GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts - Politics (2) - Nairaland
Nairaland Forum › Nairaland General › Politics › GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts (1557 Views)
| Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by deomelo: 8:01pm On Aug 01, 2018 |
The lying ipobs don run away ni? ![]() |
| Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by koboko69: 8:09pm On Aug 01, 2018 |
wirinet:Jonathan didnt even leave power at "just under 7500Ws. What is the highest electricity that Nigeria have ever produced in the first place? |
| Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by wirinet(m): 8:12pm On Aug 01, 2018 |
FarahAideed:OK, let's start from the very first onyour list; The Aba power station was an IPP project. The project was conceived in 2005; it was part of Obasanjo's IPP projects. The development of Aba IPP was based on a commercial study and technical audit of the Aba Island conducted in 2005 by the project promoter Geometric Power in collaboration with Power Holding Company of Nigeria and sponsored by International Finance Corporation of the World Bank.The project was established and funded by Geometric Power limited, it has little to do with Jonathan. Up till today, the project is not yet completed, it was only phase one that was finished in 2014. |
| Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by deomelo: 8:12pm On Aug 01, 2018 |
Nigeria: Yar'Adua to Launch N19.2 Billion Zamfara Power Plant ...Looting and stealing is not corruption Jona also traveled back in time to 2008 to lay foundation for Zamfara power plant with Yar'Adua..? ipobs and fraud are like brothers and sisters.. ![]() |
| Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by Butterflyleo: 8:14pm On Aug 01, 2018 |
deomelo:Kuku kill them ![]() |
| Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by wirinet(m): 8:17pm On Aug 01, 2018 |
koboko69:I was talking about installed capacity and not generating capacity. Installed capacity is the capacity the power station is designed for. The available capacity is the capacity the power station can generate under uptimal conditions and the generated capacity is the actual power the power stations are generating and capable of distributing. The highest power Nigeria had ever generated is about 5,200 MWs. |
| Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by deomelo: 8:42pm On Aug 01, 2018 |
Butterflyleo:I gave them rope make den take hang themselves with, but den see the rope and pick race.. ![]() |