| Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by Magichand(op): 1:52pm On Oct 12, 2018*. Modified: 2:08pm On Oct 12, 2018 |
The Federal Government under President Muhammadu Buhari has listed its projects across all 36 states since coming to office in 2015.Read more: https://zenithnaija.com/completed-and-ongoing-projects-by-the-buhari-administration-across-the-36-states/ cc: lalasticlala dominique Mynd44 |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by baliyubla: 1:56pm On Oct 12, 2018*. Modified: 2:55pm On Oct 12, 2018 |
Projects on the pages of papers. I even saw patching of pot holes repeatedly in the write up as projects. This one weak me.
|
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by princechurchill(m): 2:21pm On Oct 12, 2018 |
Buhari ogaghi adiri gi na mma
|
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by Philistine(m): 2:30pm On Oct 12, 2018 |
Patching of potholes is now a project....Buhari really fall hand sha! |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by comos: 2:32pm On Oct 12, 2018 |
Edo state: Azura power Plant was built GEJ There is no street light done by APC in Benin city, The working solar street light was done by Marthew Uroghide (PDP, Edo south senator) |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by UCyril: 2:34pm On Oct 12, 2018 |
So this man only patched road in Ebonyi State. Nawa ooh. |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by LadyExcellency: 2:36pm On Oct 12, 2018 |
This is small to pass for a second term. |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by Sirjamo: 2:36pm On Oct 12, 2018 |
I can attest to a few of these projects: Potisku - Damaturu road Damaturu - Dapchi - Bayamari Kano - Kaduna - Abuja road Enugu - Lopanta road Gombe - Numan road |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by LadyExcellency: 2:37pm On Oct 12, 2018 |
Jonathan listed more than this and still lost |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by Sirjamo: 2:39pm On Oct 12, 2018 |
UCyril:It's better than nothing, did PDP do anything in their 16 miserable years in power? |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by forgiveness: 2:41pm On Oct 12, 2018 |
Looks easy on paper but some are huge projects. E.g railway projects, road construction from Edo to Ogun state, Ibadan to Lagos express way etcetera. |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by Nemesis001: 2:43pm On Oct 12, 2018 |
Buhari and the clueless presidency are seriously mad aswear. ![]() Which 2nd Niger bridge and Ogoni clean up are these idiats talking about These lifeless things must be thinking all Nigerians are zombies. Nonsense |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by LadyExcellency: 2:44pm On Oct 12, 2018*. Modified: 3:21pm On Oct 12, 2018 |
Goodluck Jonathan list his achievements below and still lost: NORTH – EAST GEO – POLITICAL ZONE TARABA STATE: *SURE – P Project on primary Health Care ( PHC) *Construction of Takum and the Kashimbila Multi – Purpose Dam Project in Yangtu. *Establishment of a new Federal University in Wakari, Taraba *e – wallet system in the distribution of Agricultural Inputs to the farmers and the Dry Season farming projects *Construction of Silos in Taraba State *Construction of Jalingo – Kuna Lau Road (Section II) *Reinstatement of collapsed section of Wakari – Mutum Biyu Road in Taraba State. *Rehabilitation of Wukari – Takum Road, Wukari /Akwana Road. *Ongoing reconstructionof Zing – Yakoko – Monkin Road *Construction of Perishable Cargo Terminal in Jalingo *Ongoing recinstruction of Zing – Yakoko – Monkin road. GOMBE STATE: *Reinstatement of Collapsed section of Gombe – Potiskum road *Construction of Gombe – By Pass Road *Rehabilitation of Gombe – Numan – Yola Road (Section II) *Establishment of a new Federal University in Kashere, Gombe State *SURE – P projects on Primary Health Care (PHC) *e – Wallet System in the distribution of Agricultural Inputs to the farmers and the Dry Season Farming Projects *Construction of Export Crop Preservation and Conditioning *Establishment and Construction of Special AlmajiriSchool Provision of improved Cotton Seedlings Free of Charge for farmers Rehabilitation of Tumu – Pindaiga – Kashere Road Establishment of a new Teaching Hospital BAUCHI STATE: *Federal Government spent ₦11Billion on MDG’s Project in Bauchi State as 2013. *SURE – P Projects on Primary Health Centres *e – wallet system in the distribution of the agricultural inputs to farmers and the Dry Season farming Projects – under which incentives were provided for nothing less than 10,000 Dry Season rice farmers in Bauchi State. *Construction/ Rehabilitation of Yashi – Basher – Dengi section in Bauchi and Plateau States and Rehabilitation of Futuk – Yalo Road. *Rehabilitation of Futuk – Yalo Bauchi State *Establishment of Cancers Treatment Centre in Abubakar Tafawa Balewa Teaching Hospital Bauchi ADAMAWA STATE: *Establishment and Construction of Almajiri school *Provision of improved Cotton Seedlings free of charge for farmers *e – wallet System for the distribution of agricultural inputs to the farmers and Dry Season farming Projects *Rehabilitation and remodelling the Yola Airport *SURE – P Projects on Primary Health Centres *2 x 60 MVA, 132/33KV substation at Mubi, 2 x 60 MVA, 132 / 33 KV Substations at Gulak 132 KV double circuit transmission line, 30 MVA, 132/33 KV mobitra at Mayo Belwa, Adamawa state. *A new NAF Comprehensive Secondary School Yola commissioned. *Partial State of emergency to enhance democratic stability in Adamawa, Yobe and Borno States *Completion of Yola – Numan road in Adamawa *Ongoing 30MVA, 132/33KV Mobitra at Mayo Belwa, Adamawa State. Yola – song – Litle at Gombi – Mubi – Gulak 132kv Double Circuit Transmission Line. 2 x 60 MVA, 132/33kv *Substations at song, Little Gombi, Mubi and Gulak YOBE STATE: *Gashua – Hadejia 132KV double – circuit trasnsmission line, 2 x 60MVA, 132/33KV substation at Gashua and 2 x 132KV Line Bays Extension at Damaturu and Hadejia Substations. Damaturu – Gashua 132KV double – circuit *Transmission Line and Damaturu 2 x 150 MVA, 330/132KV Substation. *SURE – P Projects on Primary Health Care (PHC) *e – Wallet system in the distribution of Agricultural Inputs to the farmers and the Dry Season farming. *Establishment and construction of Special Almajiri School *Provision of improved cotton Seedlings free of Charge for farmers *Gashua Power Station Desertification Control Projects: Establishment of 15 Row Green Belt (80Km) and Presidential Initiative on Afforestation BORNO STATE: *Rehabilitation of Uba – Mbala Road *Dualization of Maiduguri – Kano Road *SURE – P Projects on Primary Health Care. (PHC) *Rehabilitation of the Maiduguri Airport *Enugu – PH – Maiduguri Railway Fixed.*e – Wallet system for the distribution of agricultural inputs to the farmers at subsidized rate and *Dry Season Farming projects. *Desertification Control Projects: Establishment of 15 *Row Green Belt (80 Km) and Presidential Initiative on Afforestation *Maiduguri 1 x 150 MVA, 330/ 132KV + 1 X 6 MVA 132 /33 KV substations. *Ongoing Maiduguri 1 x 150MVA, 330/132KV + 1x 60MVA, 132/33KV Substation *33KVA Transmission substation at Damboa / Biu Road. *Completion of Uba – Mbalala Road in Borno State SOUTH – SOUTH GEO – POLITICAL ZONE EDO STATE: Ihovbor power Station (451 MW) Rehabilitation of Benin – Ore – Sagamu dual carriage way. Asphalt overlay of 2km access road to the federal Science & Technical College on Uromi Emergency reinstatement of washout/gully erosion at KM 127 + 000 at Auchi along Okene – Benin road and 14 + 000 Km along Auchi Agenebode Road Benin – Auchi road rehabilitation and dualised SURE – P Projects on Primary Health Care (PHC) Ukpoke irrigation Projects Water supply projects in Northern Ishan of Edo State (9 million litres per day plant capacity) for Uromi, Ubiaja, Ugengu, Ugboha and Igueben 1 x 60 MVA , 132/ 33kv Substation reinforcement at Ukpilla substation and 2nd Benin – Onitha 330kv single – Circuit line Land reclamation and Erosion Control works project at Igonton – Igbanke and Iyom/Okhelen – Awo road Uromi Modernisation of University of Benin Teaching Hospital, Benin. NDDC Reconstruction of Benin – Abraka phase I in 2012, FG Commissioned a cultural Industry Centre in Auchi, Edo state. Construction of Jetties at Agenebode DELTA STATE: * Ongoing construction of Itakpe – Ajaokuta – warri modern railway * Inauguration of Illah irrigation project. * Second Niger Bridge – on going with SURE – P funds * SURE – P Projects on Primary Health Care (PHC) * Rehabilitation of Warri Refinery and the access roads to the Refinery * The NNDC Sponsored Projects: Nurse quarters, electricity projects ultra modern Health Centre and Solar Powered Water project * Supply and installation of Laboratory equipment at federal University of Petroleum Resources Effurun * e – wallet system in the distribution of agricultural inputs to the farmers and the Dry Season farming projects * New Library Projects at the Federal at the federal Government College (FGC) Warri and at the federal Government Girls College Ibusa * The Proposed $16 B Gas City Project at Ogidigben in Warri South West Area of Delta State to host: A gas processing plant, a fertilizer plant and a petro chemical plant Sea Port * 1 x 60 MVA Substation at Ughelli Power Plant and 1 x 30/40 MVA Substation reinforcement at Amukpe * NDDC Construction of Orhorbo – Odurubuo, Kpakama – Bomadi road phase I, Gberegolor – Ogriagbene Road * Land reclamation and erosion control works projects in Kurutie, Gbaramatu Clan Warri South, and Idumuje – Unor Erosion Control Project. * Canalization of Odobou – Ogbobagbene creek in Burutu LGA * Construction of Model Skill Acquisition Centre and the Rehabilitation of Agric – skills Training Centre. * Completion of the Capital dredging of the Lower River Niger from Warri (Delta state) to Baro (Niger State) 532km. * Supply of instruction materials to the Federal Government College Warri * Establishment of the Nigerian Maritime University and the NIMASA Shipyard & Dockyard at Okerekoko Warri CROSS RIVER STATE: * Qua Falls Dam and Irrigation Project, Dry season Farming and e – wallet system in the distribution of agricultural inputs to the farmers * Construction of an Export Crop Preservation and conditioning centre * Ongoing Obudu – Ogoja 132kv Double – Circuit Transmission line, 2 x 30/40 MVA 132 /33kv Substation at Ogoja * Sure – P Projects on Primary Health Care and others. * Periodic maintenance of Rumukurshi – Chokocho road; Reconstruction & Pavement strengthening of Ikom – Mfum Road ![]() * Revitalised Calabar Substation (561mw) * Rehabilitation of Ikom – Mfum (Cross River) – Abakiliki – Mbok (Ebonyi) * Construction of Calabar – Ikom – Katsina – Ala Road in Benue state * Rehabilitation of Margaret Ekpo International Airport Calabar * NDDC Ubana Utanga Water Project * NDDC Electrification Project * Modernisation of the University of Calabar Teaching Hospital * Land Reclamation and Erosion control works project in Essien town – Ekorin in community. * Construction of Agric Skills Training Centre in Cross River state. AKWA IBOM STATE: * Complete of Nkari Earth dam * Construction of 100,000 metric tonnes capacity silos * e – wallet system in the distribution of agricultural inputs to the farmers and the Dry season farming projects * SURE – P Projects on Primary Health Care (PHC) * Establishment of a new Federal Polytechnic in Ukana * Approved building of Ibaka Deep Seaport * Ibedu/Ibiako Rural Electrification Projects (Under NREP) with JICA’S grant aid Intervention * Land reclamation and erosion control works project in Ibakang Nsit – Ikot Ekpo – Unyene Road, * Nsit Attai in Akwa Ibom State. * Remediation, Rehabilitation and Restoration of the Oil impacted site at stubbs Creek, Eket –Akwa Ibom. * NDDC –Idoro – Eaten – Itam Water Project * Akwa Ibom State office of National Productivity Centre was established * Construction of 3 MDG/NDE skill Acquisition centres in each of the three Senatorial Districts in Akwa Ibom RIVERS STATE: * Revived Omoku sub power station (225mw) * Port Harcourt – Enugu – Maiduguri Rail Fixed * Owerri – Port Harcourt Road ( Ongoing) * SURE – P Projects on Primary Health Care (PHC) * e – wallet in the distribution of subsided agricultural inputs to the farmers and Dry Season farming Projects * Rehabilitation of the Port Harcourt International Airport. * NDDC Electrification projects in Khana LGA and Eleme * 10 rooms hostel at Immigration Training School at Ahoada * Construction of Jetties at Degena. * Establishment of Cancer Treatment Centre in UNIPORT Teaching Hospital. * Ongoing Rehabilitation of the Port Harcourt Refinery * Transformation of the Onne Oil and Gas Free Zone with 6 billion USD invested leading to the attraction of 150 companies into the zone with 30,000 jobs created to date * Establishment of a new Federal Oil and Gas Polytechnic at Bonny BAYELSA STATE: * Periodic maintenance of East – West – Odi Road * Gbarain sub power station (225mw) revitalized * Establishment of a new federal University in Otuoke * SURE – P Project on Primary Health Care (PHC) * e –wallet system in the distribution of Agricultural Inputs to the farmers and the Dry Season Farming Projects * Construction of the federal Government Secretariat in Yanagoa. * Central Ogbia Regional Water Supply Project in Otuoke * Construction of Jetties at Yenogoa * NDDC Electrification Projects in Peremabiri – Ogbokiri in Akassa Bayelsa State. * Establishment of Maritime Institute at the Niger Delta University Amasoma. |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by manuelzz(m): 2:44pm On Oct 12, 2018 |
Buhari is very shameless! Most of the so-called projects listed up there are non-existent! Cum 2019, they will all go back to Daura and monitor the progress of the projects from there. Crooks! The masses are now wiser and ATIKULATE. |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by Nemesis001: 2:45pm On Oct 12, 2018 |
Sirjamo:What do you know about governance ![]() Tell me one single thing Buhari has achieved if not recession and senseless killings of innocent Nigerians. |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by manuelzz(m): 2:47pm On Oct 12, 2018 |
UCyril:Even one pothole these thieves didn't patch! |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by etebefia: 2:49pm On Oct 12, 2018*. Modified: 3:32pm On Oct 12, 2018 |
Abia State Rehabilitation of Enugu-Port Harcourt Road Section 1 , Umuahia-Aba Township Rail/Road bridge crossing. Amaudo (Ntalakwu-Bende) Flood & Erosion Control Project Cassava Processing Plant Rehabilitation and Reconstruction of Enugu-Port-Harcourt dual carriageway Section 1, Lokpanta-Umuahia Tower, Abia. Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along umuahia- Bende – Ohafia Road Reconstruction off Yola Mubi Bridge at Kaa’aShiwa and Mile 30- Kwambla Road Rehabilitation of Gombe-Numan-Yola road, phase 1, Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ngurore Mayobelwa road. Anambra State Nanka Recent Landslide Project, Phase 1 Remediation Works on Nanka/Oko Gully Erosion Control. Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Nnewi – Ekwulobia – Umunze – Ibinta Road Enugu State Rehabilitation of Enugu–Onitsha dual carriageway. Obinagu/Akpulu/ EnuguezeUmunneobagu Soil Erosion And Flood Control Project Soil Erosion, Flood Control and Road Improvement Works at Federal College of Education, Eha-Amufu Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Nsukka – Adani – Anambra State Border Road This government is a government of lies. The bolded are lies. |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by Nobody: 2:50pm On Oct 12, 2018 |
Buhari is patching potholes nationwide. What did we do wrong to the gods to demand this punishment? |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by mycar: 2:50pm On Oct 12, 2018 |
Where are the pictures of the roads? I want to catch somebody now. |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by Ziggylady(f): 2:51pm On Oct 12, 2018 |
Useless people..'patching of roads' blablabla ....A list full of falsehood and lies,half of which were what Jonathan'administration did.So clear that they were berefit of ideas in the last 3years |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by Ziggylady(f): 2:52pm On Oct 12, 2018 |
Philistine:You beat me to it....to APC and her zombie supporters that is a 'massive' achievement. |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by Great2017: 2:55pm On Oct 12, 2018*. Modified: 4:07pm On Oct 12, 2018 |
Out of fear not to be sent back to Daura, patching of potholes has become a project. This really made me to laugh. The truth is that real power belongs to the people. Let us use this power to put the ruling class on their toes. Without us, they cannot be. |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by kelib: 3:04pm On Oct 12, 2018 |
So these are what 13billon dollar dept can do. |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by xcolanto(m): 3:12pm On Oct 12, 2018 |
Patching of roads in 2019 ![]() Thank God am fully atikulated!!! |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by bolinjkezzy(m): 3:15pm On Oct 12, 2018 |
So patching of potholes is a project in Nigeria? Who did we offend in this country. |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by bolinjkezzy(m): 3:19pm On Oct 12, 2018 |
forgiveness:Sure it is, but come to think of it president buhari deserve kwarans and some states votes based on patching of potholes for four years? |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by Nobody: 3:25pm On Oct 12, 2018 |
Govt of patch-patch ![]() Patch-patch govt ![]() |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by Donmedrac: 3:36pm On Oct 12, 2018 |
comos:thank you thank you.. APC are liars |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by mrvitalis(m): 3:39pm On Oct 12, 2018 |
comos:Do you know the work of a senator? |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by UCyril: 3:47pm On Oct 12, 2018 |
Sirjamo:afikpo - okigwe road, abakaliki - enugu road, federal university, abakaliki - ogoja road, etc |
| Re: Presidency Lists All Completed & Ongoing Projects In The 36 States Of The Countr by urchmanni93(m): 3:48pm On Oct 12, 2018 |
Sirjamo:Gej started enugu abakaliki road and completed it... Do ur research before writing rubbish. |