₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,346,292 members, 8,522,227 topics. Date: Friday, 20 November 2026 at 06:57 PM

Toggle theme

Buhari Lays Foundation Of A Shopping Mall In Abakaliki, Ebonyi (Pictures) - Politics (3) - Nairaland

Nairaland Forum › Nairaland General › Politics › Buhari Lays Foundation Of A Shopping Mall In Abakaliki, Ebonyi (Pictures) (27289 Views)

1 2 3 Reply (Go Down)

Re: Buhari Lays Foundation Of A Shopping Mall In Abakaliki, Ebonyi (Pictures) by pasol4real(m): 11:49pm On Nov 14, 2017
updatechange:
IPods gonna have sleepless night today grin
Why ?
Re: Buhari Lays Foundation Of A Shopping Mall In Abakaliki, Ebonyi (Pictures) by raphaeladeyele: 3:05am On Nov 15, 2017
lpob niussance, Buhari na Baba
Re: Buhari Lays Foundation Of A Shopping Mall In Abakaliki, Ebonyi (Pictures) by safetyInspector(m): 5:04am On Nov 15, 2017
Bros fund is not all that matters in construction. I have over ten years experience in this field. If you have been to Dubai mall you will agree with me that the aquarium and the water fall alone cant be completed in four months. There are many things to consider in construction, HSE, QA/QC and construction sequence. You cant over employ to meet target because that might be diminishing return and not all activities can be done at night if you choose to work day and night. Concrete need 21days for perfect curing before load will be placed on it. The escalators, lifts, HVAC, glazing works can only be done only when the structure has taken form. The only way to achieve near completion for such project is if the employ precast system. They need to precast most of the columns, drain system and if possible the floor.
Funnicator:
Says who. All you need is the fund.
You're obviously not into construction work.
Re: Buhari Lays Foundation Of A Shopping Mall In Abakaliki, Ebonyi (Pictures) by Nobody: 7:29am On Nov 15, 2017
safetyInspector:
Bros fund is not all that matters in construction. I have over ten years experience in this field. If you have been to Dubai mall you will agree with me that the aquarium and the water fall alone cant be completed in four months. There are many things to consider in construction, HSE, QA/QC and construction sequence. You cant over employ to meet target because that might be diminishing return and not all activities can be done at night if you choose to work day and night. Concrete need 21days for perfect curing before load will be placed on it. The escalators, lifts, HVAC, glazing works can only be done only when the structure has taken form. The only way to achieve near completion for such project is if the employ precast system. They need to precast most of the columns, drain system and if possible the floor.
So that mall can't be completed in 12months with adequate fund?
Re: Buhari Lays Foundation Of A Shopping Mall In Abakaliki, Ebonyi (Pictures) by safetyInspector(m): 8:56am On Nov 15, 2017
Such mall can't be completed within that time frame.
It is easy to complete 1000 bungalows with finishing in one year than to complete Dubai mall in one year.
Even the underground car park will take minimum 3 months to complete before starting of the main structure. The car park alone is more than two football field.
Funnicator:
So that mall can't be completed in 12months with adequate fund?
1 2 3 Reply

Ruga: IPOB Protests In Abakaliki, Ebonyi (Photos) • Dave Umahi Building Project In Abakaliki, Ebonyi (Photos) • Aerial View Of Abakaliki, Ebonyi State (Photos) • 2 • 3 • 4

Reps To Increase Fuel Price By N5 For Roads • APC Presidential Primary: Tinubu, Ganduje Visit Obong Of Calabar • Full Text of the Appeal Court Judgement on Nnamdi Kanu