Second River Niger Bridge: Less Haste, No Speed - Politics - Nairaland
Nairaland Forum › Nairaland General › Politics › Second River Niger Bridge: Less Haste, No Speed (740 Views)
| Second River Niger Bridge: Less Haste, No Speed by Cooly100(op): 1:55pm On Mar 21, 2018 |
Four years and over N40billion later, the second River Niger bridge is only at the preparatory stage for a construction that is supposed to span five years, it’s moving at a pace that will make a snail beats its chest in pride, writes ISAAC ANYAOGU, who visited the project sites. http://www.businessdayonline.com/second-river-niger-bridge-less-haste-no-speed/
|
| Re: Second River Niger Bridge: Less Haste, No Speed by Cooly100(op): 1:58pm On Mar 21, 2018 |
Where are those one Nigeria liars, who always add this as achievement of this present administration? I don't think they have added anything than what the past administration has done on the project. This is the longest bridge project in Nigeria history...simply because it is cited in the eastern part of Nigeria. |
| Re: Second River Niger Bridge: Less Haste, No Speed by Cooly100(op): 2:04pm On Mar 21, 2018 |
This project started before the $1.8billion Abuja - Kaduna rail system... which has since been completed.
|
| Re: Second River Niger Bridge: Less Haste, No Speed by Cooly100(op): 2:08pm On Mar 21, 2018 |
PastorLucifer:When are you going to stone the lucifer..?
|
Buhari: No Haste In Withdrawal Of Military From Troubled Communities • Mungo Park Did Not Discover River Niger – Prof Yemi Osinbajo • Amaechi, Yahaya Bello Flag Off Dredging Of River Niger Ajaokuta-Onitsha Waterway • 2 • 3 • 4
Lady Refuses To Accept Boyfriend’s Breakup, Says He Widened Her Veejay • Why Nigeria Needs Sowore Omoyele As Next President, Come 2019! • Picture Of Niger State Governor Eating In A Bukar