Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site - Travel - Nairaland

Nairaland Forum / Nairaland / General / Travel / Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site (31796 Views)

South West Regional Railway Will Link 44 Cities -DAWN / 90% Of Lagos-Ibadan Railway Has Been Completed, See Images From Various Sites / Lagos-Ibadan Railway: The Interior Of The New Trains (Photos) (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by AutoReportNG: 2:38am On Dec 21, 2018
The Federal government has restated its commitment to completing the Lagos-Ibadan Railway in good time as the Chinese Civil Engineering Construction Company (CCECC), the Contractor handling the Project was charged to expedite the pace of work on the Railway Project to ensure that the Rail Line is ready for usage by February 2019.

The Minister of Transportation, Rt. Hon Chibuike Rotimi Amaechi made this known on Tuesday, December 4, 2018, while briefing Journalists at Papàlanto in Ogun State immediately after the inspection tour of the Rail Line and Monthly Meeting of the project Monitoring Steering Committee of the Project.

According to him, “thank God the Press are impressed. I'm impressed? Yes.What I expected and I have told them (CCECC) is that there must be train on the track by February 2019, by that I mean, train on the track that makes transport sense such that we must be able to convey passengers from Lagos to Abeokuta and possibly to Ibadan and we must work towards achieving this target”, he said.

He further reiterated that the pace of work on the Railway project is progressing given that there are now minimal challenges that could hinder construction work. He noted that the challenge of constant rainfall was no longer there and the Contractor has few Bridges to be built. He affirmed that by the end of this month, they will have one or two bridges to build.

In order to accelerate the pace of work and achieve the new target, the Minister advised the Contractor to temporarily suspend work on the construction of Stations along the corridor of the Lagos-Ibadan Rail line and focus on the laying of tracks being the major work at the moment.

Given the Security situation at the Lagos axis of the Railway Project, Amaechi stated that CCECC has reported some incidences of Community harassment on the Contractor and Workers as well as theft to their equipment. He, therefore, charged CCECC to promptly seek the support of security agencies for adequate and effective policing of their personnel and equipment.

AutoReportNG got some exclusives from the site of inspection, and many others, check the pictures below...

[img]https://4.bp..com/-fQ7RXzBPAbI/XBqk_KGvvYI/AAAAAAAAW5s/lBSEx_VeB5Af8GTOwoQE_vdDHUYTBLbdwCLcBGAs/s1600/Lagos_Ibadan_Inspection_013_AutoReportNG.com.jpg[/img]

[img]https://4.bp..com/-OfRZzUNkMoo/XBqk__1Ed3I/AAAAAAAAW5w/ddJM0-fLvAkb5Kj9Ai6ppO3x46pzdb_UQCLcBGAs/s1600/Lagos_Ibadan_Inspection_014_AutoReportNG.com.jpg[/img]

Source:
https://www.autoreportng.com/2018/12/lagos-ibadan-to-be-completed-feb-2019.html

5 Likes

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by AutoReportNG: 2:38am On Dec 21, 2018

29 Likes 2 Shares

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by ipobarecriminals: 2:39am On Dec 21, 2018
cool cheesy grin wink smiley cool cool cool cool God bless Jubril el Sudanese.God bless Pa Osinbajo.God bless Rotimi .God bless Fashola.God bless the good pipu of Nigeria who believe in Pa Jubril El Sudanese. Thunder strike the man wey don sell Nitel/bouncing to sell NNPC.

157 Likes 14 Shares

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by Nobody: 3:12am On Dec 21, 2018
Op first worshipped their god (COW) before posting pictures

23 Likes 5 Shares

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by socialmediaman: 3:20am On Dec 21, 2018
Buhari’s final project before he ends up in Daura

9 Likes 4 Shares

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by ALMUSTAQIM(m): 3:27am On Dec 21, 2018
#PMB1523

#NEXTLEVEL

46 Likes 6 Shares

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by yomi96(m): 4:15am On Dec 21, 2018
Apc with cheap propaganda, No b December again, Feb reach dem go say August, mumu zombies, see dem mastubating all over the place. Abi no b the same ogun state wey I dey.

9 Likes 7 Shares

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by bender79: 5:23am On Dec 21, 2018
APC is waiting for the eve of election to commission the project . That will be a major campaign stratergy in the SW

10 Likes

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by helinues: 5:56am On Dec 21, 2018
In this present FG, no regions have it better than SW

Thank you baba Buhari for all the developments.

Our votes are secured for you

Buhari/Osinbajo lekansi jor

61 Likes 7 Shares

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by GoodofNaija: 5:59am On Dec 21, 2018
Lies & propaganda as usual grin
Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by braveboy64(m): 6:30am On Dec 21, 2018
4 more years

12 Likes 2 Shares

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by rottennaija(m): 6:31am On Dec 21, 2018
You just had to snap the cows too?

2 Likes 1 Share

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by sanpipita(m): 8:11am On Dec 21, 2018
If it doesn't get ready nko? all thanks to Goodluck Jonathan anyway, his foresight brought all this projects to fore.

1 Like 1 Share

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by FocusedDiva(f): 8:11am On Dec 21, 2018
God bless PMB!
God bless Nigeria.

11 Likes 2 Shares

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by seunfly: 8:12am On Dec 21, 2018
Great.

2 Likes

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by seunfly: 8:12am On Dec 21, 2018
sanpipita:
If it doesn't get ready nko? all thanks to Goodluck Jonathan anyway, his foresight brought all this projects to fore.

You people blame Buhari for destruction of the Economy while you praised Jonathan for completed projects by Buhari.

This just show why we are very backward in this nation, our mind is filled with sentiment and deciet while we also lies to our selves.

55 Likes 4 Shares

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by godfatherx: 8:12am On Dec 21, 2018
Abeokuta end though

2 Likes 1 Share

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by Nobody: 8:13am On Dec 21, 2018
More like lagos-ibadan express newspaper.
Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by Adam09: 8:13am On Dec 21, 2018
You have my PVC Jubrin, what PDP couldn't do in 16 yrs, you did it in 4 yrs despite all odds. I am confident that the Lagos - Calabar rail will be completed in the next 4 yrs, we the south south people are rooting for you.

Modified

This is a major infrastructural breakthrough.

33 Likes 5 Shares

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by MANNABBQGRILLS: 8:14am On Dec 21, 2018
GOOD JOB FEDERAL GOVERNMENT l.

Who needs campaign again with all these?!

Sai Baba, Your Government sure die.

Take us to the NEXT LEVEL

21 Likes 3 Shares

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by SojiCash(m): 8:14am On Dec 21, 2018
Total lies
Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by Dee60: 8:14am On Dec 21, 2018
I may not be a fan of PMB but he has achieved in 3 years what PDP failed to ouch in 16 years of failure.

OBJ should be ashamed that in 8 years not a single road or rail line was commissioned in Lagos area. Now the road to the airport in Lagos is near completion. Rail and road from Lagos is in progress. In 3 years.

Despite not having HALF of the income PDP enjoyed, these guys have done thrice in 3 years what PDP failed to do in 16 years.

I still cannot say I will vote APC but PDP is not an option. They want to come and sell the rest of Nigeria to their cronies and GFs. I heard they repented for their past sins, but they should also return the loot, then we can take them serious.

37 Likes 4 Shares

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by netsurfer01(m): 8:14am On Dec 21, 2018
Zombies always worshipping their "god"
SMH

1 Like 1 Share

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by Nobody: 8:14am On Dec 21, 2018
I am not surprised at AMAECHI
He should replace FASHOLA

WIKE still dey do IT for where AMAECHI dey

8 Likes 1 Share

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by Highsigher(m): 8:14am On Dec 21, 2018
yomi96:
Apc with cheap propaganda, No b December again, Feb reach dem go say August, mumu zombies, see dem mastubating all over the place. Abi no b the same ogun state wey I dey.


Shatap!!!!!

15 Likes 1 Share

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by SingleWahala(f): 8:15am On Dec 21, 2018
grin

11 Likes 1 Share

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by AdesegunSanni89: 8:16am On Dec 21, 2018
socialmediaman:
Buhari’s final project before he ends up in Daura
At least buhari has this project to show. Wetin your papa get to show?

8 Likes

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by omoalayo(m): 8:16am On Dec 21, 2018
APC has used every thing good about this project to campaign o..

Wetin come remain for the project nah...

Them cruise ontop am some few days ago..

Today again... New story...
Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by efighter: 8:17am On Dec 21, 2018
yomi96:
Apc with cheap propaganda, No b December again, Feb reach dem go say August, mumu zombies, see dem mastubating all over the place. Abi no b the same ogun state wey I dey.

Post the one your PDP did in your 16years of looting.

13 Likes 1 Share

Re: Lagos-Ibadan Railway Will Be Ready In February 2019, See Photos From The Site by sanpipita(m): 8:17am On Dec 21, 2018
seunfly:


You people blame Buhari for destruction of the Economy while you praised Jonathan for completed projects by Buhari.

This just show why we are very backward in this nation, our mind is filled with sentiment and deciet while we also lies to our selves.

Why are you angry, isn't it Jonathan that started these projects and yes Buhari is to be blamed by our bad economy he made things worse

1 Like 3 Shares

(1) (2) (3) (Reply)

Welcome To USA - Tips And Tricks For Immigrants / Rampaging Camels Cause Accident In Jigawa State (Photos) / Air Force Helicopter Crash-lands In Katsina

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 26
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.