Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 10:12pm On Aug 31, 2016
msogunro:
Olorunda Estate?

Would love to stop by if you're still working on the site in December.
Absolutely. The carcass should be completed by 2nd week of next year



-------
A lot of time is expected to be spend on foundation.... It's mandatory we got it right from the onset!
Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 6:58am On Sep 01, 2016
12mm stirrup on 16mm rebar

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 12:42pm On Sep 01, 2016
Observing team

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 3:10pm On Sep 01, 2016
Boring process

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by Nobody: 11:28pm On Sep 01, 2016
segcymoor:
--Alapere to be precise. Just behind that big Apostolic church before toll gate

-Yeah, I will shortly

-yeah. U mean this,? Na so we wan do am
Na that apostolic church for lagos ibadan expressway before you divert to ikorodu road?
Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 7:46am On Sep 02, 2016
segzy14:
Na that apostolic church for lagos ibadan expressway before you divert to ikorodu road?
Na soo



------
U be real Lagos boy grin
Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 1:21pm On Sep 02, 2016
mavverick:
Yes this is what i mean.
But how is it different to typical non-framed structure, is it that being framed means more pillars ?

So what is common in Western countries is that the ground floor/basement will have these pillars exposed, as this is usually where the parking area is, and the frames/pillars rise up, they then sometimes use metal partitioning/100 mm insulation boards and fire rated plaster board to form up the walls. Some use brick finish with 100mm spacing in between 2 setting of bricks for insulation.

Apart from standard blocks, is there a lightweight alternative for partitioning the walls.
Not different much. All d pillar size will be d same.
However, frame structure is purely approach structurally
D actual sizes of d columns as specified in d structural details is being completed. (No interference with blocks.



------
Note: It is technically and financially involved
Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 6:45pm On Sep 02, 2016
Larwin:
Compared to some areas like ibeju, Lekki u mean? Sir on what basis is ds generalization?
Nature of d soil na
Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by Larwin(m): 8:14pm On Sep 02, 2016
segcymoor:
Nature of d soil na
Ride on sir, we r with you smiley
Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 10:46pm On Sep 02, 2016
Men at work.......

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 10:50pm On Sep 02, 2016
Team work.......

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 10:48am On Sep 03, 2016
Our concept.

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 5:10pm On Sep 03, 2016
Points!

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 10:47pm On Sep 03, 2016
Concrete mixing: Grade 25!

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 10:51am On Sep 05, 2016
Rebar ......

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 6:03pm On Sep 05, 2016
Activities in progress

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by olumide4christ: 6:49pm On Sep 05, 2016
Hi Segcymoor, hope you didn't encounter any Omonile wahala here...if no or yes, please share how you went about it.

Thanks.
Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 12:55pm On Sep 06, 2016
olumide4christ:
Hi Segcymoor, hope you didn't encounter any Omonile wahala here...if no or yes, please share how you went about it.

Thanks.
Well, d area happened to be client root. So no disturbances
Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 6:22pm On Sep 06, 2016
Late working due to some challenging

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 7:45pm On Sep 07, 2016
Typical points

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by olumide4christ: 8:37pm On Sep 07, 2016
segcymoor:
Well, d area happened to be client root. So no disturbances
Okay. That's great. Those are the kind of projects we look forward to....free from Omonile wahala.
Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 7:34am On Sep 08, 2016
Observe d building at d background...... Tilting due to poor pilling done. It is still under construction for less than a year






------
We intend to load 2 suspended floors on this foundation: our target is to stand d test of time


MOORE-DESIGNBUILD LTD.....we do structures right!

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by Laggie(m): 10:32am On Sep 08, 2016
Rebar/TMT bar/reinforced iron bar/debar in ready stock
6mm in 6meter   835pcs/mt
6mm in 12meter 418pcs/mt
8mm in 6meter  440pcs/mt
8mm in 12meter 220pcs/mt
10mm in 6meter 280pcs/mt
10mm in 12meter 140pcs/mt
12mm in 6meter  190pcs/mt
12mm in 12meter 95pcs/mt
Contact : Laggie Wang
whatsapp:+86-15232722668
skype: Laggiewang
LGWSTEEL@163.COM

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by Chekitaut: 3:55am On Sep 10, 2016
Granite Price = N2,800/ton(Transportation excluded)
Cement = N2,200/Bag minimum 300Bags

Contact Us Now
08055545355, 08032887233, 08025392536, 08098055224
Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 3:51pm On Sep 10, 2016
Chekitaut:
Granite Price = N2,800/ton(Transportation excluded)
Cement = N2,200/Bag minimum 300Bags

Contact Us Now
08055545355, 08032887233, 08025392536, 08098055224
We don hear
Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 8:36am On Sep 14, 2016
Bakkah dah sallah





_______
Back to action!!!
Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 8:18pm On Sep 14, 2016
Boring process

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 10:38am On Sep 16, 2016
Reinforcements

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 1:03pm On Sep 19, 2016
Deep foundation activities in progress

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 3:57pm On Sep 21, 2016
Rounding up on pilling

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by segcymoor(op): 6:48pm On Sep 22, 2016
Inserting d reinforcements

Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by P291: 11:19pm On Sep 22, 2016
segcymoor:
Inserting d reinforcements
Nice one Sir. Are you doing a pile load test after this?
1 2 3 4 5 6 7 8 9 10 ... 51 Reply

2 Storey Building, 6blocks Of Flat @ LekkiWhat Are The Pros And Cons Of Flat Roof Design In NigeriaConstruction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch234

How Much To Build A Hotel In Nigeria (lagos, Anambara, Owerri)Nigeria’s First Storey Building Records 13,609 Visitors In 20183d Views Of Buildings By The Harneyproject Team