New Pictures/updates From The Construction Site Of The Second Niger Bridge - Politics - Nairaland
Nairaland Forum › Nairaland General › Politics › New Pictures/updates From The Construction Site Of The Second Niger Bridge (780 Views)
| New Pictures/updates From The Construction Site Of The Second Niger Bridge by emmy9688(op): 8:54am On Aug 07, 2018 |
The construction of the 2nd Niger bridge is ongoing, both at the Onitsha end and at the Asaba end. The preconstruction involves 4 stages, after that the main construction work will start. The work is now in stage 4. The Asaba end has progressed quite a bit. Piles designed to support the bridge are being sunk, 310 out of 615 have been sunk so far. The bridge is expected to be completed in 2020. Also from the pics, you will see the ongoing construction of the link roads to the 2nd Niger bridge. See more pictures and read more http://enigeria.com.ng/new-pictures-updates-from-the-construction-site-of-the-ongoing-second-niger-bridge-onitsha-asaba
|
| Re: New Pictures/updates From The Construction Site Of The Second Niger Bridge by Nbote(m): 8:57am On Aug 07, 2018 |
D work still dey as e dey since 2yrs now jor |
| Re: New Pictures/updates From The Construction Site Of The Second Niger Bridge by spyder880(m): 8:58am On Aug 07, 2018 |
Same old pictures |
| Re: New Pictures/updates From The Construction Site Of The Second Niger Bridge by Metuh: 9:02am On Aug 07, 2018 |
emmy9688:old recycled pictures. It's still at the same place GEJ left it. |
| Re: New Pictures/updates From The Construction Site Of The Second Niger Bridge by Racoon(m): 9:03am On Aug 07, 2018 |
Lies these are old pictures. ![]() |
| Re: New Pictures/updates From The Construction Site Of The Second Niger Bridge by JasonScoolari: 9:09am On Aug 07, 2018 |
Recycling old pics all for 2019? Shame! ![]() |
Anambra Governorship Election 2021 Results Updates From Polling Units (Pictures) • #LekkiTollGate: Live Updates From #OccupyLekkiTollgate Protest (Pictures, Video) • New Pictures Of Sanusi At His Lagos Residence • 2 • 3 • 4
Obaseki Pays August Salaries Ahead Of Eid-el Kabir Holidays, Attributes Edo’s... • Hurricane Osinbajo • 2019: After Eagle Square Refusal, Kwankwaso Announces New Venue For Presidential
