Apapa Wharf Road Ready In September — NPA MD - Politics (2) - Nairaland
Nairaland Forum › Nairaland General › Politics › Apapa Wharf Road Ready In September — NPA MD (8327 Views)
| Re: Apapa Wharf Road Ready In September — NPA MD by citizenY(m): 12:48pm On Aug 13, 2018 |
Jjc2000:Yes, after they finish dem go carry am to north. |
| Re: Apapa Wharf Road Ready In September — NPA MD by ogunsj: 1:56pm On Aug 13, 2018 |
Smartini:if you know the said road well, can you tell us the extent of work done so far? you people enemy of progress come on nairaland to mislead people mischievously. that road is 90% or more completed. they are already joining the road to the marine bridge head , while some are rounding up the eleganza end. maybe you only see barracks portion and you are thinking they are only working there imagining when they will ever get to whalf. those guys are doing solid work there. |
| Re: Apapa Wharf Road Ready In September — NPA MD by CofOLandOfPeace(m): 11:31am On Aug 16, 2018 |
This sure will bring about a BIG relief to Lagosians. Please check signature in blue below and get in touch to enjoy our Free Real Estate/Property Consulting services!!! |
| Re: Apapa Wharf Road Ready In September — NPA MD by CofOLandOfPeace(m): 12:01pm On Aug 16, 2018 |
[color=pink]This sure will bring about a BIG relief to Lagosians. Please check signature in blue below and get in touch to enjoy our Free Real Estate/Property Consulting services!!! [/color] |
| Re: Apapa Wharf Road Ready In September — NPA MD by CofOLandOfPeace(m): 12:01pm On Aug 16, 2018 |
This sure will bring about a BIG relief to Lagosians. Please check signature in blue below and get in touch to enjoy our Free Real Estate/Property Consulting services!!! |
| Re: Apapa Wharf Road Ready In September — NPA MD by NL1960: 12:43pm On Aug 16, 2018 |
Smartini: ogunsj:No mind the guy. He thinks it is the Apapa-Oshodi expressway portion from Tin-Can through Coconut through Mile 2 through Oshodi that the NPA MD is talking about. I doubt he knows where Wharf road is in Apapa. I like the methodical way they have been going about it which still makes traffic to move despite the challenges. Iam sure they might have completed and opened it this August ending if not for the bridge being repaired by JB through the ministry of works. |
East-West Road Ready By December, Eleme Road To Open In 10 Days – David Umahi • Mohammed Koko Replaces Hadiza Bala Usman As NPA MD • AG Dangote Completes Apapa-wharf Concrete Road, • 2 • 3 • 4
"APC Won't Miss Migrant And Rolling Stone Politicians" - Oshiomhole Says • P&ID: FG Secures Variation Of UK Court Order On $200m Deposit • CCB Invites Magu Over Alleged Assets Fraud
