paint any critics as IPOB.
1. I am not a Ibo man
2. You don't know me rather do I know you
3. I have traveled offshore countless times. So lagos isn't a big deal
4. Don't just insult everybody you see online just because data is cheap.
5. That's all I have to say.

Wailer crying admitting himself a local from Abia crossing to Benue those axis.
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by buchilino(m): 9:41am On Jul 13, 2016
chie8:
Fashola is really working.Here are pictures of the update of ongoing works on Lagos-Ibadan expressway,section 11,Shagamu-Ibadan carriage way

Photo Credit: APC News TV

Source: http://www.trezzyblog.com/2016/07/update-of-on-going-work-on-lagos-ibadan.html

LIKE SERIOUSLY?, ONE ROAD N FASHOLA IS WORKING?. I MEAN SERIOUSLY?
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by Nobody: 9:50am On Jul 13, 2016
diegwu01:
Fashola, quietly silencing the wailing bunch, very soon they would dig up one N500million Borehole story
Just see how my AC just dey injure me for my House #uninterrupted
Uninterrupted power supply ? undecided
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by Nobody: 9:52am On Jul 13, 2016
Love Machine:
Why is there no light?I think this is a road construction carried out by previous administration.
and also completed by previous administration? Yeye talk
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by MIM77(m): 9:56am On Jul 13, 2016
otitokoroleti:
I think dat op is high on expired tramadol soaked in regal dry gin for giving credit to fashola on lagos-ibadan expressway. I passed that road twice a week infact I just returned from Lagos less than 2hrs today. GEJ awarded the contract & the work was going smoothly until bubu destabilized everything which makes work stop. Though RCC is back to work for the construction but they now use equipment & man power lesser than what we see during GEJ days

The entire Capital vote for the Federal Ministry of Works in 2015 Appropriation Act was N19, 812, 000, 000 (Nineteen Billion, Eight Hundred and Twelve million Naira). With this meager money for capital projects, little or nothing was paid to the contractor handling Lagos-Ibadan expressway, so they left site because of paucity of funds not that Bubu stopped them. Stop misinforming people because of unhealthy sentiments and gather your information before you talk on an issue. Visit www.budgetoffice.gov.ng and click on Appropriation Act 2015 to confirm the above figure and make your judgement on why so many projects naturally stopped during the 2015 budget year, bearing in mind that the projected revenue for FG was short by not less than N600, 000, 000, 000 (Six Hundred Billion Naira) because of the sharp drop in the oil price. The Projected oil price per barrel based on the 2015 budget was 53 dollar/barrel and between August 2015 and March, 2016 the highest oil price per barrel was 48.86 dollars and the lowest was around 28 dollars (Average drop in price was nothing less 10 dollars/barrel in 8 months). visit www.cbn.gov.ng, click on Statistics and thereafter 'crude oil price'. for oil prices/per barrel for 2015.

2 Likes 1 Share

Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by seguno2: 9:58am On Jul 13, 2016
shivi:
i know for sure my BRF will deliver,he has done it before....sit back relax and watch

Please do you mind explaining what he did before?
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by obailala(m): 10:00am On Jul 13, 2016
sammhi:
Fasola and propaganda is like bread and butter
Road that was about 60% c ompleted by the time GEJ was leaving last year
It was abandoned for over a year ....
I just tire for our primitive politics
sammhi:

You are a big liar..
OBJ awarded the road to Babalakin his friend who built the 2nd Airport terminal in Ikeja ..the man could not execute the project as he had no Moni..it even became a court case
GEJ awarded that road again after out of court settlement with Babalakin....
Please I know you hate GEJ but he was the one that awarded that road to RCC and Julius Berger in 2014...
The work is about 60% completed...
I go to Ibadan on a monthly basis ....you are a paid agent ..am not..so I will say the truth
This is the second time you have loosely regurgitated this your 60% figure. Abeg tell us where and where in the road was completed for you to keep yapping this 60%?

A project was estimated to cost N167billion, only N25billion was released in 2014, and a further N25billion which was promised in 2015 was never paid, forcing contractors to abandon the job. Now the 2016 budget already released N50billion for this project, this amount being the balance owed contractors for the extra work done, and for the contractors to proceed on the project. Now you come here singing 60% 60%? Kindly explain please?

Now let us even assume 60% of the job was even done or even 100%, how much of the entire job was paid for by the last admin?... N25bn out of N167bn and you come here to yap rubbish about last admin?... undecided

2 Likes

Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by damocool(m): 10:03am On Jul 13, 2016
.
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by damocool(m): 10:03am On Jul 13, 2016
otitokoroleti:
I think dat op is high on expired tramadol soaked in regal dry gin for giving credit to fashola on lagos-ibadan expressway. I passed that road twice a week infact I just returned from Lagos less than 2hrs today. GEJ awarded the contract & the work was going smoothly until bubu destabilized everything which makes work stop. Though RCC is back to work for the construction but they now use equipment & man power lesser than what we see during GEJ days

That's not true bro, infact, the fear of Buhari’s wrath got them back on site..

1 Like

Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by obailala(m): 10:07am On Jul 13, 2016
MIM77:


The entire Capital vote for the Federal Ministry of Works in 2015 Appropriation Act was N19, 812, 000, 000 (Nineteen Billion, Eight Hundred and Twelve million Naira). With this meager money for capital projects, little or nothing was paid to the contractor handling Lagos-Ibadan expressway, so they left site because of paucity of funds not that Bubu stopped them. Stop misinforming people because of unhealthy sentiments and gather your information before you talk on an issue. Visit www.budgetoffice.gov.ng and click on Appropriation Act 2015 to confirm the above figure and make your judgement on why so many projects naturally stopped during the 2015 budget year, bearing in mind that the projected revenue for FG was short by not less than N600, 000, 000, 000 (Six Hundred Billion Naira) because of the sharp drop in the oil price. The Projected oil price per barrel based on the 2015 budget was 53 dollar/barrel and between August 2015 and March, 2016 the highest oil price per barrel was 48.86 dollars and the lowest was around 28 dollars (Average drop in price was nothing less 10 dollars/barrel in 8 months). visit www.cbn.gov.ng, click on Statistics and thereafter 'crude oil price'. for oil prices/per barrel for 2015.
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by adeoba2008(m): 10:08am On Jul 13, 2016
Berger has stopped work on this road. I passed through this road day before yesterday. It was only RCC that is working. A section of the long bridge was blocked but Julius berger and their trucks were nowhere to be found.
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by naxman(m): 10:10am On Jul 13, 2016
Read the chats between Lagos and Kogi state.,
Kogi: Good morning,
Lagos: Kogi, how are you ?,
Kogi: Not too fyn oh,
Lagos: what happened ?,
Kogi: Banks, School, workers notin is workn,
Lagos: Why?,
Kogi: Bag Government,
Lagos: How?,
Kogi: From Bad gvtmnt to Worst govt.,
Lagos: Hay!,
Kogi: I want to make a request from u pls,
Lagos: ok,
Kogi: Do u av any Ambode that you r nt using
for nw?,
Lagos: why did u ask?,
Kogi: to come n help us in kogi.,
Lagos: chey! ur people say Audu na bad man
dat yr?,
Kogi: We dnt no he is d best den,
Lagos: You neva see anytin Yet.
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by Antina(f): 10:21am On Jul 13, 2016
Jaraworldsms:
He should also help us here in Cross River. Our people are dying of road accident due to the deplorable condition of the federal roads. We now spend 9 hrs travrlling from calabar to Uyo instead of 45 min drive.

9 hours ke?
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by tivta(m): 10:21am On Jul 13, 2016
So anyone who doesn't support the government is a wailer? The government should just deliver on its promises, like they say " action speaks louder than words" All Nigeria needs is light for manufacturing companies to perform, businesses to grow, NDA did not cause the power problem cause when yaradua gave amnesty there was still power outage. He should prove that providing power is not rocket science and silence the opposition forever...
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by rhymaholic: 10:22am On Jul 13, 2016
This is long overdued. Work should be going on simultaneously in all states of the federation.
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by janefarms2015: 10:22am On Jul 13, 2016
jaybee3:


Some have brain but sadly it's otherwise porous
my guy, ds bashing too much oo!
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by 8BitGee(m): 10:24am On Jul 13, 2016
jaybee3:


I fvcking hate it when ijiots drop opinion as fact on public forum.

Now explain how lagos state's IGR could have remotely transformed the state's infrastructure to a comparable standard as that of the Whole United Kingdom


IKR. Utterly silly thing to say. These guys pull facts from their bottoms. Fvcking twats.
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by solaere(m): 10:25am On Jul 13, 2016
Jaraworldsms:
He should also help us here in Cross River. Our people are dying of road accident due to the deplorable condition of the federal roads. We now spend 9 hrs travrlling from calabar to Uyo instead of 45 min drive.
frnd u beta advice ur pple not to travel again as all this project u see are wrks of the past admin,APC of dis certific8less pmb is doing nothing so fashola hardly can help u for now...can't u see that only his ministry seems progressing becux all of the wrks he's duin as already been founded by the formal administrative...which is GEJ tenure...
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by solaere(m): 10:26am On Jul 13, 2016
He should also help us here in Cross River. Our people are dying of road accident due to the deplorable condition of the federal roads. We now spend 9 hrs travrlling from calabar to Uyo instead of 45 min drive.[/quote] frnd u beta advice ur pple not to travel again as all this project u see are wrks of the past admin,APC of dis certific8less pmb is doing nothing so fashola hardly can help u for now...can't u see that only his ministry seems progressing becux all of the wrks he's duin as already been founded by the formal administrative...which is GEJ tenure...
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by Omonigeriarere: 10:32am On Jul 13, 2016
otitokoroleti:
Am on my way to Lagos on the day of flag off & it was stated that the work will complete by 2018, theres no where 2015 was mentioned on that day but if you have link where such was mentioned please provide the link.

Please when did the work start on this road?
Re: Ongoing Work At Lagos-ibadan Expressway. Fashola Is Working (Pics) by oshaosha2014(m): 10:35am On Jul 13, 2016
The man is not over hyped.. Federal level no be beans. Mind you, as Lagos governor he was the oga handing down orders to his subordinates. The story is different now. He is ordered around and Lagos is not as big as the whole Nigeria; he maybe be active somewhere and other places may not even smell him.
NextGovernor:
No hate. I believe that Fashola guy was overhyped by Lagosians and also there media propaganda.

1 Like

(1) (2) (3) (4) (5) (6) (Reply)

FG Rejects Governors’ N22,500 Minimum Wage Proposal / Ex-Governors Umahi, Wike, Akpabio Visit President Tinubu Today / Ben Obi's Outfit To Nigeria & Argentina Match In Russia. Photos

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 54
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.