Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? (19343 Views)

Buhari’s $22.7 Billion Loan Spending Plan: $1.25bn For Abuja Rail, $500m For NTA / 2019 Presidency: Reconcile With Obasanjo Or Forget It – Jonathan Tells Atiku / The Blame For Nigeria Falls Not On Buhari, Jonathan, Obasanjo Or Even Abacha!!! (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by erunz(m): 2:54pm On Jan 08, 2018
On Thursday, President Muhammadu Buhari was in Kaduna state to inaugurate new coaches and locomotives for the Abuja-Kaduna train service.

The president, after the inauguration, took a train ride from Rigasa to Kakuri on the outskirts of Kaduna to inaugurate Nigeria’s first inland dry port.

Commenting via Twitter, Ben Murray Bruce, senator representing Bayelsa east, asked Buhari to thank ex-President Goodluck Jonathan for availing him the opportunity to ride on the train.

Bruce said the rail system in question was “entirely” Jonathan’s achievement.

But Nasir el-Rufai, Kaduna state governor, replied Bruce, saying the administration of former President Olusegun Obasanjo – “which Jonathan was not part of” – initiated and raised funds for the project.

But Bruce stood his ground, challenging el-Rufai to a public debate on the issue.

In August 2017, a similar controversy had risen as to who approved the rail lines from Kano to Daura and Jibia local government areas of Katsina.

Just like the Daura-Jibia, Kano-Lagos rail lines, the Abuja-Kaduna is not a new initiative. It is in a plan approved by Jonathan, which Buhari is now implementing.

So, whose project is really the Abuja-Kaduna railway system?
FACT 1: OBASANJO CONCEIVED THE PROJECT

On October 9, 2006, Obasanjo said “no nation has achieved holistic development without a coherent, integrated, efficient and reliable transportation system” while setting out his vision for the revitalisation of Nigeria’s 3500km rail network.

The grand plan is summed as the Lagos-Kano standard gauge modernisation project. The contract was awarded to China Civil Engineering and Construction Co (CCECC), for $8.3bn, to be funded with a soft loan of from China.

However, due to funding problems, it was later redesigned to be executed in standalone segments and the existing 1,124km narrow gauge Lagos-Kano line was rehabilitated.

Bruce says Jonathan deserves the ‘entire’ credit

The Abuja-Kaduna segment is the first to be implemented as part of the standard gauge project.

Obasanjo added that a new line would be built for 100km from Minna to Abuja, continuing for 205km beyond the capital to Kaduna. He also said phase II would see reconstruction of the Port Harcourt-Jos route.

The agreement with CCECC was done that month.
FACT 2: YAR’ADUA STALLED IT

However, in November 2007, the Yar’Adua administration stopped the project due to “paucity of fund”.

Diezani Alison-Madueke, then minister of transportation, announced that the programme was “posing challenges to the current administration”.

The intention to source funding from the country’s excess crude account had “constitutional limitations”, she said, and an anticipated $1.28bn loan from China “crashed for a number of reasons”.

Yar’Adua was worried that the first payments were made without appropriation and there was no engineering design in place, according to a senior official in his administration who spoke with TheCable off-record.

El-Rufai says it was Obasanjo’s idea

“Yar’Adua insisted that the proper thing must be done, and even invited the respected geographer and urban planning expert, Professor Akin Mabogunje, to a meeting to discuss how the entire rail system could be modernised,” the former official said.

The Abuja-Kaduna project was then finalised in 2009. The contract for building the new line was awarded in December 2010.

Yar’Adua was in power then, even though he was battling health issues, and Jonathan was his deputy.
FACT 3: JONATHAN STARTED THE PROJECT

According to Railway Technology, the construction of the Abuja-Kaduna rail line started in February 2011 and was completed in December 2014.

Jonathan was acting president from February to May 2010 and president from May 2010 to May 2015.

The Abuja-Kaduna segment is the first to be implemented as part of the Lagos-Kano standard gauge project under the first standard gauge railway modernisation projects (SGRMP) in Nigeria.

In October 2014, the federal executive council (FEC) approved $6.6 million for the procurement of two locomotives for the Abuja- Kaduna rail.

After Jonathan assumed power upon winning the 2011 presidential election, he initiated the high-speed rail project.

In 2014, it was rated by KPMG, one of the leading consulting firms in the world, to be among the global top 100 world-class infrastructure projects.

The rail will connect Lagos, Kano, Kaduna, Warri, Bauchi, Abuja, and Port Harcourt and will cost the country $13 billion, much of which will be financed with a loan from the Export Import Bank of China.

The China Railway Construction Corporation secured the contract to build the 3,218km network, which will be digitally operated using fibre-optic cables, radio communication and wireless services.

The project is designed to cover 54 stations and will take 25 years to build.
FACT 4: BUHARI IS COMPLETING THE PROJECT

The Jonathan administration could not have lasted 25 years, given Nigeria’s four-year term for presidency. At most, he might have won his 2015 re-election bid and would have spent nine years in power.

As government is a continuum, the project did not fade with the end of his tenure. Buhari took over and is finishing what Jonathan started.

The 187 km standard gauge line between Kaduna and Abuja was inaugurated by Buhari on July 26, 2016, with standard gauge railway tracks from Idu, near Abuja, to Kaduna in the north-western region of Nigeria.

It has ten stations and features both passenger and cargo trains.

Senate President Bukola Saraki had said the launch is “indeed an epoch-making event as it pushes Nigeria closer to achieving economic diversification by bridging the gaps in our nation’s infrastructure”.

And upon the completion of the rail line, Buhari travelled to Kaduna to inaugurate it.

The inauguration is no longer within the powers of Obasanjo and Jonathan, even though they had worked on the project before Buhari.
THE ABUJA LIGHT RAIL VS THE ABUJA-KADUNA RAIL SYSTEM

With nine intermediate stations, the Abuja-Kaduna trains run at a maximum speed of 100 km/h. At its southern end, the line terminates at Idu, about 20km from central Abuja, where there will be an interchange with the Abuja light rail, a 78km intra-city rail line.

The Abuja light rail is a different project from the Abuja-Kaduna rail line, but still part of the grand plan birthed by the Obasanjo-led administration.

While the Abuja-Kaduna rail line will connect Lagos, Kano, Kaduna, Warri, Bauchi, Abuja, and Port Harcourt, the Abuja light rain will run only within the capital city.

The first phase of the Abuja light rail project will connect the city centre to Nnamdi Azikiwe International Airport, stopping at the standard gauge railway station in Idu.

The project was 90 percent complete as of March 2017 and was supposed to be launched in December of the same year.
CONCLUSION

When the roads of three streets merge to form a crossroad, the meeting point belongs to all of the streets or none of them. Such is the case with the Abuja-Kaduna rail system.

However, Jonathan did the major part of the work and deserves a bigger chunk of the cake of acknowledgement. If he had not pursued the project, maybe Buhari would not have had to complete it.

https://www.thecable.ng/fact-check-obasanjo-jonathan-buhariwhose-is-the-abuja-kaduna-rail-line

14 Likes 3 Shares

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by TheAnimatorsHub: 3:00pm On Jan 08, 2018
the three both of them grin grin grin grin grin... on a serious note though, it's not about who starts nor who ends it. In my opinion, it is about what the masses stand to benefit from it

55 Likes 1 Share

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by hoygift(m): 3:01pm On Jan 08, 2018
OBJ be like everybody is saying it doesn't matter... grin grin grin

6 Likes 2 Shares

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by StRichard(m): 3:02pm On Jan 08, 2018
It doesn't matter, we have other issues to focus on.

8 Likes

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by auwalyau: 3:02pm On Jan 08, 2018
TheAnimatorsHub:
the three both of them grin grin grin grin grin... on a serious note though, it's not about who starts nor who ends it. In my opinion, it is about what the masses stand to benefit from it

Well said!

6 Likes

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by corperscorner: 3:02pm On Jan 08, 2018
Jobless people always creating distractions for the gullible masses...

27 Likes 4 Shares

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by emmasege: 3:02pm On Jan 08, 2018
In the spirit of sportsmanship, national unity and cohesion, Buhari should have invited GEJ as an honoured guest at the commissioning. Imagine what this would have done to his image as a nationalist and father of all. But how would he do that when he's surrounded by leeches like Elrufai and other bigots?.

105 Likes 12 Shares

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by opeolu202: 3:03pm On Jan 08, 2018
how am I supposed to know?
Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by Blackfire(m): 3:03pm On Jan 08, 2018
Nigerians started it and finished it...



Argue that with your nose

20 Likes

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by jerryunit48: 3:03pm On Jan 08, 2018
Truth is Buhari is taking glories for the work of past administrations am yet to see anything tangible he has done apart from bringing them back from Libya

50 Likes 3 Shares

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by dhabrite(m): 3:03pm On Jan 08, 2018
Nnamdi Kanu grin

The backlash from the afonjas as expected

1 Like

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by ozo13(m): 3:03pm On Jan 08, 2018
Dem sha don complete am and it will be beneficial to d masses
Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by Onozboy(m): 3:04pm On Jan 08, 2018
Me
Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by FbiSegun(m): 3:04pm On Jan 08, 2018
No hope for this Country! 3rd Q. B4 minimum wage! Refinery not functioning! (Since 1999 PDP/APC) Fuel subsidy fraud! Electricity Zero! Herdsmen killing! Boko Haram scaming! Food not affordable for common man!

Where is d HOPE?

3 Likes

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by Moreoffaith(m): 3:04pm On Jan 08, 2018
All of the above.
Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by matmat(m): 3:04pm On Jan 08, 2018
How does it add food to my table...

Nonsense.
Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by dust144(m): 3:05pm On Jan 08, 2018
It doesn't matter since it not buhari

5 Likes

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by Bustincole(m): 3:07pm On Jan 08, 2018
Both

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by Teewhy2: 3:07pm On Jan 08, 2018
why do we like politicizing things in this part of the world, government is a continuous process a project must be started by a government and if not completed by that government it must be continued and completed by the other government.
Yoruba will say " gbo omo fu oyon , gbo oyo fu omo , ki omo sa ti mu oyon ni".

3 Likes

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by castrol180(m): 3:08pm On Jan 08, 2018
whoever...
Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by magiki(m): 3:08pm On Jan 08, 2018
He that started it did well, He that continues and finish the project also did well.





Thank u

6 Likes

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by Inspire01: 3:09pm On Jan 08, 2018
It's PDP project simple

5 Likes 1 Share

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by kings09(m): 3:09pm On Jan 08, 2018
The point is buhari no just get achievement except spreading deaths n suffering.

How can a two-time leader be dis useless.

1 Like 1 Share

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by SNIPER123: 3:09pm On Jan 08, 2018
embarassed
Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by deji17: 3:10pm On Jan 08, 2018
The GEJ that used a generator just to light a bulb in the name of commissioning 15% completed Egbema power plant, would have invited Obama to help him commission Abuja-Kaduna rail line if he completed it.


To whom much is given, much is expected. Going by the oil windfall between 2007 and 2014, the rail line should have been completed in 2012 if not for the fact that stealing was not corruption under the hero.

8 Likes 2 Shares

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by famuchie: 3:11pm On Jan 08, 2018
The Answer is in the write-up.

They all should get the credit. However, OBJ conceived the idea and initiated / agreed a contract with the same vendor that completed the project, therefore he should be the grand patron!

Please note that GEJ drove a tractor on Lagos - Ibadan expressway in 2011, he should not get credit for that road once completed.


erunz:


https://www.thecable.ng/fact-check-obasanjo-jonathan-buhariwhose-is-the-abuja-kaduna-rail-line

1 Like

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by Daveliz(m): 3:11pm On Jan 08, 2018
The most important thing things are improving in our time.

1 Like

Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by encryptjay(m): 3:12pm On Jan 08, 2018
See nonsense wey we dey argue about when dem suppose dey think of better things
Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by yeyeboi(m): 3:12pm On Jan 08, 2018
Ok
Re: Whose ‘Handiwork’ Is Kaduna-Abuja Rail? Obasanjo Or Jonathan? by GrandMufti: 3:12pm On Jan 08, 2018
Ok

20 Likes 1 Share

(1) (2) (3) (Reply)

Hope Democratic Party, HDP: Buhari Must Not Be Sworn-in On May 29 - / Court Orders Final Forfeiture Of Okorocha's Properties / Governor Sanwoolu Casts His Vote, Advises Peaceful Conduct Of The People

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 33
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.